7 Apr 2026, 4:00 pmClosed
DEPUTY EXECUTIVE ENGINEER, M.S. ELECTRICAL SUB DN, AHMEDABD
All in Maintenance contract of Split Type A.C Machine installed at Non-Residential Buildings of RTO Section under M.S.Electrical Sub Division, Ahmedabad (for one year).
292099
17/01 OF 2025/2026
Open
Electrical and Maintenance Works
Works
Ahmedabad
9 documents required · 9 mandatory
₹600
Deputy Executive Engineer, M.S.Electrical Sub Division, Ahmedabad
₹2,400
31 Mar 2026
31 Mar 2026
31 Mar 2026
7 Apr 2026
31 Mar 2026
All in Maintenance contract of Split Type A.C Machine installed at Non-
Residential Buildings of RTO Section under M.S.Electrical Sub Division,
Ahmedabad (for one year).
Sr. No. Qnty. Item Description Figures Per Amount
NIL NIL NIL NIL NIL NIL NIL
Dy. Executive Engineer
Signature of Contractor M.S. Elect. Sub- Division
R & B Deptt., Ahmedabad.
Name of Work:- All in Maintenance contract of Split Type A.C Machine installed at Non-
Residential Buildings of RTO Section under M.S.Electrical Sub Division, Ahmedabad (for
Sr. No. Item Qty. Per. Rate in Words Net Rate Amount
(1) The All inclusive comprehensive maintenance
cost covers the yearly maintenance cost of the
electrical machineries with material & Labour cost
including preventive maintenance. The cost covers
entire installation from outlet of main switch to
electrical machine..
(3) All inclusive comprehensive maintenance cost
of Window type / Split type Air conditioners &
Water coolers covers the yearly maintenance &
preventive maintenance with all required painting
materials & labours. including sheet metal work,
refrigerant gas , compressor & all the contains
parts. The cost covers entire installation from outlet
of main switch to the Unit.
All inclusive comprehensive maintenance cost for
1 the period of one year for the Split type Air-
conditioning Unit of following Capacity
(A) 1.0 ton capacity
(1) Charges for breakdown Maintenance as per Rupees One Thousand Two
requirement throughout the year 2 Ea. Hundred Six And Paise 1206.95
Ninety Five Only
(2) Charges for 1st Routine Maintenance of Dry
Services between date of commencement to 3rd Rupees One Hundred Forty
Months from date of issue of work order. 2 Ea. 141.40
One And Paise Forty Only
(3) Charges for 2nd Routine Maintenance of wet
Services with water or Chemical as per site Rupees Two Hundred Sixty
requirement Services between 3rd months to 6th 2 Ea. One And Paise Fifty Nine 261.59
Months from date of issue of work order. Only
(4) Charges for 3rd Routine Maintenance of Dry
Services between 6th months to 9th Months from Rupees One Hundred Forty
One And Paise Forty Only
date of issue of work order.
(5) Charges for 4th Routine Maintenance of wet
Services with water or Chemical as per site Rupees Two Hundred Sixty
requirement Services between 9th months to 12th 2 Ea. One And Paise Fifty Nine 261.59
Months from date of issue of work order. Only
(B) 1.5 ton capacity
(1) Charges for breakdown Maintenance as per Rupees One Thousand Two
requirement throughout the year 26 Ea. Hundred Thirty Three And 1233.21
Paise Twenty One Only
(2) Charges for 1st Routine Maintenance of Dry
Services between date of commencement to 3rd Rupees One Hundred Forty
Months from date of issue of work order. 26 Ea. Four And Paise Forty Three 144.43
(3) Charges for 2nd Routine Maintenance of wet
Services with water or Chemical as per site Rupees Two Hundred Sixty
requirement Services between 3rd months to 6th 26 Ea. Seven And Paise Sixty Five 267.65
Months from date of issue of work order. Only
(4) Charges for 3rd Routine Maintenance of Dry Rupees One Hundred Forty
Services between 6th months to 9th Months from 26 Ea. Four And Paise Forty Three 144.43
date of issue of work order. Only
(5) Charges for 4th Routine Maintenance of wet
Services with water or Chemical as per site Rupees Two Hundred Sixty
requirement Services between 9th months to 12th 26 Ea. Seven And Paise Sixty Five 267.65
Months from date of issue of work order. Only
(C) 2.0 ton capacity
(1) Charges for breakdown Maintenance as per Rupees One Thousand Four
requirement throughout the year 20 Ea. Hundred Sixty Four And 1464.50
Paise Fifty Only
(2) Charges for 1st Routine Maintenance of Dry
Services between date of commencement to 3rd Rupees One Hundred
Months from date of issue of work order. 20 Ea. Seventy One And Paise 171.70
(3) Charges for 2nd Routine Maintenance of wet
Services with water or Chemical as per site Rupees Three Hundred
requirement Services between 3rd months to 6th 20 Ea. Seventeen And Paise 317.14
Months from date of issue of work order. Fourteen Only
(4) Charges for 3rd Routine Maintenance of Dry Rupees One Hundred
Services between 6th months to 9th Months from 20 Ea. Seventy One And Paise 171.70
date of issue of work order. Seventy Only
(5) Charges for 4th Routine Maintenance of wet
Services with water or Chemical as per site Rupees Three Hundred
requirement Services between 9th months to 12th 20 Ea. Seventeen And Paise 317.14
Months from date of issue of work order. Fourteen Only
All inclusive comprehensive maintenance cost for
the period of one year for the Inverter Based Split
type Air-conditioning Unit of following Capacity
(B) 1.5 ton capacity.
(A) Charges for breakdown Maintenance as per Rupees Two Thousand Two
requirement throughout the year 7 Ea. Hundred Eighty Two And 2282.60
Paise Sixty Only
(B) Charges for 1st Routine Maintenance of Dry
Services between date of commencement to 3rd Rupees Two Hundred Sixty
Months from date of issue of work order. 7 Ea. Seven And Paise Sixty Five 267.65
(C) Charges for 2nd Routine Maintenance of wet
Services with water or Chemical as per site
requirement Services between 3rd months to 6th Rupees Four Hundred Ninety
Months from date of issue of work order. Four And Paise Ninety Only
(D) Charges for 3rd Routine Maintenance of Dry Rupees Two Hundred Sixty
Services between 6th months to 9th Months from 7 Ea. Seven And Paise Sixty Five 267.65
date of issue of work order. Only
(E) Charges for 4th Routine Maintenance of wet
Services with water or Chemical as per site
requirement Services between 9th months to 12th Rupees Four Hundred Ninety
Months from date of issue of work order. Four And Paise Ninety Only
All inclusive comprehensive maintenance cost for
the period of one year for the Inverter Based Split
type Air-conditioning Unit of following Capacity
(C) 1.7 to 2.0 ton capacity.
(A) Charges for breakdown Maintenance as per Rupees Two Thousand Eight
requirement throughout the year 16 Ea. Hundred Twenty Nine And 2829.01
(B) Charges for 1st Routine Maintenance of Dry
Services between date of commencement to 3rd Rupees Three Hundred
Months from date of issue of work order. 16 Ea. Thirty And Paise Twenty 330.27
(C) Charges for 2nd Routine Maintenance of wet
Services with water or Chemical as per site
requirement Services between 3rd months to 6th Rupees Six Hundred Twelve
Months from date of issue of work order. And Paise Six Only
(D) Charges for 3rd Routine Maintenance of Dry Rupees Three Hundred
Services between 6th months to 9th Months from 16 Ea. Thirty And Paise Twenty 330.27
date of issue of work order. Seven Only
(E) Charges for 4th Routine Maintenance of wet
Services with water or Chemical as per site
requirement Services between 9th months to 12th Rupees Six Hundred Twelve
Months from date of issue of work order. And Paise Six Only
Shifting of Split A.C. The Scope includes dismantling,
shifting, re-installing & re-commissioning of the units
including topping up of Refrigerant gas, minor civil Rupees One Thousand Nine
2 work wiring existing piping M S Stand electrical 5 Ea. Hundred Sixty Nine And 1969.50
cabling with PVC drown piping for 1.00, 1.5 & 2.0 TR Paise Fifty Only
Supplying and erecting insulated pair of soft
copper tubing open or concealed including power
and control cable,necessary PVC drain pipes for Rupees Nine Hundred Sixty
Split AC machine up to 4 TR capacity Five And Paise Fifty Six Only
Rupees Two Lakh(s) Thirty Two Thousand Seven Hundred Sixty Four And Paise Sixty Only
Dy. Executive Engineer
Signature of Contractor M.S. Elect. Sub- Division
R & B Deptt., Ahmedabad.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
G S T LTR.pdf
GR.pdf
PQ CRITERIA.pdf
STANDARD BIDDING DOCUMENTS.pdf
ઓનલાઈન જાહેર નિવિદા નં ૧૭.pdf
SCHEDULE A AND B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .