| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95,720Accepted-Finance 259 ANAND VIHAR COLONY NAWADA SEKHAN PILIBHIT BYPASS ROAD BAREILLY UTTAR PRADESH 243005 | BAREILLY | UTTAR PRADESH | 243005 | ₹95,720 | L1 | Accepted-Finance Found in order |
| 2 | L2₹1.1 LAccepted-Finance | ₹1.1 L | L2 | Accepted-Finance __ |
| 3 | L3₹1.5 LAccepted-Finance 879 SHAHBAD BHOOR BAREILLY BHOOR BAREILLY BAREILLY BAREILLY UTTAR PRADESH 243001 UDYAM UP 15 0003299 | BAREILLY | UTTAR PRADESH | 243001 | ₹1.5 L | L3 | Accepted-Finance __ |
Tender Value
₹1 L
EMD Value
₹1,500
Closing Date
13 Feb 2024, 12:00 pmClosed
Executive Engineer
Electy. 400KV S/S Division, Bareilly
Replacement / Repairing of Damaged Main Pipe Line of Mulsifier Pipe line system at 400KV Sub-station Bareilly
2024_UPTCL_891259_1
Very Short Term E-Tender No. 10/400KV(B)/2023-24
Open Tender
Repair and Maintenance Works
30 days
Electy. 400KV Substation
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer 400KV S/S Div.
₹1,500
16 Feb 2024
6 Feb 2024
13 Feb 2024
7 Feb 2024
13 Feb 2024
7 Feb 2024
Amount
Replacement / Repairing of Damaged Main Pipe Line Mulsifier Pipe line system at 400KV Subastation Bareilly
Excavation of soil approximate 2mtr from ground level and 2.5 wide to takeout damaged main Emulsifier main pipe line(300 NB ) .
Fine cutting of main pipe line (300 NB ) to replace the damaged main pipe line 300 NB with the help of Gas Cutting machine .
Taking out the Damaged Above Pipe line after excavation of soil above the damagede pipe line with help of Hydra etc.
Repairing /replacement of above pipe line with the help of Argon welding machine , suitable chemicals to block any possiblity of leakages etc.
Adding suitable chemicals , materials to avoid any leakges , rusting of pipe line and then painting of above pipe line with charcoal paint and the raping with charcoal sheet
Laying the repaired pipe line with the help of Hydra etc.
Jointing the above pipe line with help of argon welding etc.
Leveling the ground after checking of leakage /completion of work.
Rewinding & overhuiling of 3 phase 15 Hp 415volt,50Hz Jockey of mulsifier induction Motor CGL make With same winding wire standard make and its damaged bearing etc for proper operation
Overhauling of Jockey Pump kirloskar make and replacement of its damaged bearing and adjustment of shaft and the work also included its minor reapairing for proper operation
Niyazi Enterprises
M/S INDRA ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf