Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.6 L+₹69,763.25 (5.01%)Rejected-AOC CHAVARANAL HOUSE UPPUKANDAM PO IDUKKI 685514 | IDUKKI | KERALA | 685514 | L2 | Rejected-AOC L2 |
Tender Value
₹12.7 L
EMD Value
₹31,773
Closing Date
14 Mar 2023, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT ENGINEER
ASSISTANT ENGINEER LIDEW KATTAPPANA MUNICIPALITY
Annual Plan-annual projetcs 2022-2023-kattappana municipality tribal school kampi veli sthapikkal (363/23)-General Civil Work
2023_LSGD_562975_1
07/2022/AE/LIDEW/KTPMCP/I PHASE
Open Tender
Civil Works - Others
Item Wise
180 days
KATTAPPANA MUNICIPALITY
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,773
Yes
27 Apr 2023
2 Mar 2023
14 Mar 2023
2 Mar 2023
14 Mar 2023
2 Mar 2023
Amount
Fencing work
15.36:Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead.
15.44.1:Dismantling G.I. pipes ( external work) including excavation and refilling trenches after taking out the pipes, manually / by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer- in- Charges:15 mm to 40 mm nominal bore
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
16.18.1:Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
Joseph Varkey
Bidder Name
Joseph Varkey
Venu Sunny
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_829885.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .