Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | ₹9.7 L | L1 | Accepted-AOC Agreement Executed |
| 2 | L2₹12.0 LRejected-AOC | ₹12.0 L | L2 | Rejected-AOC Agreement Executed |
| Sl No | Description | Qty | Unit | NIYAS K L1 | VINAYA KRISHNAN L2 |
|---|---|---|---|---|---|
| 1.00Investigation | |||||
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 10.8 | Hectare | 5,000 ₹54,000 | 5,000 ₹54,000 |
| 1.00 | OD63928/2025-2026:Conducting sub soil investigation tests at suitable intervals including taking samples, Temperature measurement, Soaked CBR value etc and submitting the compiled reports etc. complete as per the IRC guide lines and direction of the departmental officers. | 10 | per test | 10,000 ₹1 L | 16,000 ₹1.6 L |
| 1.00 | OD63931/2025-2026:Preparing alignment for the proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC). Also satisfying the Engineering aesthetic and economic requirement designing of horizontal curves (wherever feasible) including spiral tansitions and vertical curves after finalizing the alignment and also preparing the LS and CS at an interval of 50m C/C. | 3.6 | km | 10,000 ₹36,000 | 30,000 ₹1.1 L |
| 1.00 | OD63929/2025-2026:Preparation of Detailed Project Report containing alignment plan,Design particulars recommendation for easing for horizontal& Vertical curve as per MoRTH Specification work based on schedule,Cost benefit ratio,work management,Traffic management,inventory of culverts, Recommendation of retaining wall,Drain ,Proposed for bus bay etc complete. 5 set of DPR etc. as per the directions of the departmental officers. | 1 | set | 30,000 ₹30,000 | 1,50,000 ₹1.5 L |
| 1.00 | 8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting . | 300 | no | 1,300 ₹3.9 L | 1,600 ₹4.8 L |
| 1.01 | OD90708/2025-2026:Imposing the alignment to Field Measurement Book and preparing LA strip plan with the list of survey numbers and extends of each plot to be acquired as per the direction of the engineer in charge including all cost of transportation , labour, preparing drawings with sufficient copies, collecting data etc. complete. 5 sets of drawings and data shall be submitted along with the softcopy of drawing in CAD and pdf formats. | 3.6 | km | 40,000 ₹1.4 L | 25,000 ₹90,000 |
| 2.00Total station | |||||
| 2.00 | 56.12.c:Total station surveying and preparation of site plan - In hilly terrain | 10.8 | Hectare | 20,000 ₹2.2 L | 15,000 ₹1.6 L |
Tender Value
₹12.8 L
EMD Value
₹32,043
Closing Date
8 Oct 2025, 11:00 amClosed
Executive Engineer
Executive Engineer
GENERAL-Investigation work 2025-26- Investigation Works to Kallanode Illipilai Manicheri Vayalada Thalayad Road in Balussery LAC-General Civil Work
2025_PWD_804067_1
DB2/TN/40/2025-26
Open Tender
Civil Works - Roads
180 days
BALUSSERY
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹32,043
Yes
5 Mar 2026
29 Sept 2025
10 Oct 2025
29 Sept 2025
8 Oct 2025
29 Sept 2025
Amount
Investigation
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD63928/2025-2026:Conducting sub soil investigation tests at suitable intervals including taking samples, Temperature measurement, Soaked CBR value etc and submitting the compiled reports etc. complete as per the IRC guide lines and direction of the departmental officers.
OD63931/2025-2026:Preparing alignment for the proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC). Also satisfying the Engineering aesthetic and economic requirement designing of horizontal curves (wherever feasible) including spiral tansitions and vertical curves after finalizing the alignment and also preparing the LS and CS at an interval of 50m C/C.
OD63929/2025-2026:Preparation of Detailed Project Report containing alignment plan,Design particulars recommendation for easing for horizontal& Vertical curve as per MoRTH Specification work based on schedule,Cost benefit ratio,work management,Traffic management,inventory of culverts, Recommendation of retaining wall,Drain ,Proposed for bus bay etc complete. 5 set of DPR etc. as per the directions of the departmental officers.
8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting .
OD90708/2025-2026:Imposing the alignment to Field Measurement Book and preparing LA strip plan with the list of survey numbers and extends of each plot to be acquired as per the direction of the engineer in charge including all cost of transportation , labour, preparing drawings with sufficient copies, collecting data etc. complete. 5 sets of drawings and data shall be submitted along with the softcopy of drawing in CAD and pdf formats.
Total station
56.12.c:Total station surveying and preparation of site plan - In hilly terrain
VINAYA KRISHNAN (BID ID -2378511)
Bidder Name
VINAYA KRISHNAN
NIYAS K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1337063.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid