Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
16 Aug 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Rameshwar
Power Grid Corporation of India Limited Rajasthan Projects, 4th Floor, REIL House, Shipra Path, Mansarovar, Jaipur-302020
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
NR1/T/S-SRVY/DOM/I00/24/10723
Open
Civil - All
Fixed-rate
POWERGRID NR-I
₹5,000
₹2.2 L
8 Aug 2024
8 Aug 2024
19 Aug 2024
8 Aug 2024
16 Aug 2024
8 Aug 2024
Line length
i.) Hilly Terrain
ii.) Mountaineous Terrain
GPS cordinates
Route marked on google earth/ bhuvan map
Detail of wind zone (lengthwise)
States
No. of Transposition towers
Length of RC section
No of Circuits
No. of bundle Conductor
Crossing span (Bank-Bank)
Earthing
Power Line Crossings (132kV & above)
Forest Details:
Other Area
Power Line Crossings
Survey
Soil Investigation
Other Imporatnt details
Annex-A (2/2)
Name of line : LILO (both circuit) 765kV Ajmer-Bikaner D/C line at Bhadla-2
Tower Type
A/DA/QA Type tower
Normal Tower
+3M Extn
+6M Extn
+9M Extn
+18M Extn
+25M Extn
B/DB/QB Type tower
Normal Tower
+3M Extn
+6M Extn
+9M Extn
+18M Extn
+25M Extn
C/DC/QC Type tower
Normal Tower
+3M Extn
+6M Extn
+9M Extn
D/DD/QD Type tower
Normal Tower
+3M Extn
+6M Extn
+9M Extn
+18M Extn
+25M Extn
,+30 M Extn.
Gantry
Tower Type
Normal Tower
+3M Extn
+6M Extn
+9M Extn
+18M Extn
+25M Extn
Normal Tower
+3M Extn
+6M Extn
+9M Extn
Normal Tower
+3M Extn
+6M Extn
+9M Extn
Normal Tower
+3M Extn
+6M Extn
+9M Extn
+18M Extn
+25M Extn
Gantry
Total suspension Towers
Total Tower Type 'D/DD/QD'
Total Tension Towers
total Normal Towers
Total Anchor Towers
Total RC Towers
Total Towers
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
Preliminary survey/ Route alignment walkover survey work using modern survey techniques
Total amount Including GST
Name of Package :
Package No :
Specification No. :
Completion Period
: Attachments:
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
Specification No.: NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Fill up only green shaded cells in the relevent attachments.
Attachments 3(JV), 4, 4(A), 4(B), 5, 5(A), 5(B), 6, 7, 9, 10, 11, 12, 13,14, 14-IP, 15, 16, 17, 19, 20, 25 and Bid Form for 1st Envelope are included here.
Attachment 1 Bid Security : To be submitted as per ITB Clause No. 13.
Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
Attachment-3 (QR Schedule) : Format attached in Volume-III of Bidding Documents.
Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
Attachment 18 Safety Pact : To be submitted as per ITB Clause No. 9.3(s) and as per remarks in the safety pact.
Attachment-21 to 27: To be submitted as perproforma provided in the bidding document.
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
JV (Joint Venture)
JOINT VENTURE (JV)
Name of Sole Bidder
Address of Sole Bidder
Full name of Bid Signatory
Designation of Bid Signatory
E-mail ID of Bid Signatory
Mobile No. of Bid Signatory
Name of other Partner - 2 (More, if any)
Address of other Partner - 2 (More, if any)
Any Tower Parts Manufacturer proposed other than the bidder [Yes / No]
Proposed Tower Parts Manufacturer other than the bidder, if any [Maximum two nos.]
Printed Name
Designation
Place :
NOTE: (In case of JV, all partners of the Joint Venture shall be MSEs to consdier its bid as bid from MSE, JV bidder with at least one non-MSE partner (whether lead or other partner) shall not be eligible for the benefit available to the MSE bidders)
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
This Attachment is Not Applicable
Name(s) and Addresse(s) of other partner(s)
Address :
Dear Sir,
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Qualifying Requirement Data)
Bidder’s Name and Address :
Contract Services
Address:
Gurgaon (Haryana) - 122001
Dear Sir,
Attachment-3 (QR) is attached with this Volume.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country.
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country.
Place :
country.
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Subcontractors Proposed by the Bidder)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
1.We hereby furnish the details of the items/ sub-assemblies (supply items), we propose to buy for the purpose of furnishing and installation of the subject Package :
2. We hereby delare that we would not subcontract the erection portion of the contract without prior approval of the Employer.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder’s Name and Address :
Contract Services
Address :
Dear Sir,
1. We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package :
Name & Address
2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
Place :
NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Declaration to source material/equipment and services from within Arunachal Pradesh)
Bidder’s Name and Address :
Contract Services
Address :
Dear Sir,
In line with ITB Clause 9.3 (e), we intend to supply following items which are to be manufactured within Arunachal Pradesh. We further declare that we would source material / services for atleast 30% of the Installation Price of Second /Services contract from within Arunachal Pradesh.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Except for the above deviations and variations, the entire work shall be performed as per your specifications and documents. Further, we agree that any deviations, conditionality or reservation introduced in this Attachment-6 and/or in the Bid form, Price schedules & Technical Data Sheets and covering letter, or in any other part of the bid will be reviewed to conduct a determination of the substantial responsiveness of the bid.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
(Alternative, Deviations and Exceptions to the Provisions)
Extra Sheet
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Details of Alternative Bid)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
No Alternative Bid
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Work Completion Schedule)
Bidder’s Name and Address :
Address :
Dear Sir,
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1 for the period commencing from the effective date of Contract to us :
Detailed Engineering and drawing submission
a) commencement
b) completion
Procurement of equipment/ components & assembly
a) commencement
b) completion
Type Tests
a) commencement
b) completion
Manufacturing
a) commencement
b) completion
Shipments & Delivery
a) commencement
b) completion
Establishment of site office
Installation at Site
a) commencement
b) completion
Testing & Pre-commissioning
a) commencement
b) completion
Trial Operation
a) commencement
b) completion
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Guarantee Declaration)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We conform that the equipments offered shall have minimum (or a muximum, as the case may be) performance specified in Technical Specification. We further guarantee the performance/efficiency of the equipments in response to the Technical Specifications.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly,We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Place :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s)
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s)
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Price Adjustment Data)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
PRICES REMAIN FIRM & FIXED FOR ENTIRE DURATION OF CONTRACT
Dear Sir,
We hereby furnish the relevant details pertaining to the price adjustment provisions for equipment as specified in your specifications and documents for the Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1The necessary documentary evidence are enclosed :
Coefficient ‘a’ shall be between 0.51 to 0.57 and coefficient ‘b’ shall be between 0.08 to 0.10 and coefficient ‘l’ shall be between 0.20 to 0.24 and sum of Coefficients ‘a’, ‘b’ and ‘l’ shall be 0.85
EC grade aluminium ingots, co-eifciant a =
Labour, Co-efficient l=
Coefficient ‘a’ shall be between 0.69 to 0.71 and coefficient ‘l’ shall be between 0.09 to 0.11 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
Coefficient ‘a’ shall be between 0.35 to 0.45 and coefficient ‘b’ shall be between 0.04 to 0.06 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’, ‘b’, ‘c’ and ‘l’ shall be 0.80
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
Coefficient ‘b’ shall be between 0.06 to 0.08 and coefficient ‘c’ shall be between 0.55 to 0.61 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients 'b' , 'c' and ‘l’ shall be 0.80
Coefficient ‘a’ shall be between 0.35 to 0.45 and coefficient ‘b’ shall be between 0.04 to 0.06 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ , 'b' , 'c' and ‘l’ shall be 0.80
Coefficient ‘b’ shall be between 0.06 to 0.08 and coefficient ‘c’ shall be between 0.55 to 0.61 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients 'b' , 'c' and ‘l’ shall be 0.80
Coefficient ‘b’ shall be between 0.06 to 0.08 and coefficient ‘c’ shall be between 0.55 to 0.61 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients 'b' , 'c' and ‘l’ shall be 0.80
Coefficient ‘b’ shall be between 0.06 to 0.08 and coefficient ‘c’ shall be between 0.55 to 0.61 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients 'b' , 'c' and ‘l’ shall be 0.80
High Tensile Galvanised Steel wires , co-efficient b =
IEEMA
High Grade Electrolytic Zinc , co-efficient c =
Flexible Al Bond
Installation Price Component [including Civil Works but excluding Survey, Soil investigation and aviation signal for river crossing towers (if any)]
Coefficient ‘a’ shall be between 0.20 to 0.24 and coefficient ‘l’ shall be between 0.56 to 0.60 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
Supply & Placement of Reinforcement Steel
Coefficient ‘a’ shall be between 0.09 to 0.11 and coefficient ‘b’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.04 to 0.06 and sum of Coefficients ‘a’, ’b’ and ‘l’ shall be 0.80
For Concreting
Coefficient ‘a’ shall be between 0.18 to 0.22 and coefficient ‘b’ shall be between 0.25 to 0.35 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.09 to 0.11 and sum of Coefficients ‘a’, ’b’, 'c' and ‘l’ shall be 0.80
Coefficient ‘a’ shall be between 0.35 to 0.45 and coefficient ‘b’ shall be between 0.04 to 0.06 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’, ‘b’, ‘c’ and ‘l’ shall be 0.80
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
Installation Price Component {including civil works but excluding ‘supply & placement of reinforcement steel’, ‘concreting’, survey, soil investigation and aviation signal for river crossing towers(if any)}
Coefficient ‘a’ shall be between 0.20 to 0.24 and coefficient ‘l’ shall be between 0.56 to 0.60 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
Supply & Placement of Reinforcement Steel
Coefficient ‘a’ shall be between 0.09 to 0.11 and coefficient ‘b’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.04 to 0.06 and sum of Coefficients ‘a’, ’b’ and ‘l’ shall be 0.80
For Concreting
Coefficient ‘a’ shall be between 0.18 to 0.22 and coefficient ‘b’ shall be between 0.25 to 0.35 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.09 to 0.11 and sum of Coefficients ‘a’, ’b’, 'c' and ‘l’ shall be 0.80
The Bidders are required to estimate and indicate the values of different coefficients for each of the items in the price variation formulae within the specified range such that their summation is as specified in the Bidding Documents. Where no value or ‘-’ or ‘shall be furnished later’ is specified against the coefficient, the same will be deemed to be zero and the fixed component would be suitably adjusted. If the values of all coefficients in price variation formulae indicated by the Bidder are within the specified range but their sum exceeds the summation specified in the Bidding Documents, the values of the coefficients shall be pro-rata adjusted such that the summation remains as per the provisions of the Bidding Documents. If the values of all coefficients indicated by the Bidder are within the specified range but their summation is less than the value specified in the Bidding Documents, the values of the coefficients as indicated by the Bidder shall be considered as such and the fixed component in the price variation formulae would be suitably adjusted. Further, if any of values of the coefficients indicated by the Bidder is out of the range specified in the Bidding Documents, the lower of the values, as indicated by the Bidder vis-à-vis lower value of the range for that coefficient specified in the Bidding Documents, shall be considered and the fixed component would be suitably adjusted.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Declaration regarding Social Accountability)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
Integrity Pact
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
Integrity Pact is annexed separately herewith this Volume.
Place :
Instruction for printing & submitting Integrity Pact
INTEGRITY PACT
Between
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as
"POWERGRID",
having its Registered Office at
hereinafter referred to as
"The Bidder/Contractor"
Preamble
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Signature)
(For & On behalf of POWERGRID)
Integrity Pact
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1 Package and Specification Number NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
POWERGRID values full compliance with all relevant laws of the land, rules, regulations, economic use of resources, and of fairness / transparency in its relations with its Bidders/ Contractors."
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
Section II - Commitments of the Bidder/Contractor
(Signature)
(For & On behalf of POWERGRID)
Integrity Pact
(Signature)
(For & On behalf of POWERGRID)
Integrity Pact
Section III- Disqualification from tender process and exclusion from future contracts
Section IV - Liability for violation of Integrity Pact
Section V- Previous Transgression
(Signature)
(For & On behalf of POWERGRID)
Integrity Pact
Section VI - Equal treatment to all Bidders / Contractors
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or its subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(Signature)
(For & On behalf of POWERGRID)
Integrity Pact
(Signature)
(For & On behalf of POWERGRID)
Integrity Pact
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(Signature)
(For & On behalf of POWERGRID)
Integrity Pact
Signature
(For & On behalf of POWERGRID)
(Office Seal)
Designation :
Witness 1 :
Designation :
Witness 1 :
Designation :
Integrity Pact
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Option for Interest Bearing Advance(s) (Initial Advance and/or Engineering Advance) and Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises)
Bidder’s Name and Address :
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
Interest Bearing Advance(s)
(a) Supply Portion:
(b) Services Portion:
Registered Office:
Branch Office:
Correspondence Address:
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
Name of the States/UT
Name of the States/UT
Designation
Landline(s):
Mobile(s):
Email ID :
Name of the Bank:
Address of Branch:
Account No.:
Type of Account:
Type of Account:
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
Remarks:
*The definition of MSEs owned by SC/ST is as given under:
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Additional Information)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Bidder (Sole Bidder)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
The Bidder should accordingly also provide the following information/documents
Name of Banker
Address of Banker
Telephone No.
Contact Name and Title
Fax No.
E-mail ID
Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Integrity Pact that occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country.
Details regarding previous transgressions of Integrity Pact that occurred in the last 10 years
OTHER INFORMATION
Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract
Financial Data:
Figures Rs in
Details
Total Assets
Current Assets
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No.
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s)
Contract Services
Address :
Dear Sir,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s)
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Safety Pact)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
Safety Pact is annexed separately herewith this Volume.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Declaration)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We confirm that Bid Form and Price Schedules in the Second Envelope have been filled up by us as per the provisions of the Instruction to Bidders. Further, we have noted that the same shall be evaluated as per the provisions of the Bidding Documents.
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
(i) there are no discrepancies/inconsistencies and deviations/omissions/ reservations to the Bidding Documents, in the Second Envelope bid; (ii) the description of items and the unit thereof in the price schedules in the Second Envelope bid are in conformity with those indicated in the price schedule of the Bidding Documents without any deviation to the specified scope of work. We also confirm that in case any discrepancies/ inconsistencies and deviations/ omissions/ reservations, as referred to in para (i) and (ii) above, is observed in the Second Envelope, the same shall be deemed as withdrawn/rectified without any financial implication, whatsoever to POWERGRID. However, in case of any arithmetical errors, the same shall be governed as per the provision of ITB Sub-Clause 27.2 read in conjunction with BDS.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Declaration of Key Managerial Person and Power of Attorney holder)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
1. We confirm that the declarations made in our bid, particularly Attachment-3 (QR) regarding eligibility/qualification data and documents submitted in our bid in support of the declarations, are true and correct to the best of our knowledge. 2. We further confirm that we have filled up Attachment-3(QR). We also confirm that in support of meeting the Technical experience requirement as per Annexure-A (BDS), we have enclosed self-certified copy of Contract/ Award Letter and certificate from the utility for which the contract has been executed. 3. We shall furnish clarification to bid, if any sought by Employer pursuant to ITB clause 21.1. We understand that if we fail to rectify/furnish the requested documents if any, within 7 working days’ notice, our bid is liable to be rejected. 4. We understand that any false declaration and/or misrepresentation of facts and/or furnishing of false/forged documents /information may lead to our debarment from participation in Employer tenders and that our Bid Security/ Contract Performance Guarantee may be forfeited besides other actions as deemed to be appropriate as per the provisions of the Bidding Document/Integrity Pact/Employer’s policy.
5. Our Balance Bid Capacity net of works under execution, calculated as per Clause ITB 23.2.1 (i.e. 3T-B), as on 1st date** of the Quarter in which First Envelope Bids are to be opened i.e. 01st
(MM/YYYY) in equivalent Indian Rupees is
Crore. The details of value used for working out the Balance Bid Capacity as above, are as follows:
A. Maximum value of Transmission & Distribution (T&D) works (including substation, transmission lines, distribution for all verticals), executed in any one financial year during the last 5 financial years taking into account the completed as well as the works in progress
B. Value of existing commitments and ongoing similar works yet to be completed as on the 1st date of quarter of the financial year in which the bids are opened(B) as on 1st date of the Quarter in which First Envelope Bids are to be opened
[**1st day of the quarter in which the first envelope bids are opened for e.g. If the actual date of opening of first envelope bids is 15th June 2016, the Balance bid capacity as on 01st April 2016 is to be declared)]
6. Notwithstanding above, we also understand that the Bid Capacity as declared hereinabove, shall be subject to assessment, if any, by the Employer, which shall be final and binding. We also confirm that the Employer may verify the supporting documents/ details in connection with above declarations. We further understand that in case of any unethical practices inter-alia including any misrepresentation of facts, submission of false and/or forged details/ documents/ declaration by us, we may be debarred from the participation in Employer’s tenders in future as considered appropriate by Employer and our Bid Security/ Contract Performance Guarantee shall be forfeited besides taking other actions as deemed appropriate.
Place :
Note: Key Managerial Personnel (KMP) of the company shall include CEO/Managing Director/ Company Secretary/ Director/ CFO/any of the partner in case of partnership firm/any other officer entrusted with substantial powers of the management of the affairs of the company/firm.
Bidders are advised to print this declaration on the Company Letter Head and upload the duly signed and scanned copy along with the First Envelope Bid.
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Rate Contract for Route alignment /Preliminary/walkover survey work using modern survey techniques for transmission lines under NR-1
(Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA)
Bidder’s Name and Address :
Contract Services
Address :
Gurgaon (Haryana) - 122001
Dear Sir,
We confirm that:
1) The undersigned is authorized representative of the Bidder.
2) We have studied the e-Reverse Auction Terms & Conditions and the Business Rules governing the e-Reverse Auction as mentioned in your letter and confirm our agreement to them.
3) We understand that ASP shall arrange to demonstrate/ train (if not trained earlier) bidders’ nominated person(s), without any cost. They will also explain all the Rules related to e-Reverse Auction/ Business Rules Document to be adopted along with bid manual. We have further noticed that we at own discretion may ask for additional training to use the e-RA platform well in advance before start of the e-RA event by contacting the ASP at any suitable time. All such additional trainings shall also be free of cost.
4) We further re-confirm that within an hour of conclusion of e-Reverse Auction, we will submit confirmation of our final offered price in e-Reverse Auction including the break-up under individual head of the template [i.e. CIF/Ex-works Price, Port handling & Custom clearance, Local Transportation, In-transit Insurance, loading and unloading, Installation Charges, Type Test Charges, Training Charges, Customs Duty, GST for supply of Goods and Installation Services etc., as applicable] Further, unless other-wise stated in the above break-up, decrease in the price of individual head of the template shall be considered proportionately on all individual line items of the respective head of the price schedules. In case, there is any variation between our final price quoted in Reverse Auction and the signed document submitted by us after Auction, the first i.e. Closing Price in Auction, shall be taken as final offered price by us. We also confirm that we will not increase unit rate of any item submitted in our original bid.
We hereby confirm that we will honor the Bids placed by us during the auction process.
Place :
Specification No. :NR1/T/S-SRVY/DOM/I00/24/10723 (Rfx: 5002003762)
Contract Services
thirteen
fourteen
Name of Contract :
Having examined the Bidding Documents, including Amendment Nos. ...[Enter the Amendment]… dated …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently).
The above amounts are in accordance with the price schedules attached herewith and are made part of this bid
We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2
Attachments to the Bid Form (First Envelope)
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments:
(a) Attachment 1() :
(b) Attachment 2() :
(c) Attachment 3() :
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV).
(d) Attachment 4() :
(e) Attachment 5() :
(f) Attachment 5A() :
(g) Attachment 6() :
(h) Attachment 7() :
(i) Attachment 8() :
(j) Attachment 9() :
(k) Attachment 10() :
(l) Attachment 11() :
(m) Attachment 12() :
(n) Attachment 13() :
(o) Attachment 14() :
(p) Attachment 15() :
(q) Attachment 16() :
(r) Attachment 17() :
(s) Attachment 18() :
(t) Attachment 19 () :
(u) Attachment 20 () :
(v) Attachment 21 () :
(w) Attachment 22 () :
(x) Attachment 23 () :
(y) Attachment 24 () :
(z) Attachment 25 () :
(aa) Attachment 26 () :
(bb) Attachment 27 () :
(cc) Attachment 28 () :
We are a Micro and Small Enterprise (MSE) registered with
a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012, Notification dated 01/06/2020 and 26/06/2020 including subsequent amendments, read in conjunction with related notifications issued from time to time for such enterprises. (applicable for MSE only)
We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
We are aware that the Price Schedules do not generally give a full description of the Work to be performed under each item and we shall be deemed to have read the Technical Specifications and other sections of the Bidding Documents and Drawings to ascertain the full scope of Work included in each item while filling-in the rates and prices in Second Envelope.
We declare that as specified in Clause 11.5, Section –II:ITB, Vol.-I of the Bidding Documents, prices quoted by us in the Price Schedules in Second Envelope shall be subject to Price Adjustment during the execution of Contract in accordance with Appendix-2 (Price Adjustment) to the Contract Agreement.
We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
100% of applicable Taxes and Duties i.e. GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
We further understand that notwithstanding 4.0 above, in case of award on us, you shall also bear and pay/reimburse to us, GST in respect of supplies by us to you, imposed on the Plant & Equipment including Mandatory Spare Parts to be incorporated into the Facilities including Type Test charges for Type test to be conducted specified in Schedule No. 1, Installation Services specified in Schedule No. 3 and Charges for Training to be imparted specified in Schedule No. 4 of the Price Schedule in Second Envelope, by the Indian Laws.
We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods
Construction of the Contract
We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, insurance, unloading, storage, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
We agree to abide by this bid for a period of six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
We understand that you are not bound to accept the lowest or any bid you may receive.
Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution, if we are awarded the contract, are listed below:-
Name and Address of Agent
(If none, state “none”)
# (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Place :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
Other Partner -1
Printed Name :
Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2() Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Three
Seven
Eight
Eleven
Twelve
Thirteen
Fourteen
Fifteen
Sixteen
Seventeen
Eighteen
Nineteen
Twenty
Twenty One
Twenty Two
Twenty Three
Twenty Four
Twenty Five
Twenty Six
Twenty Seven
Twenty Eight
Twenty Nine
Thirty
Thirty One
Thirty Two
Thirty Three
Thirty Four
Thirty Five
Thirty Six
Thirty Seven
Thirty Eight
Thirty Nine
Forty
Forty One
Forty Two
Forty Three
Forty Four
Forty Five
Forty Six
Forty Seven
Forty Eight
Forty Nine
Fifty
Fifty One
Fifty Two
Fifty Three
Fifty Four
Fifty Five
Fifty Six
Fifty Seven
Fifty Eight
Fifty Nine
Sixty
Sixty One
Sixty Two
Sixty Three
Sixty Four
Sixty Five
Sixty Six
Sixty Seven
Sixty Eight
Sixty Nine
Seventy
Seventy One
Seventy Two
Seventy Three
Seventy Four
Seventy Five
Seventy Six
Seventy Seven
Seventy Eight
Seventy Nine
Eighty
Eighty One
Eighty Two
Eighty Three
Eighty Four
Eighty Five
Eighty Six
Eighty Seven
Eighty Eight
Eighty Nine
Ninety
Ninety One
Ninety Two
Ninety Three
Ninety Four
Ninety Five
Ninety Six
Ninety Seven
Ninety Eight
Ninety Nine
One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
~WRL2028.tmp
tmp • 0.11 MB
01-Section - I IFB SSTE Vol-I.docx
docx • 0.05 MB
02-Section - II ITB SSTE S&I Rev 5-DCB-SRM.docx
docx • 0.11 MB
03-Section - III_BDS.docx
docx • 0.06 MB
04-Annexure-A (BDS).doc
doc • 0.07 MB
05A Terms & Conditions of Rate Contract.docx
docx • 0.02 MB
05-GCC-civil works(Feb 2019).doc
doc • 0.37 MB
06-01-Section - V SCC Civil Vol-I.docx
docx • 0.05 MB
07-Appendix -I to SCC.docx
docx • 0.03 MB
08_Appendix-II to SCC.pdf
pdf • 0.82 MB
08-Section - VI Forms and Proceedures.doc
doc • 0.25 MB
09-Checklist for submission of tender.docx
docx • 0.02 MB
BOQ FORMAT FOR TRANSMISSION LINE PACKAGE.xlsx
xlsx • 0.02 MB
Sample BoQ.xlsx
xlsx • 0.01 MB
Technical Specifications.docx
docx • 0.05 MB
01_Attachment-3(QR).doc
doc • 0.11 MB
02-Attachment 14-Integrity Pact.doc
doc • 0.07 MB
03_Attachment-20_KMP Declaration.doc
doc • 0.04 MB
04_Attachment-21-Affidavit of Self certification regarding Minimum Local Content.DOCX
docx • 0.02 MB
05_Attachment-24_Declaration regarding events encountered pursuant to ITB Clause 2-1.docx
docx • 0.03 MB
06_Attachment-27-Certification by the Bidder per DoE Order in line with ITB Clause 2-1.docx
docx • 0.02 MB
07_Legends for Units.pdf
pdf • 0.03 MB
First_Envelope_and_Bid_Forms.xls
xls • 2.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .