| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 CrAccepted-AOC AT GANDAPADA PO CHARMPA PS BHADRAK DIST BHADRAK STATE ODISHA PIN 756163 | BHADRAK | BHADRAK | ODISHA | 756163 | ₹29.7 Cr Quoted ₹29.9 Cr | L1 | Accepted-AOC OK |
| 2 | L2₹30.1 Cr+₹20.9 L (0.70%)Rejected-Finance | ₹30.1 Cr+₹20.9 L (0.70%) | L2 | Rejected-Finance Due to selection of L1 Bidder |
Tender Value
₹27.9 Cr
EMD Value
₹28 L
Closing Date
10 Mar 2026, 5:00 pmClosed
DIRECTOR, PORTS AND IWT, ODISHA, BHUBANESWAR
DIRECTORATE OF PORTS AND INLAND WATER TRANSPORT, GROUND FLOOR, ZONE-A, FORTUNE TOWERS, CHANDRASEKHARPUR, BHUBANESWAR-751023
CIVIL CONSTRUCTION WORKS
2026_PIWT_126285_1
DPIWT-32/2025-26
Open Tender
Civil Works - Others
Percentage
Janhikuda under Krushnaprasad Block of Puri Distri
PLEASE REFER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹10,000
₹28 L
Yes
DIRECTORATE OF PORTS AND INLAND WATER TRANSPORT, G
22 Jun 2026
19 Feb 2026
11 Mar 2026
19 Feb 2026
10 Mar 2026
19 Feb 2026
19 Feb 2026 - 25 Feb 2026
26 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the Engineer-in-Charge. | - | - | - | - |
| 2 | MAIN+FINGER+APPROACH JETTY | 346 | No. | 50,353.4 | ₹1,74,22,276.4 |
| 3 | Boring 600 mm dia piles to the required depth through all types of soil strata including hard rock if any up to the founding level and stacking the bored soil at convenient place and transport to dispose the same at low lying area outside the working area with cleaning & washing the bore including cost of bentonite solution, labour, labour cess, tools, equipments, required to complete in all respect as per direction of the Engineer’-in-charge.
Note:-
01. If the boring tool encounters rock at an elevation higher than the termination level of the pile indicated in the drawing then the boring shall be continued one metre into the rock from where the boring tool encounters rock first.
02. In case the soil stratum at the founding level is loose the Engineer or his representative may direct the contractor to carryout additional length of boring and payment for such additional work shall also be made under this item.
03. The sample of bored materials at regular interval shall be collect and produce for the verification of the Engineer or his representative at no extra cost. In the event of any dispute about the type of strata bored, the samples so collected shall be referred to an authorised laboratory / agency indentified by the Engineer and the decision of such authorised laboratory / agency is final and binding on both the parties. However the cost of such testing shall be borne by the contractor. | - | - | - | - |
| 4 | MAIN+FINGER+APPROACH JETTY | 5,316 | Mtr. | 4,500 | ₹2,39,22,000 |
| 5 | Providing and fabricating M.S.liners confirming to IS specifications of SAIL of specified thickness for required length with M.S. shoes of 1.0m height using 6mm thick M.S. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification as directed by Engineer-In-charge. | - | - | - | - |
| 6 | MAIN+FINGER+APPROACH JETTY | 492.27 | MT | 97,320 | ₹4,79,07,716.4 |
| 7 | Dismantling of Reinforced Concrete Pile head complete as per drawing and Technical Specification | - | - | - | - |
| 8 | MAIN+FINGER+APPROACH JETTY | 97.78 | Cum | 1,688.43 | ₹1,65,094.69 |
| 9 | Providing and laying reinforced cement concrete in concrete mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer- In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge. | - | - | - | - |
| 10 | MAIN+FINGER+APPROACH JETTY | 1,502.31 | Cum | 8,353.3 | ₹1,25,49,246.12 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
DTCN.pdf
Tender Documents • 6.33 MB
BOQ_581950.xls
BOQ • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .