Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹2.0 Cr+₹9.4 L (4.76%)Accepted-AOC | ₹2.0 Cr+₹9.4 L (4.76%) Quoted ₹2.1 Cr | L3 | Accepted-AOC AoC |
| 2 | L1₹2.0 CrRejected-AOC | ₹2.0 Cr | L1 | Rejected-AOC Rejected |
| 3 | L2₹2.1 Cr+₹9.0 L (4.54%)Rejected-AOC | ₹2.1 Cr+₹9.0 L (4.54%) | L2 | Rejected-AOC Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
19 Dec 2020, 5:00 pmClosed
EE RWSS DIVISION BALASORE
O/O EE RWSS DIVISION BALASORE
RPWS WITH RCC ESR
2020_RWSS_64418_1
TCN NO. 16 DT. 24-11-2020
National Competitive Bid
Civil Works - Water Works
Lump-sum
330 days
BALASORE
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.1 L
Yes
5 Mar 2021
11 Dec 2020
24 Dec 2020
11 Dec 2020
19 Dec 2020
11 Dec 2020
11 Dec 2020 - 18 Dec 2020
Amount
Laying and Jointing PVC Pipe. Heading
Supplying all materials , labour , T&P , design , drawing , soil testing etc. completein all respectfor construction of RCC Roof building pump house and construction of compound wall for pump house and construction of approach road alongwith site Development including laying , testing and commissioning of Rising main & Distribution system pipe line such as UPVC , HDPE , ASTM , GI pipe lines etc. along with required fittings & specials and construction of RCC Valve chambers(water proof), public stand posts , individual house hold connection , stand alone , storage tank , installation of Chlorination system , installation of asubmersible pump withmotor in deep Tube well etc. ( Including supply of stand by pump motor ) , internal wiring of pump house & installation of Servo Stabilizer , External Electrification etc. as per supplied Drawing in section - 7 and detail scope of work & Technical specification , Quantity of work mentioned in section - 5 and in ( Annexure - A to G ) of village PANDURUNGI . All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimentions are as per supplied drawings and as per direction of Engineerr- in -charge. All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7.00 mtr and residual chlorine of 0.20 mg/ ltr without any leakage in the entire PWS System.
Supplying all labour , T&P and materials including taxes for soil testing, supply of design( Full raft without hollow section type), drawing approved from( State Technical Sanction Agency), Construction, errection, testing & commissioning etc. of RCC eleveted storage reservoir of 1,00,000 Ltrs capacity with necessary staging height of 15 Mtr cosisting of minimum 6 nos RCC columns and circular dome using CC M-25(Reinforcement MK-SAIL/TATA/RINL/JINDAL with EQR , TMT & FE - 500 Grade) with 24x21 contineous curing hours of concrete with water stopper in vertical wall joint and mixing of water proofing compound at the time of concreting to make the ESR water proof/damp proof, 3nos ISI marked CI butter fly valve & one of RCC valve chamber, supplying, fitting & fixing of GI pipe of required dia & length from source to ESR , ESR to sluice valve , for in-let, out - let, over flow & washing line, RCC stair case with SS hand rail at dome & landing etc & stainless steel ladder in side & out side the ESR fixing properly to resist the poll out force), lightening arrester, water level indicator, CI puddle collar, 0.6M dia CI manhole cover with locking arrangement at dome, RCC vent with Brass jally etc. complete as per direction of Engineer - in -charge.
Operation, repair & maintenance of the PWS Project for five ( 5 ) calender years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems.The contractor shall maintain LOG BOOK & complain register at Pump house . The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes including supply of labour, T&P material and consumables (excluding energy charges) as per terms and conditions of DTCN & Technical specification mentioned at Sl. No. 2.9 of section - 5.
TARINI PRASAD DAS
JAGANNATH DAS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .