Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L1 | Accepted-AOC L1, lowest rate quoted by the bidder |
| 2 | L2₹2.5 Cr+₹619.11 (<0.01%)Rejected-Finance | ₹2.5 Cr+₹619.11 (<0.01%) | L2 | Rejected-Finance NOT L1 |
| 3 | L3₹3.2 Cr+₹68.1 L (27.5%)Rejected-Finance | ₹3.2 Cr+₹68.1 L (27.5%) | L3 | Rejected-Finance NOT L1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected - due to insufficient documents |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected - due to insufficient documents |
Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
6 Feb 2025, 6:55 pmClosed
Superintending Engineer, Prog Circle, SD Sector,
Office of the Superintending Engineer, Programme Circle, SD Sector, KMDA Unnayan Bhawan, 5th Floor, Block-A, Salt Lake City, Kolkata 700091
Construction of Brick storm water surface drain with RCC cover slab from Pal Para More to Railway khal via Panchanantala, Kazipara More, MAS School (Mallickpara Gram Panchayet) at ward no 22 under Rajpur Sonarpur Municipality.
2025_KMDA_798841_1
06/SE(Prog)/SD/KMDA OF 2024-2025
Open Tender
CIVIL WORKS
Percentage
150 days
Rajpur Sonarpur Municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6.2 L
Yes
29 Aug 2026
15 Jan 2025
8 Feb 2025
15 Jan 2025
6 Feb 2025
15 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
In ground floor including roof. (a) upto 150 mm. thick | 103 | cum | 939 | ₹96,717 |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 42 | cum | 447 | ₹18,774 |
| 3.01 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1.500 mm. | 4,134 | %Cum | 11,927 | ₹4,93,06,218 |
| 3.02 | (b) Depth of excavation for additional depth beyond 1,500 mm. and up to 3,000 mm. but not requiring shoring | 382 | %Cum | 19,238 | ₹73,48,916 |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 904 | %Cum | 7,754 | ₹70,09,616 |
| 5 | (B) Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 456 | %Cum | 11,927 | ₹54,38,712 |
| 6.01 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).
(a) Depth upto 1.5 m. | 2,430 | Sqm | 386 | ₹9,37,980 |
| 6.02 | (b) For additional depth beyond 1.5 m. and up to 3.00 m | 298 | Sqm | 439 | ₹1,30,822 |
| 7 | Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | - | cum | 166 | - |
| 8 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 4,575 | Sqm | 361 | ₹16,51,575 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .