Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | -9.11% | ₹2.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹5,920
Closing Date
7 Sept 2026, 3:00 pmClosed
Xen IFC Sopore
Xen IFC Sopore
C/O one Number Ghat at Pohru Nallah at Mazbugh.
2026_IFC_322741_7
enit.10.IFCD.SPR.2026.27
Open Tender
Civil Works
Percentage
15 days
Sopore
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Xen IFC Sopore
₹5,920
17 Sept 2026
29 Aug 2026
8 Sept 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by Manual Means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 56.55 | Cum | 592.9 | ₹33,528.49 |
| 2 | Providing & Laying Dry Stone Solong Including Cost of Stones | 4.9 | Cum | 937.9 | ₹4,595.71 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 6.17 | cum | 5,202.9 | ₹32,101.89 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 26.23 | Cum | 6,591.25 | ₹1,72,888.49 |
| 5Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 5.1 | Foundations, footings, bases of columns etc. for mass concrete. | 100.14 | SQM | 286.35 | ₹28,675.09 |
| 6Carraige of materials from source to actual site of work by Mechanical transport including cost of loading, unloading and stacking etc | |||||
| 6.1 | stone soiling from lolpora a lead of 25kms | 4.9 | cum | 547.21 | ₹2,681.33 |
| 6.2 | Aggregate 40 mm from an average lead of 25 kms | 5.49 | Cum | 505.64 | ₹2,775.96 |
| 6.3 | Aggregate 20 mm for an average lead of 25 | 23.47 | Cum | 465.14 | ₹10,916.84 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1084003.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .