Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.47Accepted-AOC | ₹1.47 Quoted ₹1.48 | L-1 | Accepted-AOC L-1 BIDDER QUOTED NEGOTIATED RATE IS 1.47 PERCENT. |
| 2 | L-2₹1.67+₹0.19 (12.8%)Rejected-AOC | ₹1.67+₹0.19 (12.8%) | L-2 | Rejected-AOC L-2 BIDDER |
| 3 | L-3₹2.66+₹1.18 (79.7%)Rejected-AOC | ₹2.66+₹1.18 (79.7%) | L-3 | Rejected-AOC L-3 BIDDER |
| Sl No | Description | Qty | Unit | Space Ace | ENGINEERING CONCEPT AND SOLUTIONS | Torsion Engineers and Consultants |
|---|---|---|---|---|---|---|
| 1.00Name of civil work:- Civil work for Establishment of new Cattle Feed Plant of 150 MTPD capacity, expandable upto 300 MTPD, at Kota, Rajasthan. | ||||||
| 1.01 | Total Net FOR Rates in percentage % for complete consultancy charges as per issued letter of empanelment to Architect cum Structural consultants, inclusive of all expenses and taxes (GST) .
Note :- Consultant Visits: The consultant shall make a total 15 minimum visit during the project period. All costs related to travel, lodging, boarding, and applicable taxes for these visits are included in the quoted price.(Site visit report submitted in office during construction). | 1 | Nos | 1.67 ₹1.67 | 1.48 ₹1.48 Lowest | 84,96,000 ₹84,96,000 |
Tender Value
₹54.4 L
Closing Date
21 Jul 2025, 6:00 pmClosed
MD, RCDF
RCDF, SARAS SANKUL, J.L.N MARG, JAIPUR, RAJASTHAN.
Limited tenders for consultancy for Civil construction through Architect cum Structural consultant in category (A) for the work Civil work for Establishment of new Cattle Feed Plant of 150 MTPD capacity, expandable upto 300 MTPD, at Kota, Rajasthan
2025_RCDF_475257_1
RCDF/DPM n Proj/C 4008 IV/2025-26/16022-27 09.07.2025
Limited
Consultancy
Percentage
RCDF
As per Empanelment Letter
1 document required · 1 mandatory
₹0
MD RISL
Exempted
19 Sept 2025
9 Jul 2025
22 Jul 2025
9 Jul 2025
21 Jul 2025
9 Jul 2025
Name of civil work:- Civil work for Establishment of new Cattle Feed Plant of 150 MTPD capacity, expandable upto 300 MTPD, at Kota, Rajasthan.
Total Net FOR Rates in percentage % for complete consultancy charges as per issued letter of empanelment to Architect cum Structural consultants, inclusive of all expenses and taxes (GST) . Note :- Consultant Visits: The consultant shall make a total 15 minimum visit during the project period. All costs related to travel, lodging, boarding, and applicable taxes for these visits are included in the quoted price.(Site visit report submitted in office during construction).
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .