Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.8 LAccepted-AOC NILAMBUR MUNICIPALITY PULIKKAL ABU ROAD CONCRETING IN WARD NO 16 PROJECT NO 19 KERALA KL | L1 | Accepted-AOC lowest | |
| 2 | L2₹72.0 L+₹16,540.32 (0.23%)Rejected-AOC KERALA KL | MALAPPURAM | KERALA | 670612 | L2 | Rejected-AOC second lowest |
| Sl No | Description | Qty | Unit | Rajendra Prasad B L2 | BIJU P L1 |
|---|---|---|---|---|---|
| 1.00Pond | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 300 | hour | 338 ₹1,01,400 | 336.04 ₹1,00,812 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1,006.21 | cum | 252 ₹2,53,563.66 | 250.55 ₹2,52,104.66 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 2,008.09 | cum | 130 ₹2,61,052.22 | 127.42 ₹2,55,871.34 Lowest |
| 1.00 | OD965/2025-2026:Dry rubble masonry - | 992.13 | cum | 3,885 ₹38,54,421.17 | 3,883.64 ₹38,53,071.87 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 33.45 | cum | 8,150 ₹2,72,650.1 | 8,114.04 ₹2,71,447.09 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 122.72 | sqm | 376 ₹46,140.84 | 375.54 ₹46,084.39 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 4,344.6 | kilogram | 110 ₹4,77,906.11 | 109.34 ₹4,75,038.67 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 72.94 | cum | 10,201 ₹7,44,071.14 | 10,200.33 ₹7,44,022.27 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.3 | sqm | 935 ₹280.5 | 934.81 ₹280.44 Lowest |
Tender Value
₹73.8 L
EMD Value
₹50,000
Closing Date
25 Oct 2025, 5:00 pmClosed
District Soil Conseration Officer Beach Road Kolla
District Soil Conseration Officer Beachm Road Kolla
Renovation of Pond
2025_DPK_811743_1
DSCO/KLM/245/2025-G
Open Tender
Civil Works - Others
Item Rate
KIZHAKKE KALLADA GRAMA PANCHAYAT Ward I
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
Yes
₹50,000
Yes
7 Nov 2025
18 Oct 2025
27 Oct 2025
18 Oct 2025
25 Oct 2025
18 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1355846.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_1355846.xls
BOQ • 0.32 MB
SBDMARTHANDAPURAM.pdf
Tender Documents • 1.12 MB
epay.pdf
Other Document • 0.01 MB
DECLARATION.pdf
Other Document • 0.02 MB
copyoflicense.pdf
Other Document • 0.18 MB
gst.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .