Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹28.4 L
EMD Value
₹28,500
Closing Date
2 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Chief Officer, Thangadh Nagarpalika
Bid Documents for City Beautification of Circle Development Work in Thangadh Municipality Area, Thangadh. (Under Swachh Shaher Sundar Shaher Grant Year 2026-27)
365873
2026-27/ City Beautification Work
Open
Civil Works
Works
Surendranagar
3 documents required · 3 mandatory
₹1,500
The Chief Officer, Thangadh Nagarpalika
₹28,500
16 Nov 2026
16 Nov 2026
16 Nov 2026
2 Dec 2026
16 Nov 2026
120 days
Name Of Work :-
(Under Swachh Shaher Sundar Shaher Grant Year 2026-27)
SUMMARY (SCHEDULE-B)
Sr. No Name of work Total Cost
Schedule - B1 Circle Development Work at Nr. Surya Chowk, at Thangadh Municipality.
Circle Development Work at Nr. Khakhrali Chowk, at Thangadh
Constructing Fountain at Aazad Chowk In Thangadh Nagaralika, Dist.-
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges,
after deducting the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________% (should be writtern in figure and
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
1. All the work shall be carried out as per MOST specification and specification on the division or as directed.
2. Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
conditions, site moisture weather etc.
3. In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference
in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra
payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI
laboratory only.
4. The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of
work and amount involved at site without any payment as directed by the Engineer in charge.
5. Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid
by the CHIEF OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the
works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6. The contractor shall quote even "NIL" if no reduction is proposed.
7. One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments
and conditions of service Act-1996)
8. Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9. The contractor is solely responsible to bare all applicable taxes. IT. etc. and department will not entertain any contractor representation to
reimburse any financial burden due to applicable taxes : i.e. I.t etc.
Signature of contractor Chief Officer
Thangadh Municipality
THANGADH MUNICIPALITY
Circle Development Work at Nr. Surya Chowk, at Thangadh Municipality.
SCHEDULE - "B1"
Quantities Estimated Rates Total Amount
Quantities Estimated Rates Total Amount
Item Estimated according to
Item Descrption Unit
No. but may be estimated
in Figure in Words
more or less quantities.
Excavation for foundation up to 1.5 Meter depth
including sorting out and stacking of useful
materials and disposing of excavated stuff up to Rupees One Hundred Seventeen
50 Meter lead (a) For Loose or Soft soil and Eight Paise Only
Excavation for foundation up to 1.5 Meter depth
including sorting out and stacking of useful
Rupees One Hundred Forty Nine
2 1.53 materials and disposing of excavated stuff up to 149.67 Cum.
and Sixty Seven Paise Only
50 Meter lead (b) Dense or hard soil
Demolition and disposal of unserviceable
materials with all lead and lift.(i) Lime concrete. Rupees Five Hundred Fifteen
and Forty Paise Only
Filling available excavated earth (excluding
rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20 cm. In depth Rupees One Hundred Thirty and
consolidating each deposited layer by ramming Thirty Nine Paise Only
Filling in foundation and plinth with murrum or
selected soil in layers of 20 cm thickness
Rupees Two Hundred Eighty Two
5 34.97 including watering, ramming and consolidating 282.02 Cum.
and Two Paise Only
Providing and laying cement concrete 1:2:4 (1-
cement : 2- coarse sand : 4- graded stone
Rupees Three Thousand Six
aggregate 20 mm. Nominal size) and curing
6 1.70 3631.49 Hundred Thirty One and Forty Cum.
complete excluding cost of form work in : (a)
Nine Paise Only
Foundation and plinth
Providing and laying cement concrete 1:3:6 (1-
Cement : 3- Coarse sand : 6- crushed stone Rupees Three Thousand Nine
7 0.60 aggregates 20 mm nominal size) and curing 3974.36 Hundred Seventy Four and Thirty Cum.
complete including cost of formwork in (A) Wall Six Paise Only
Brick work using common burnt clay building
Rupees Four Thousand Three
bricks having crushing strength not less than
8 3.51 4388.47 Hundred Eighty Eight and Forty Cum.
kg./Sq.Cm. in foundation and plinth in Cement
Seven Paise Only
ortar 1:5. (1- Cement : 5 -fine sand) (A) Modular
20mm thick sand faced cement plaster on walls
upto height 10 metres above ground level
consisting of 12mm thick backing coat of C.M.
Rupees Three Hundred Twenty
9 22.94 1:3 (1-cement : 3-sand) and 8mm thick finishing 326.11 Sqm
Six and Eleven Paise Only
coat of C.M. 1:1 (1-cement : 1-sand) etc.
Finishing wall with weather proof exterior
emulsion paint on wall surface (two coats) to
give an required shape even shade after Rupees One Hundred Fourteen
thoroughly brushing the surface to remove all and Fifty Three Paise Only
dirt, and remains of loose powdered
materials.etc complete
Rupees Seven Hundred Fifty
Constructing a Circle Development work as per Four Thousand Two Hundred
Quotation, etc. Complete. Thirty Seven and Twenty Nine
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting the
cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Thangadh Municipality
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
conditions, site moisture weather etc.
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the
difference in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However
no extra payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be
done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of
work and amount involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be
5) paid by the CHIEF OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of
the works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of
7) the Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of
equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. GST etc. and department will not entertain any contractor representation to
reimburse any financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor Chief Officer
Thangadh Municipality
THANGADH MUNICIPALITY
Circle Development Work at Nr. Khakhrali Chowk, at Thangadh Municipality.
SCHEDULE - "B2"
Quantities Estimated Rates Total Amount
Quantities Estimated Rates Total Amount
Item Estimated according to
Item Descrption Unit
No. but may be estimated
in Figure in Words
more or less quantities.
Excavation for foundation up to 1.5 Meter depth including
sorting out and stacking of useful materials and disposing
Rupees One Hundred Seventeen
1 1.02 of excavated stuff up to 50 Meter lead (a) For Loose or 117.08 Cum.
and Eight Paise Only
Excavation for foundation up to 1.5 Meter depth
including sorting out and stacking of useful materials
Rupees One Hundred Forty Nine
2 1.02 and disposing of excavated stuff up to 50 Meter lead 149.67 Cum.
and Sixty Seven Paise Only
(b) Dense or hard soil
Demolition and disposal of unserviceable materials with
Rupees Five Hundred Fifteen and
3 2.26 all lead and lift.(i) Lime concrete. 515.40 Cum.
Forty Paise Only
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers not
Rupees One Hundred Thirty and
4 1.22 exceeding 20 cm. In depth consolidating each 130.39 Cum.
Thirty Nine Paise Only
deposited layer by ramming and watering
Filling in foundation and plinth with murrum or selected
soil in layers of 20 cm thickness including watering,
ramming and consolidating etc. complete. Rupees Two Hundred Eighty Two
and Two Paise Only
Providing and laying cement concrete 1:2:4 (1- cement
: 2- coarse sand : 4- graded stone aggregate 20 mm.
Rupees Three Thousand Six
Nominal size) and curing complete excluding cost of
6 0.51 3631.49 Hundred Thirty One and Forty Cum.
form work in : (a) Foundation and plinth
Nine Paise Only
Providing and laying cement concrete 1:3:6 (1- Cement
: 3- Coarse sand : 6- crushed stone aggregates 20 mm Rupees Three Thousand Nine
7 0.40 nominal size) and curing complete including cost of 3974.36 Hundred Seventy Four and Thirty Cum.
formwork in (A) Wall Caps / Coping Six Paise Only
Brick work using common burnt clay building bricks
Rupees Four Thousand Three
having crushing strength not less than 35 kg./Sq.Cm. in
8 2.34 4388.47 Hundred Eighty Eight and Forty Cum.
foundation and plinth in Cement ortar 1:5. (1- Cement :
Seven Paise Only
5 -fine sand) (A) Modular
20mm thick sand faced cement plaster on walls upto
height 10 metres above ground level consisting of
12mm thick backing coat of C.M. 1:3 (1-cement : 3- Rupees Three Hundred Twenty
sand) and 8mm thick finishing coat of C.M. 1:1 (1- Six and Eleven Paise Only
cement : 1-sand) etc. complete.
Providing and laying Polished Granite slab (18mm
thick) slab flooring over 20mm (Average) thick base of
cement mortar 1:6 (1-cement : 6-Coarse sand) or L.M. Rupees Three Thousand Six
10 11.31 1:1.5 laid over and jointed with grey cement slurry 3625.40 Hundred Twenty Five and Forty Sqm
including rubbing and polishing complete (A) Granite Paise Only
slab 18mm thick
Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give an required
Rupees One Hundred Fourteen
11 6.79 shape even shade after thoroughly brushing the 114.53 Sqm
and Fifty Three Paise Only
surface to remove all dirt, and remains of loose
powdered materials.etc complete
Providing and laying controlled cement concrete M.200
and curing complete excluding the cost of formwork
Rupees Three Thousand Nine
and reinforcement for reinforced concrete work in (A)
12 0.68 3930.92 Hundred Thirty and Ninety Two Cum.
Foundations, footings, Base of columns and Mass
Providing TMT Bar FE 500D reinforcement for R.C.C.
Rupees Seventy Six and Twenty
13 163.20 work including bending, binding and placing in position 76.21 Kg.
complete upto floor two level
S.S. Railing pipe 50 mm x 16 G ASIS 304 Grade
Rupees One Thousand Fourteen
and Twenty Eight Paise Only
S.S. Rialing Sq pipe 32x32 mm x 16G ASIS 304 Grade
Rupees Four Hundred Fifty Eight
and Seventy Eight Paise Only
A modern circular pergola designed with a tree-inspired
framework, providing shaded seating and enhancing
Rupees Six Hundred Thirty Six
16 1.00 outdoor spaces. Ideal for parks, plazas, gardens, and 636300.00 Nos
Thousand Three Hundred Only
public landscapes with a combination of aesthetics and
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting the cost of
material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Thangadh Municipality
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
2) Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions,
3) In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work
5) Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9) The contractor is solely responsible to bare all applicable taxes. GST etc. and department will not entertain any contractor representation to
Signature of contractor Chief Officer
Thangadh Municipality
THANGADH MUNICIPALITY
Constructing Fountain at Aazad Chowk In Thangadh Nagaralika, Dist.- Surendranagar.
SCHEDULE - "B3"
Quantities Estimated Rates Total Amount
Quantities Estimated Rates Total Amount
Item Estimated according to
Item Descrption Unit
No. but may be estimated
in Figure in Words
more or less quantities.
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
Rupees One Hundred Seventeen
1 19.84 disposing off the excavated stuff upto 50 Meter lead.(A) 117.08 Cum
and Eight Paise Only
Loose or soft soil
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and Rupees One Hundred Forty Nine
disposing off the excavated stuff upto 50 Meter lead.(B) and Sixty Seven Paise Only
Dense or Hard soil
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and Rupees Two Hundred Fifty Six
disposing off the excavated stuff upto 50 Meter lead.(C) and Twelve Paise Only
Providing and laying cement concrete 1:3:6 (1-Cement
: 3- coarse sand : 6- hand broken stone aggregates 40 Rupees Three Thousand Sixty
mmnominal size) and curing complete excluding cost of Four and Fourteen Paise Only
formwork in (A) Foundation and Plinth
Providing and laying cement concrete 1:3:6 (1- Cement
Rupees Three Thousand Nine
: 3- Coarse sand : 6- crushed stone aggregates 20 mm
5 5.44 3974.36 Hundred Seventy Four and Thirty Cum
nominal size) and curing complete including cost of
formwork in (A) Wall Caps / Coping
Providing and laying controlled cement concrete M.200
and curing complete excluding the cost of formwork Rupees Five Thousand Seven
6 5.36 and reinforcement for reinforced concrete work in © 5760.03 Hundred Sixty and Three Paise Cum
Slabs,landing,shelves,Balconies Lintels, Beams, Only
Girders and Cantilever upto floor two level.
Brick work using common burnt clay building bricks
having crushing strength not less than 35 kg./Sq.Cm. in Rupees Four Thousand Fifty One
foundation and plinth in Cement Mortar 1:5. (1- Cement and Seventy Eight Paise Only
: 5 -fine sand)(B) Conventional (upto 10 ton)
Filling available excavated earth (excluding rock)
in trenches. plinth, sides of foundations etc. in Rupees One Hundred Thirty and
layers not exceeding 20 cm. in depth consolidating Thirty Nine Paise Only
each disposited layer by ramming and watering.
Filling in foundation and plinth with murrum or selected
Rupees Two Hundred Eighty Two
9 118.71 soil in layers of 20cm. thickness including watering, 282.02 Cum
and Two Paise Only
ramming and consolidating etc. complete. (upto 10 ton)
Brick work using common burnt clay building bricks
having crushing strength not less than 35 kg./Sq.Cm. Rupees Four Thousand Two
10 36.30 from plinth level to floor two level in Cement Mortar 1:6 4289.33 Hundred Eighty Nine and Thirty Cum
(1- Cement : 6 -fine sand)(B) Conventional (upto 10 Three Paise Only
Providing and laying River Wash kota stone slab 25mm
thick in risers of steps,skirting Dedo and pillars laid on
Rupees One Thousand Two
10mm thick cement mortar 1:3 (1-Cement : 3 coarse
11 74.03 1213.01 Hundred Thirteen and One Paise Sqm
sand) and jointed with gray cement slury mixed with
pigment to match the shade of slab including rubbing
and polishing etc. complete.
20mm thick sand faced cement plaster on walls upto
height 10 metres above ground level consisting of
Rupees Three Hundred Twenty
12 266.56 12mm thick backing coat of C.M. 1:3 (1-cement : 3- 326.11 Sqm
Six and Eleven Paise Only
sand) and 8mm thick finishing coat of C.M. 1:1 (1-
cement : 1-sand) etc. complete.
Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give an required
Rupees One Hundred Fourteen
13 266.56 shape even shade after thoroughly brushing the 114.53 Sqm
and Fifty Three Paise Only
surface to remove all dirt, and remains of loose
powdered materials.etc complete
Providing and fixing 0.75 m wide sand witch type
platform including supplying and fixing Black Granite
stone 18 mm thick mirror polished stone on top and
Rupees Three Thousand Six
side position and vertical strip at front over 25 mm thick
14 46.51 3650.14 Hundred Fifty and Fourteen Paise Sqm
polished kota stone platform fixing in top and sides and
itermediate supports sand witched fixing with cement
mortar and adhesive and finishing (as directed by
engineer incharge) at required position etc complete.
Rupees Four Hundred Seventy
15 1.00 Double ring fountain work 479542.00 Nine Thousand Five Hundred Nos
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting the cost of
material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Thangadh Municipality
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions,
site moisture weather etc.
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in
consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment
shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work
and amount involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by
5) the CHIEF OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As
per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
7) Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments
and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. GST etc. and department will not entertain any contractor representation to
reimburse any financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor Chief Officer
Thangadh Municipality
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. Mile Stone Dates Beautification Work.pdf
02. SBD Book Beautification Work.pdf
04. Qualification criteria Beautification Work.pdf
05. Material_Testing_Schedule.pdf
06. SPECIFICATIONS BUILDING WORK.pdf
07. Affidevit Format.pdf
08. Declarations city.pdf
09. GR All.pdf
10. DMO_2941_01-Apr-2026_744.pdf
03. Schedule - B Beautification Work.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .