Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 CrAccepted-Finance | ₹4.2 Cr | 1 | Accepted-Finance 1ST LOWEST |
| 2 | 2₹4.2 CrRejected-Finance 4 295 SECTOR NEAR DELHI PUBLIC SCHOOL GOMTI NAGAR LUCKNOW 226010 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | ₹4.2 Cr | 2 | Rejected-Finance 2ND LOWEST |
| 3 | 3₹4.2 CrRejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹4.2 Cr | 3 | Rejected-Finance 3RD LOWEST |
| 4 | 4₹4.2 CrRejected-Finance | ₹4.2 Cr | 4 | Rejected-Finance 4TH LOWEST |
| 5 | 5₹4.3 CrRejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹4.3 Cr | 5 | Rejected-Finance 5TH LOWEST |
| Sl No | Description | Qty | Unit | SHIV SUNDER CONSTRUCTION & CONSULTANTS PVT LTD L4 | M/S CHAUDHARY ENTERPRISES L3 | M/S ADITYA CONSTRUCTION L7 | M/S BABY SHAHI L2 | SHIVAM ENTERPRISES L5 | M/S PRABHAT TRADERS L6 | M/S UNITE ENTERPRISES L8 | ASHUTOSH KUMAR VERMA L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing of RCC work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meter lead as per diarection of er. In charge. | 163.73 | Cum. | 1,500 ₹2,45,595 | 1,000 ₹1,63,730 | 1,080 ₹1,76,828.4 | 1,392.36 ₹2,27,971.1 | 1,409 ₹2,30,695.57 | 500 ₹81,865 Lowest | 945.5 ₹1,54,806.71 | 1,200 ₹1,96,476 |
| 2.00 | Demoloshing Brick work manually/by mechanical means including stacking of servicable material and disposal of unservicable material with in 50 meter lead as per direction of er in charge. | 4.24 | Cum. | 800 ₹3,392 | 500 ₹2,120 Lowest | 630 ₹2,671.2 | 806 ₹3,417.44 | 816 ₹3,459.84 | 500 ₹2,120 Lowest | 645.3 ₹2,736.07 | 700 ₹2,968 |
| 3.00 | Dismentling old cement plaster,including all cost of labour and T&p etc. Required for proper completion of work. | 344.8 | Sqm. | 30 ₹10,344 | 25 ₹8,620 | 36 ₹12,412.8 | 32 ₹11,033.6 | 33 ₹11,378.4 | 20 ₹6,896 Lowest | 28.45 ₹9,809.56 | 40 ₹13,792 |
| 4.00 | Cement concrete in 1:3:6 (M-10) Cement, coarse sand and brick ballas includind all cost of material, labour and T&P etc. required for proper completion of work. | 36.87 | Cum. | 5,000 ₹1,84,350 | 5,000 ₹1,84,350 | 5,400 ₹1,99,098 | 4,815.86 ₹1,77,560.76 Lowest | 4,875 ₹1,79,741.25 | 5,700 ₹2,10,159 | 5,475.5 ₹2,01,881.68 | 5,000 ₹1,84,350 |
| 5.00 | R.C.C. work in 1:1.5:3 C.C. Mix (M-20) including all cost of labour and T&P etc but not including reinforcement cost. Required for proper completion of work. | 278.61 | Cum. | 7,800 ₹21,73,158 Lowest | 9,000 ₹25,07,490 | 8,100 ₹22,56,741 | 8,125.38 ₹22,63,812.12 | 8,224 ₹22,91,288.64 | 9,500 ₹26,46,795 | 7,945.5 ₹22,13,695.75 | 9,200 ₹25,63,212 |
| 6.00 | Providing and laying steel reinforcement with cutting, bending and binding including cost of steel and binding wire placing in proper position. including cost of all material, labour T&P etc. Required for proper completion of work. | 26,474.53 | Kg. | 70 ₹18,53,217.1 Lowest | 80 ₹21,17,962.4 | 81 ₹21,44,436.93 | 72.43 ₹19,17,550.21 | 73 ₹19,32,640.69 | 80 ₹21,17,962.4 | 82.5 ₹21,84,148.73 | 70 ₹18,53,217.1 Lowest |
| 7.00 | Centering and shuttering for R.C.C.work, including cost of all shuttering material, labour T&P etc. Required for proper completion of work. | 2,969.97 | Sqm. | 600 ₹17,81,982 | 700 ₹20,78,979 | 720 ₹21,38,378.4 | 678.96 ₹20,16,490.83 | 687 ₹20,40,369.39 | 500 ₹14,84,985 | 465 ₹13,81,036.05 | 400 ₹11,87,988 Lowest |
| 8.00 | Brick work in 1:4 cement morter with coarse sand,including all cost of labour and T&P etc.Required for proper completion of work | 237.67 | Cum. | 6,300 ₹14,97,321 | 7,000 ₹16,63,690 | 6,000 ₹14,26,020 | 5,794.94 ₹13,77,283.39 Lowest | 5,866 ₹13,94,172.22 | 6,800 ₹16,16,156 | 6,572.15 ₹15,62,002.89 | 6,500 ₹15,44,855 |
| 9.00 | Cement Plaster in 1:4 Cement mortar includind all cost of material, labour and T&P etc. required for proper completion of work. | 1,068.93 | Sqm. | 200 ₹2,13,786 | 200 ₹2,13,786 | 207 ₹2,21,268.51 | 199.34 ₹2,13,080.51 | 202 ₹2,15,923.86 | 150 ₹1,60,339.5 Lowest | 235.2 ₹2,51,412.34 | 200 ₹2,13,786 |
| 10.00 | Providing & fixing of M.S. hollow pipe railing includind all cost of material, labour and T&P etc. required for proper completion of work. | 1,69,046.67 | Kg. | 110 ₹1,85,95,133.7 | 107 ₹1,80,87,993.69 | 111.6 ₹1,88,65,608.37 | 102 ₹1,72,42,760.34 | 104 ₹1,75,80,853.68 | 100 ₹1,69,04,667 Lowest | 107.5 ₹1,81,72,517.03 | 100 ₹1,69,04,667 Lowest |
Tender Value
₹5.1 Cr
EMD Value
₹10.3 L
Closing Date
20 Jul 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT03
2026_UPIDC_1168704_3
04/SE-XII/2026-27
Open Tender
Civil Works
Fixed-rate
240 days
LAKHIMPUR KHERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹10.3 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
24 Aug 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing of RCC work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meter lead as per diarection of er. In charge. | 163.73 | Cum. | - | - |
| 2 | Demoloshing Brick work manually/by mechanical means including stacking of servicable material and disposal of unservicable material with in 50 meter lead as per direction of er in charge. | 4.24 | Cum. | - | - |
| 3 | Dismentling old cement plaster,including all cost of labour and T&p etc. Required for proper completion of work. | 344.8 | Sqm. | - | - |
| 4 | Cement concrete in 1:3:6 (M-10) Cement, coarse sand and brick ballas includind all cost of material, labour and T&P etc. required for proper completion of work. | 36.87 | Cum. | - | - |
| 5 | R.C.C. work in 1:1.5:3 C.C. Mix (M-20) including all cost of labour and T&P etc but not including reinforcement cost. Required for proper completion of work. | 278.61 | Cum. | - | - |
| 6 | Providing and laying steel reinforcement with cutting, bending and binding including cost of steel and binding wire placing in proper position. including cost of all material, labour T&P etc. Required for proper completion of work. | 26,474.53 | Kg. | - | - |
| 7 | Centering and shuttering for R.C.C.work, including cost of all shuttering material, labour T&P etc. Required for proper completion of work. | 2,969.97 | Sqm. | - | - |
| 8 | Brick work in 1:4 cement morter with coarse sand,including all cost of labour and T&P etc.Required for proper completion of work | 237.67 | Cum. | - | - |
| 9 | Cement Plaster in 1:4 Cement mortar includind all cost of material, labour and T&P etc. required for proper completion of work. | 1,068.93 | Sqm. | - | - |
| 10 | Providing & fixing of M.S. hollow pipe railing includind all cost of material, labour and T&P etc. required for proper completion of work. | 1,69,046.67 | Kg. | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
TD3.pdf
Tender Documents • 2.51 MB
BOQ_2192760.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].