Tender Value
₹4.4 L
EMD Value
₹4,500
Closing Date
23 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Executive Engineer, PWD.,
Buildings C and M Division, Trichy
Special Repair to Waiting shed and Sitting bench arrangements in CEmONC, Pharmacy old emergency block at Mahatma Gandhi Memorial Government Hospital at Trichy in Trichirappalli District
2026_PWD_711719_1
T5-04/2026-27
Open Tender
Civil Works - Buildings
Item Rate
60 days
Mahatma Gandhi Memorial Government Hospital at Tr
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹4,500
7 Oct 2026
7 Oct 2026
23 Oct 2026
7 Oct 2026
23 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 7.95 | M3 | - | - |
| 2 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 8.6 | M3 | - | - |
| 3 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 20.1 | M3 | - | - |
| 4 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 7.1 | M3 | - | - |
| 5 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | 2.92 | M3 | - | - |
| 6 | Brick work in Cement Mortar 1:5 (One cement and five crushed stone sand ) using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 6.5 | M3 | - | - |
| 7 | Brick partition walls of 11.50cm thickness using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) in ground floor | 8.1 | M2 | - | - |
| 8 | Providing granolithic floor finish of the 20mm thickness with plain cement concrete 1:2:4 (One Cement, Two Crushed Stone Sand and Four aggregate) using 6 to12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trowel, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 57.3 | M2 | - | - |
| 9 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 74 | M2 | - | - |
| 10 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 20 | M2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
TenderCondition4.pdf
Tender Documents • 1.46 MB
BOQ_855017.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .