Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAccepted-AOC | ₹28.6 L | L1 | Accepted-AOC AGMNT EXECUTED |
| 2 | L2₹28.7 L+₹12,367.37 (0.43%)Rejected-Finance KONHAVI MEETHAL H CHERUKARA PANTHEERANKAVE PO KAKKODI | KOZHIKODE | KERALA | 612906 | ₹28.7 L+₹12,367.37 (0.43%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L9 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L6 |
| Sl No | Description | Qty | Unit | Ratheesh kumar L1 | GREEN SHADE L5 | SAAD BIN BASHEER L3 | RAJAN P L7 | NOUSHAD Builders L4 | THASNEEM CONSTRUCTS L10 | SUBRAMANIAN K L8 | K V MANOJ KUMAR L6 | ANILKUMAR K M L2 | IRAVATHAM ASSOCIATE LLP L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Building construction | |||||||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 62.16 | cum | 300 ₹18,648.9 | 296.5 ₹18,431.33 | 330 ₹20,513.79 | 300 ₹18,648.9 | 295.06 ₹18,341.81 | 301.83 ₹18,762.66 | 287.47 ₹17,870 Lowest | 300 ₹18,648.9 | 304.8 ₹18,947.28 | 300 ₹18,648.9 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 8.52 | cum | 6,800 ₹57,908.8 | 6,537.9 ₹55,676.76 | 6,560 ₹55,864.96 | 7,000 ₹59,612 | 6,506.85 ₹55,412.33 | 6,656.23 ₹56,684.45 | 6,339.26 ₹53,985.14 Lowest | 6,800 ₹57,908.8 | 6,721.81 ₹57,242.93 | 6,700 ₹57,057.2 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 46.8 | sqm | 250 ₹11,700 Lowest | 318.2 ₹14,891.76 | 300 ₹14,040 | 400 ₹18,720 | 316.74 ₹14,823.43 | 324.01 ₹15,163.67 | 308.58 ₹14,441.54 | 300 ₹14,040 | 327.2 ₹15,312.96 | 325 ₹15,210 |
| 1.00 | OD228330/2025-2026:Dry rubble masonry including all cost ,conveyance of all materials and all labour charges etc complete.( PWD approved data ) | 35.52 | cum | 3,400 ₹1,20,778.2 | 3,291.2 ₹1,16,913.3 | 3,300 ₹1,17,225.9 | 3,700 ₹1,31,435.1 | 3,275.59 ₹1,16,358.78 | 3,350.78 ₹1,19,029.76 | 3,219 ₹1,14,348.54 Lowest | 3,400 ₹1,20,778.2 | 3,383.79 ₹1,20,202.37 | 3,350 ₹1,19,002.05 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 21.44 | cum | 9,000 ₹1,92,978 | 8,644.3 ₹1,85,351.08 | 9,000 ₹1,92,978 | 10,000 ₹2,14,420 | 8,603.28 ₹1,84,471.53 | 8,800.78 ₹1,88,706.32 | 8,382 ₹1,79,726.84 Lowest | 8,900 ₹1,90,833.8 | 8,887.48 ₹1,90,565.35 | 8,850 ₹1,89,761.7 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 116.72 | sqm | 550 ₹64,196 Lowest | 628.7 ₹73,381.86 | 650 ₹75,868 | 750 ₹87,540 | 625.74 ₹73,036.37 | 640.11 ₹74,713.64 | 609 ₹71,082.48 | 600 ₹70,032 | 646.41 ₹75,448.98 | 650 ₹75,868 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 13.14 | cum | 11,000 ₹1,44,573 | 11,078.3 ₹1,45,602.1 | 11,100 ₹1,45,887.3 | 12,000 ₹1,57,716 | 10,494.83 ₹1,37,933.55 Lowest | 11,278.86 ₹1,48,238.06 | 10,742 ₹1,41,182.11 | 11,300 ₹1,48,515.9 | 11,389.98 ₹1,49,698.51 | 11,600 ₹1,52,458.8 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 67.2 | sqm | 650 ₹43,680 Lowest | 831.2 ₹55,856.64 | 900 ₹60,480 | 800 ₹53,760 | 827.25 ₹55,591.2 | 846.24 ₹56,867.33 | 806 ₹54,163.2 | 850 ₹57,120 | 854.58 ₹57,427.78 | 850 ₹57,120 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.76 | cum | 10,000 ₹57,600 | 10,526.2 ₹60,630.91 | 11,000 ₹63,360 | 9,600 ₹55,296 Lowest | 10,476.22 ₹60,343.03 | 10,716.72 ₹61,728.31 | 10,207 ₹58,792.32 | 10,600 ₹61,056 | 10,822.3 ₹62,336.45 | 10,800 ₹62,208 |
Tender Value
₹33.0 L
EMD Value
₹50,000
Closing Date
2 Oct 2025, 6:00 pmClosed
SUPERINTENDING ENGINEER
O/o SE, Kozhikode Corporation, [email protected]
Please refer Tender document
2025_LSGD_801049_1
PP/EG7/2025-26/SE/330
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kozhikode Corporation
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
1 Nov 2025
23 Sept 2025
4 Oct 2025
23 Sept 2025
2 Oct 2025
23 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1329731.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .