Loading…
Loading…
Tender Value
₹85.0 L
EMD Value
₹85,010
Closing Date
30 Apr 2026, 6:00 pmClosed
Dy.Minicipal Commissioner - West Zone
Work of Repairing Breckdown of Drainage line and Storm water line at different t.p. roads,& diff. places in Navrangpura ward,Making machine hole ,repairing and ancillary works related to drainage/storm water line Ambawadi area and Navrangpura area in Navrangpura Ward In West Zone
293461
9/25-26 (T.N.5)
Open
Civil Works - Others
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹2,400
Municipal Commissioner, Ahmedabad
₹85,010
3 Apr 2026
3 Apr 2026
3 Apr 2026
30 Apr 2026
3 Apr 2026
Providing and laying cement concrete work 1:2:4 (1-
Cement:2-Coarsesand:4-graded stone aggregates 20mm
nominal size) and curing complete excluding cost of
formwork and rein for cement for reinforced concrete
31 15 work in (A)Foundations,footings,Base or columns and
Mass concrete (upto 10 ton) (Based on Building SOR
Providing and installation of barricading with retro- reflective
paint/ film/ tapes (Minimum 3.0Mt. height) as specified in the
drawing & specifications for the construction of road work,
along with necessary diversion arrangement for existing traffic
movement in an unobstructed condition, all relevant markings,
sign boards and illumination as per relevant MORT&H
32 50 specification. Precoated galvanised iron profile sheets shall be 654.91 Rmt
of approved make and shade having 0.50 mm (+0.05 %)
total coated thickness with zinc coating 120 grams per sqm as per
IS: 277, in 550 mpa steel
grade, 5-7 microns epoxy primer on both side of
the sheet and polyester top coat 15-18 microns. Rate to
be inclusive of all materials, fabrication works, paint works
for information (retro reflective paint), foundation works,
transportation,
loading, unloading, installation, dismantling and inclusive of all
taxes and including the same design for providing
openable gates. No extra rental will be given to the contractor
in case of any delays from his part for construction or due to
any valid time limit extensions. Each barricading sheet is to
be numbered with a unique number. The barricading provided
shall be retained in position at site continuously i/c shifting
of barricading from one location to another location as
many times as required during the execution of the entire work
till its completion. Rate include its maintenance for damages,
painting, all incidentals, labour materials, equipments and works
required to execute the job. The barricading shall not be removed
without prior approval of Engineerin- Charge. (Note :- One time
payment shall be made for providing barricading from start of
work till completion of work i/c shifting. The barricading
provided shall remain to be the property of the contractor on
completion of the work). Blinkers are to be installed on
the barricading and rate for blinkers will be payable as per
Barricading is to be cleaned by means of
Barricading the entire break down or excavated area on rental
basis using wooden ballies / M.S.angles at max. 2.00 meter
centre to centre,
C.G.I. Sheet, reflective paint / Board out side to avoid
accident & for smooth traffic diversion & movement including
cautionary board etc. Item also includes for making temporary
33 150 sufficient nos of lighting arrangement through out the work 80.35 Rmt
with necessary required arrangement. ..The same shall be
removed after completion of work. (Only for break down work
from start to complete) (Based on
Drainage SOR 2009-10)
Manufacturing,and supplaying steel vantilation colums
cms dia medium class pipe with 60 x 60 cm 20 mm thick base
plate and stiffeners C.I ormamental cap 50 Kg and necessarey
34 1 foundation nut bolts with one coat or red lead oxide paint etc as 11660.00 No
per drawing and
carting to the work site etc. (GWSSB SOR 2021-22)
Labour charges for erecting steel ventilation colums
cms dia with ornamental cap safety with the help of reqyuired
capicity of hydra crane and base fixed with necessarey
foundation with coat or lead oxide paint and two coat of any
35 1 approved colour with 15 cms dia stone ware of RCC pipe
connecting with MH including excavation and jointing as
required etc.(GWSSB SOR 2021-22)
Providing and operation dewatering Pump including
fuel charges & operator Charges etc. as directed etc. comp.
(Shift for Eight Hour) (For Each Pump Set, No payment should be
36 100 allowed for non working condition of machinery) (Based 535.71 Shift
Previously approved rate by C E sir )
Hiring and operating Mud Pumps incl. Cost of fuel and operator
including the cost of to and fro transportation, laying of the delivery
hoses as required, lowering and lifting the pumps as and when
required etc. complete. Set Do As Directed. (No payment should be
37 2000 allowed for non 18.37 H.P/Hr
working condition of machinery ) ( Based on Previously
approved rate by C E sir )
Hiring and operating the 20 KV 3 Phase Electric Generator for
operating desilting machinery, and lighting and other
requirements with Arranging diesel to run the D.G. Set Do As
38 100 Directed. 8 Hrs Shift. (No payment should be allowed for non 2800.00 Shift
working condition of machinery ) ( Based on Previously approved rate
Hiring and operating the 60 KV 3 Phase Electric Generator for
operating desilting machinery, and lighting and other
requirements with Arranging diesel to run the D.G. Set Do As
Directed. 8 Hrs Shift. (No payment should be allowed for non
working condition of machinery )
( Based on Previously approved rate by C E sir )
Providing & Supplying JCB Machine on rental basis in case of
emergency situation and break down type work & also during
unavoidable condition as per instruction of engg.incharge, rate
includes all nece. shifting, fuel and operating charges and stacking
of useful & non-useful materials separately up to store. (No payment
40 125 should be allowed for non working condition of machinery and 535.71 Hour
for pipe line excavation and laying work) (Based on
Previously approved rate by CE sir )
Providing & Supplying Hitachi Machine -110 capacity
on rental basis in case of emergency situation and break down
type work & also during unavoidable condition as per
instruction of engg.incharge , rate includes all nece. shifting, fuel
41 50 and operating charges . (No payment should be allowed for
non working condition of machinery )
(Based on central work shop rate)
Providing & Supplying Hitachi Machine -200 capacity
on rental basis in case of emergency situation and break down
type work & also during unavoidable condition as per
instruction of engg.incharge , rate includes all nece. shifting, fuel
42 125 and operating charges. (No payment should be allowed for
non working condition of machinery )
(Based on central work shop rate)
Providing & Supplying hydra carne Machine of 12 tone Per
capacity on rental basis in case of emergency situation and break hr Shift
down type work & also during unavoidable condition as per
instruction of engg.incharge , rate includes all nece. shifting, fuel
43 65 and operating charges . (No payment should be allowed for
non working condition of machinery)
(Based on central work shop rate )
Supplying electric breaker machine for RCC slab or asphalt
demolishing work on site by using operator, fuel, power supply
etc.complete as directed. (no payment should be allowed for
44 1 non working condition of machinery and for pipe line excavation 1071.42 Shift
and M.H. work. Allowed only for break down work)
(Based on Previously approved rate by CE sir )
Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator,
fuel, power Supply etc. Complete as Directed. (No payment
should be allowed for non working condition of machinery
45 100 and for pipe line excavation and M.H. work. Allowed only for
break down work) (Based on
Previously approved rate by C E sir )
46 100 Hiring of tractor with trolley considering 8 Hrs. As 2104.09 Day
working day hours incl.Driver (GWSSB SOR 2021- 22)
47 25 Hiring of Three wheeler carrier (Chakado/Rixa) 1153.24 Day
considering 10 Hrs. as working day hours incl.Driver
(GWSSB SOR 2021-22)
48 1 Levelling or orientation of existing gully trap chamber incl. 71.42 No.
Nece. masonry in CM 1:6 and plaster in CM 1:3 etc. using old
G.T.stone and cover etc. comp.
Constructing Bombay Pattern Type Catch Pit of size
0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop.
of CM (1:6) with 40 mm thick IPS flooring in the prop M15
49 25 at bottom and 15 mm thick cement plaster inside the catch pit in 3125.00 No.
the proportion of CM (1:3) with out jali etc. comp. as
directed. (As per R.A. Based on Building SOR 2015-16)
50 25 CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm 1383.92 No.
x 600mm clear opening etc. comp. As
directed by engineer in charge. (Based onCentral Store
51 Demolition incl. stacking of serviceable materials &
disposal of unserviceable materials with all lead and lift.
100 (d) Tiles or Stone flooring (20.23,page 219) 28.13 Smt
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size ; shape
(Usually Uni-Paver Blocks) using black trap
good quality aggragate of 20 mm nominal size for
footpath, parking areas, service lanes and other areas as
mentioned in the drawing
/ instruction of engineer in charge. Cost includes formworks
using rubber mould, Rate providing and laying paver blocks as
per required grading and specification. The paver block
shall be mechanically compacted. The work of paving
blocks shall be executed in line and level by skill mason of
52 10 flooring work only. It should be laid in such a way that the no 383.03 Smt
cutting of the paver block to be
necessary. if cutting of paver block necessary
then it should be cut by machine only and carting. The
finished surface of the paver block shall have resonably good,
plain finished. Paver blocks shall be compacted and shall
be relaid if necessary.
Gravel or such type of materials shall not be allowed for
production. Laying on 5 cms thick sand bedding(As per ARC)
53 Provdg. & laying cement concrete 1:5:10 (1 cement
: 5 coarse sand : 10 hand broken stone aggregates40 mm nominal
size) and curing completeexcluding cost
of form work in. (Bldg.Sor 2015- 16,item no.5.3.4,page no-49)
10 (A) Foundation and plinth 1927.95 Cmt
54 1 Labour work for fixing any kind of paving with cement 69.64 Smt
pointing in CM 1:2, including watering, ramming etc
comp. as dir.For pavement I) Laying on
Sand bedding as per requirement to fix theC.C.Block /
Nibhada Stone in Line & Level
Labour work for reinstament or asphalt pavment covering
excvation watering consoldation resoiling meating with the
activity of teackcoat including carting the mix from the
55 100 nearest store pacting it with convayance charge of 44.64 Smt
excavation earth
etc.comp as directed...(Road SOR 15-16)
Providing, laying, spreading and compacting gradedstone
aggregate to wet mix macadam specificationincluding
premixing the Material with water at OMCin mechanical
mix plant carriage ofmixed Materialby tipper to site, laying
56 100 inuniform layers in subbase/ base course on wellprepared 1135.58 cmt.
surface andcompacting withvibratory roller to achieve
thedesired density as per MoRTH clause
57 1 Supply of graded machine cut black trap stone aggregate 870.53 Cmt
(metal) of Sevaliya / Tima or equivalent quality metal of size 25
mm to 40 mm. (Road SOR 15-16)
Labour work for spreading the metal 85 mm thick in single layer,
incl. providing & applying bitumen for semi grouting
kgs/sqm. & Providing & spreading the key black trap
aggregate of good quality on top at the rate of 0.013 cmt. per
58 1 sq.m. of size 18 mm passing in 112.81 Smt
9.5 mm retain rolling with 10 tonne roller etc. comp. as
directed.(Road SOR
59 100 Filling in plinth with sand under floors including 300.3 Cmt
watering ramming, consolidating and dressing etc. complete.
Providing & Fixing M.S. Structure , grill,gate,
elevation element of Decorative pattern with M.S.
Channel, flat,medium grade m.s.pipe,square , M
S plate with nece.bending to cover pipe Top or
round bars with round heandedbolts,nuts,or by screw. 59.84 Kg.
incl. applying one coat zinc primer and two coat of
Temporary / Permanent Plugging for blocking of sewer line,
branch connections and diversion of flows and removal of all
61 plugs by any means etc. comp. as directed by Engineer In
Charge of the work.
Provide everything else required for diversion of flow by
pumping and / or bypassing and to maintain the sewerage
system functioning normal and managing the flow without any
62 sur-charging, overflows etc during the De-silting/ rehabilitation
works of the sewer line to the satisfaction of the
Engineer incharge of the work.
(A) 2 300 mm dia 89.29 RMT
(B) 2 450 mm dia 133.93 RMT
(C) 2 600 mm dia 223.21 RMT
(E) 2 900 mm dia 401.79 RMT
(G) 2 1200 mm dia 455.36 RMT
Providing and laying in position Ready Mixed M-250
grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead up
10 kms having continuous agitated mixer, manufactured as
per mix design of specified grade for reinforced cement
concrete work including pumping of R.M.C. from transit
mixer to site of laying, and curing complete. excluding the
cost of centering shuttering finishing and reinforcement
including cost of admixtures in recommended proportions as
per IS: 9103 to accelerate/ retard setting of concrete,
improve workability without impairing strength and
durability as per direction of the Engineer - in - charge.
Without Fly Ash (Min cement level as per latest IS
shall be maintained) (Cement level 450 kg ) (A) Foundations,
footings, Base of
columns and Mass concrete.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
West Zone, Zonal Office", 2nd Floor, A.M. Office, Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
Municipal Commissioner invites Percentage Rate sealed tenders from interested
MEMORANDUM OF WORKS IN BRIEF
1 Name of work vrµbÍtul lJhkdvwht Jtuzobtk ytkctJtze rJM<th <&t lJhkdvwht rJM<thltk
swœt swœt xe.ve.htuz ,ltul xe ve htuz buRl htuz <&t ykœh le djeytubtk Mxtu[b
Jtuxh zu[lus jtRl ltFJt <&t cu{fztWl hevuhekd fhJt <&t lJuu fuavex
cltJJtlt ftb ctc< (ARC).
2 Time Limit 12 Months
3 Tender Validity Period 120 Days from the date of opening of the tender
4 Eligibility Criteria Register “D” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs.
6 Earnest Money Deposit Rs.85010/- (D.D. / Pay Order / Local Micr Check/B.G. in favour of Municipal
Commissioner, Ahmedabad /) To be submitted as below. Demand Draft or Bank
Guarantee shall be from Nationalized Bank / Sheduled Bank and valid for 120 days. (As
per Latest AMC finance dept.circular).
7 Security Deposit 5 % of the Sanctioned Tender Amount in form of Bank Guarantee/
Demand Draft / Local MICR Cheque. & attched ANNEXURE - 1 finance
dept.circular No- 14 Dt.4/6/13
8 Tender fees Rs.2400/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to Assistant
Manager (west zone),Ahmedabad Municipal Corporation, West Zone,
Zonal Office", Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad.
10 Tenders issue date Tenders from the AMC website www.amc.nprocure.com &
www.nprocure.com shall be down loaded from AS PER TENDER NOTICE
11 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.. The
Tenders. tenders received after latest schedule date and time will not be entertained
under any circumstances. date. 1.5.2026 &12:00 pm
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum (only
Techanical Bid) to Assistant Manager / Dy.C.E.(W/Z) office, 2nd Floor,
Dr. Ramanbhai Patel Bhavan,Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013 date. 1.5.2026 &15:00
13 Mode of sending the Document shall be physically submitted in sealed envelope By
Tender Documents and RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate (One
evalution of tender Original & One Duplicate) duly sign & seal by contractor
Tenders received without EMD shall be considered as Non-Responsive and
shall be rejected outright.
14 Terms, Condition, & All general condition of contract of Form D condition of contract shall
Specification be applicable..
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at his own expense
any defect which may develop or may be noticed before the period mentioned
hereunder from the certified date of completion, The within 15 days of receipt of
the notice. In the case of failure on the part of the contractor, the Engineer-in-
charge may rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate the whole or
any part of the amount of security deposit towards the expenses, if any, Incurred
by him in rectification, removal or re-execution. The Defects Liability period
shall be as under(a) for all works costing upto Rs. 50,000 ( amount put to
tender), the period shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore (amount put
tender), the period shall be 6 months from the certified date of completion or one
monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
months from the certified date of completion which should include one
(d) For building works, the period specified in (a), (b) or (c) above OR elapse of
monsoon period following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September may be
treated as the last date.
16 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor or major
parts of work of part thereof of any amount, the contractor shall be bound to start the
works within 48 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and through letter / E-mail shall be
considered legal and binding for the same. Failure of comply to start the
works in 48 hours of intimation as above by contractor the contractor shall
be levied penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above 10 Lakhs and
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
Lakhs). Three times failures by contractor shall make contractor
responsible to be black listed unless and otherwise justified properly in
writing / binding within 15 days of last notice of penalty.
17 Compensation for Delay 10% of Remaining work (As per Circular)
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the
Final Submission Time And Date. The Same Shall From a part Of Tender
And The Same As to be Attached Along With The Tender Document.
19 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
20 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject
any or all the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Addl City Engineer
AMC Finance dept. circular No – 41, Dt.08/02/2022
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
(1) All Nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to
March- 31, 2022. The validity cut-off date in the GR is with respect to the date of issue of
Bank Guarantee irrespective of the date of termination of Bank Guarantee. Guarantees issued
or Authorized by Ahmedabad Branch Only.
(1) Commercial Banks:
(3) ICICI Bank.
(5) Kotak Mahindra Bank
(6) IndudInd bank
(8) Tamilnadu Mercantile Bank
(9) Ujjivan Small Finance bank
(10) A U Small Finance Bank
(11) Fedaral Bank Bank
(12) Equitas Small Finance bank
(13) Bandhan Bank
(14) Standard Chartered Bank
(2) Co-Operative & Rural Banks of Gujarat
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (hereinafter called “the
Employer”) invites sealed Tender document from reputed and qualified bidders for the
construction of Works detailed in the Table below:-
Sr. Name of Works Approximate Earnest Completion
No value of works Money Period
. (Rs.) Deposit
1 vrµbÍtul lJhkdvwht Jtuzobtk Rs. 85,01,092.73 Rs.85010.00 12 Months
ytkctJtze rJM<th <&t
lJhkdvwht rJM<thltk swœt swœt
xe.ve.htuz ,ltul xe ve htuz buRl
htuz <&t ykœh le djeytubtk
Mxtu[b Jtuxh zu[lus jtRl ltFJt
<&t cu{fztWl hevuhekd fhJt <&t
lJuu fuavex cltJJtlt ftb
2. Interested bidders shall download the tender documents from AMC’s website
www. amcnprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs. 2400 in the form of
Demand Draft / Pay Order from any Nationalised Bank in favour of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad, which shall be non
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for
the Works in the above Table payable at Ahmedabad and drawn in favour of
MUNICIPAL COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest
Money Deposit will have to be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone, 2nd
Floor,Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013.
6. The Bids will be opened at the office of Addl.City Engineer (W/Z) , Ahmedabad
Municipal Corporation, 2nd Floor, Dr. Ramanbhai Patel Bhavan, Usmanpura,
Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013. in the presence
of bidders or their representatives who choose to attend. In the event of the specified
date of bid submission/opening being declared a holiday for the Employer, the bids
shall be received /opened on the next working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document,
tender fee & EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two
separate envelope (marked as “original” and other marked as “Duplicate”) in schedule time by
RPAD/ Speed Post/ Hand Delivery in duplicate. The Bid envelopes shall be marked as
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be
initialed by the bidder.
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids
received for the package (except those received late) containing the sealed Tender volume
and other enclosures then announce the names of bidders in the presence of bidders or
their representatives who choose to attend on the date and time mentioned in the NIT In
the event of specified date of bid opening being declared as a holiday for the Employer,
the Tender will be opened at the appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The
Employer at the opening will announce bidder’s names, , the presence/or absence of EMD,
the amount and validity of EMD furnished with each bid, is valid registration and such
other details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in
the Invitation for Bid and has not been furnished in the form, the bid shall be rejected by
the Employer as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume
accompanied with valid EMD will be taken up for further evaluation. In case, the Bank
does not confirm the EMD, the bid shall be rejected as non-responsive and no further
evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been
properly signed, meets the eligibility and qualification criteria, has the required available
bid capacity, is accompanied by the requisite certificates, undertaking and other relevant
information specified in the bid documents and is substantially responsive to the
requirement of the bidding documents and provides any clarification for ascertaining the
correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer
and will not subsequently be made responsive by correction or modification or withdrawal
of the nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are
determined to be substantially responsive in accordance with Clause 2 and qualified for
award of Contract in accordance with Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule
date and time. In the event of specified date of bid opening being declared bidders who
qualify the criteria then bidder bid will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest
Evaluated Bid Price, provided that such bidder has been determined to be (i) eligible in
accordance with the provisions of Clause 3(General Terms and Condition); and (ii)
qualified in accordance with the provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer
will notify the successful bidder by cable/fax and confirmed by registered letter that his
bid has been accepted. This letter shall name the sum which the Employer will pay the
Contractor in consideration of the execution, completion and maintenance of the Works by
the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after
receiving letter of Indent. Time limit of work will commence from the date of issue of
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details
furnished by him in his bid. Such request by the Employer and the response by bidder shall
be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to
his bid from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids
and recommendations for the award of a contract shall not be disclosed to bidders or any
other persons not officially concerned with such process until the award to the successful
bidder has been announced. Any effort by a bidder to influence the Employer's processing
of bids or award decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and
obtain for itself on its own responsibility all information that may be necessary for
preparing the bid and entering into a contract for construction of the Works. The costs of
visiting the Site shall be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer
to enter its premises and lands for the purpose of such inspection, but only upon the
express condition that the bidder, its personnel and agents, will release and indemnify the
Employer and its personnel and agents from and against all liability in respect thereof and
will be responsible for death or personal injury, loss of or damage to property and any
other loss, damage, costs and expenses incurred as a result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender
document for the construction of works (as defined in these documents, hereinafter referred to
as "the Works") detailed in the table given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet
the following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent
The bidders shall have a registration with State PWD, and/or CPWD for "E1" class
and or equivalent. If contractor is not registered with AMC in the relevant class, on
award of contract he shall be required to register himself with AMC within 3 month's
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer,
as the Employer shall reasonably request.Subject to Submition of Succsesful Submition as per
Clause –II of R.&B.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid
may be required to provide evidence of the origin of materials, equipment, and services to the
satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined,
grown, produced or manufactured; similarly for equipments and from where the services are
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
General information
All individual firms must complete the information in this form. Nationality information shall
be provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for
any of the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which
the reasons are attributable to the non-performance of the contractor, consistent history of
litigation awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures
and words) only in E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a
partner in a joint venture. A bidder who submits or participates in more than one bid for a
contract package will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents.
Failures to comply with the requirements of bid documents will be at the bidder's own risk.
Pursuant to Clause 16, bids which are not substantially responsive to the requirements of the
bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the
bidder and the Employer shall be written in the English language. Supporting documents and
printed literature furnished by the bidder may be in another language provided they are
accompanied by an accurate translation of the relevant passages in the English language, in
which case, for purposes of interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole
works as described in bidding documents, based on the percentage rate amount in the Bill
of Quantities submitted online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in
figures and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid
for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the
Employer may request the bidders to extend the period of validity for a specified
additional period. The request and the responses thereto shall be made in writing or by
fax. A bidder may refuse the request without forfeiting his bidder agreeing to the request
will not be required or permitted to modify his bid but will be required to extend the
validity of his Bid Security for the period of the extension, and in compliance with
Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or
persons duly authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder,
in which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time
and date specified in the NIT.
Any bid received by the Employer after the deadline for submission of bids will be returned
unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been
accepted, the Employer will direct him to submit the Performance Security and attend the
Employer's office on a date determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors
to do high quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of
original and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in competing for
the contract in question. The Employer will declare the firm ineligible, either indefinitely
or for a stated period of time, to be awarded a contract by AHMEDABAD MUNICIPAL
CORPORATION if it at any time determines that the firm has engaged in corrupt or
fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private
sectors by which they improperly and unlawfully enrich themselves and/or those close
to them, or induce others to do so, by misusing the position in which they are placed,
and it includes the offering, giving, receiving, or soliciting of anything of value to
influence the action of any such official in the procurement process or in contract
“fraudulent practice” means a misrepresentation of facts in order to influence a
Procurement process or the execution of a contract to the detriment of the Borrower,
and includes collusive practice among bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and
contract without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be
liable for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume.
If the Tender volume is submitted without valid documents and without proof of eligibility
criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any
respect or are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety
Laws.(the existing laws as well as framed from time to time). Any penalties laid due to
violation of such laws shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users
of the road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber
cones, traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site.
Necessary florescent marking on traffic signs to be provided so that it should be visible at
night. During night working hours safety in charge personnel shall be provided with
florescent jackets. This shall be Provided at no extra cost by the bidder under attaché
with specified in the tender documents under payable iteme.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply
connection or new connection on behalf of AMC. It includes filling the necessary
application to power Supply Company, follow up and getting the supply, filling the
necessary test reports to the power supply company. All official fees including security
deposits and other expenses shall be of initially paid by the contractor. AMC may support
to get the temporary connection and may at its diseretien get the same converted to
permanent connection at the same of AMC if desired do,and contractor shall as no
extra cost support the same. In this case AMC my be as the remaining cost subject to
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the
contract upon any agreement for a commission, percentage, brokerage or contingent
fee. Breach of this warranty shall give the Municipal Commissioner the right to cancel
the contract or to take any other measure as the Municipal Commissioner may deem fit.
The warranty does not apply to commissions payable by the contractor to establish
commercial or selling agent for the purpose of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of
this contract or to any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out
of or under this Contract against the contractor the same may be deducted by the
Municipal Corporation from any sum then due or which at any time thereafter may
become due to the contractor under this contract and failing that under any other contract
with the Municipal Corporation or from any sum due to the contractor with the Municipal
Corporation (which may be available with Municipal Corporation), or from his retention
money, or he shall pay the claim on demand. The Municipal Corporation reserves the
right to carry out post payment audit and technical examination of the final bill including
all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over
payment when detected not withstanding the fact that the amount of the final bill may be
included by the Contractor.
If as a result of such audit and technical examination any over payment is discovered in
respect of any work done by the Contractor or alleged to have been done by him under
the contract, it shall be recovered by the Municipal Corporation from the contractor by
way of all the means prescribed above or if any under payment is discovered by the
Municipal Corporation, any amount due to the contractor under this contract or under
payment may be adjusted against any amount then due or which may at any time
thereafter become due before payment is made to the contractor from him to the
Municipal Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have
become liable and which is chargeable to the contractor, the owner shall have the right to
retain out of any payment then due or thereafter to become due an amount sufficient to
completely indemnify the owner against such lien or claim or if such lien or claim be
valid the owner may be or become due and payable to the contractor. If any lien or
claims remaining, unsettled after all payments are made, the contractor shall refund or
pay to the owner all money that the latter may be compelled to pay in discharging such
lien or claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall
form the part of the contract documents. The full consideration shall be given to such
addendum or corrigendum before submission of tender duly filled in by the contractor.
Therefore, the contractors shall have to kindly refer the tender for such addendum or
corrigendum published by AMC through its website www.amc.nprocure.com &
www.nprocure.com 48 hours prior to the deadline of submission of the tender. Tenderers
shall verify the number of addendum issued and enclose the same with the tender documents
failing which the tenders shall be liable for rejection and no any complaint in respect to this
shall be entertained under any circumstances.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and
the Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid
shall be valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned
as promptly as Early as possible as but not later than 28 days after the expiration of the period
of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be
returned when the bidder has furnished the required performance security and signed the
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the
successful bidder shall deliver to the Employer, a Initial Security Deposit Shall be
submitted as per C.E. Circular.in the form of a Bank Guarantee/ DD/Locle MICR
cheque for an amount equivalent to 5% (five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At
present a policy is framed by Audit department of AMC to charge 4% interest for the balance
period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank
guarantee as per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be
released along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time
limit. & As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT
(exculding GST) etc. on material procurement or any other component for the works from
any source shall be borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender
amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent
registration with any other state Govt. or institutions. Copy of registration should be attached
with tender document. Tenderer who was not registred in AMC must be get registred in panel
of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the correction slips made up to 15-08-1999 may be referred. (only
English version) Clause No. -2 liquidated damages for delay shall be overrule by A.M.C.’s
M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be
taken to mean as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the
absence of specific mention for a particulars point / aspect, the same in the relevant Indian
Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out
nearest to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in
its specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or
AMC's Consultant shall not absolve the contractor from the responsibility of replacing
defective materials brought on site or materials used in the work found defective at a later
date. The contractor shall have no claim to any payment or compensation whatsoever on
account of any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in
charge/ Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall
be removed from the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as
well as for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the site
of the work. All excavated trench shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and concordance
of adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the
"Minor Mineral Act", and such other laws and rules prescribed by the Government from time
16. All necessary safety measures and precautions (incl. those laid down in the various
relevant Indian Standard) shall be taken to engrave the safety of men, materials and machinery
on the work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to
the quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant
items to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding
on the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received
of sanctioned tender and resolution.Within 10 days contractor has to submit SD and after
reciveing SD Work order shall be issue to contractor and the time limit shall be start from the
date of issue of the written work order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution .Within 15 days contractor has to submit SD and after
reciveing SD work order shall be issue to contractor and the time limit shall be start from the
date of issue of the written work order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order /
demand draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor
shall have to sign contract paper with AMC. The contractor shall be fined 4% of interest per
year for delay in submission of S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation
given by M.C. Or His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour
27. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water for
drinking, washing, sanitation and cleaning down. The contractor will be responsible for all the
costs where applicable of connection, meter installation, water consumed, water required for
testing purposes, disconnection and the laying, maintenances and ultimate removal of any
distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use of
diesel operating sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their
initial/eligibility criteria mentioned above along with the bid. They shall have also to submit
the income tax clearance certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives
issued by Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work
changes & thereby total amount of work increases/ decreases.
changes & thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding
on the contractors.
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease the
scope of work. No any claim to that effect shall be entertained. The Municipal Commissioner
also reserves the right to reject any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other
special reason (like site is not available and due to unavoidable circumstances arise), after
evaluation of situation the actual date of starting of work will be consider after approval of
Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the
work done by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
ybStJtS BGþrlrmvj ftuvotuhuNl
ftb btxulwk xftJthe Sh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzhh btxule Nh<tuu
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuLî{ y&Jt htsg mhfthle btLg gtselt ftuLx[fxhtu Che
NfNu.dJobLu xlt btLg ftuLx[t[ fxhu y.Bgw.ftuvtuo. bt btLg ftuLx[tfxhtu le gtsebtkk hSMxuNl fhtJJtlwk hnuN.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
f: xuLzhhle jtgft<
ftb sJtcsth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKebtk ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu s
ytvJtbtkk ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwvk fhJt sYhe
mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybstJts Bgwrlrmvj ctuzo XhtJ lk - 383c,<t.25/11/2011 &e b¤uj bkshw e ylwmth <&t mexe.Rsluh
mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybstJts Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl
Ve,heLgwyj Ve <&t yvd{uzuNl Ve ylu btv skztu Sgtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath ylu
JvhtNlt ceò hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb fhJt,
ftb vwhwk fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzed k btxu, gtzo,
zevtu btxule søgt vtu<tle he<u b¤ u Je juJtle hnuN. u (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt
buRxulLm btxule søgt)
2: yt ftble mbg bgtost xuLzhbtk sKtÔgt bwscle hnuNu. (bubtuhuLzbbt sKtJuj «btKu) 3:
xuLzh Jujezexe rvhegz xuLzhbtk sKtÔgt bwsc hnuN.
u (bubtuhuLzbbt sKtJju «btKu)
4: xuLzh Ch<e JF<u yluMo xble ChJtle
hnuNu. 5: xuLzh Vtubo
xuLzh Vtubo ylu ylwmrw abtkl k e shufu shuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt sM<tJus
vh< fhJtlt hnuNu.
c: ftuLx[tfxhtuyu leal u e ctc<tu ft¤SvwJf o Jtka
k Jt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt sh Nçstu <ubs ytkkfztbtkk ytvJt.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkvk le J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk
bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuN.
3) Bgwrl.ftuvtuohuNllt «J<obtl rlgbtu ylwmth yluMxble ChJtle hnuN. u ylu xuLzh mt&u cezJtle hnuN.
4) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuN.
5) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
c) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt shuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
7) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7: AufAtf xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh sM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt
suJtNu lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwj w ntug <tu <ult vh l Dwkx<t
Ftuxt jFtK fu ytkkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk sNtoJj
u mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh ybtLg
dKJtbkkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdosNol
btxu mtbtLg rlgbtu ylu mwaltytu vK ft¤SvwJf o JtkkaJt rJlkk<e Au.
1) ftuRvK fthK sNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au. 8 c:
Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt
rJd<tubtkk bwfj
u Nh< y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
2) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkktgw/k ltkktgt ntug fu csÕgwk/csÕgt ntug.
3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
5) xuLzh Chlth y&Jt vuZele ctc<btkk shuf Ctdesth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu y&Jt
xuLzhbt <u btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hs fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe
hnuN. u ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu
nff stJtu fhe NfNu lrn fu ftgstfeg ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s suJtlwk Au
<Ju tu &R NfNu lrn.
9: rJmkkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< sNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf leault
rlgbtu ylwmth mhCh fhJtbtkk ytJNu.
1) xuLzh Chlthu shlt Ftltbtkk sKtJj u Nçstu ylu ytkkfzt Jåau ftuR ymkd k r<lt fumbtkk Nçstubtkk sKtJj
btLg htFJtbtkk ytJNu.
2) yufb sh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu sNtoJ<e CtJ vºtf lt Ftltbtkk&e
hfbbtkk Cwj sKtg <tu yufb sh btLg htFJtbkkt ytJNu ylu shlt yt^thu dwKtfth mw^thJtbktk ytJNu.
3) yufblt Ftltbtkk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkkt ytJNu.
4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkkfzu fhuj ftuR vK ctc< Sgtlbtkk juJtbtkk ytJNu
lrn. 10y: ftbltu «tud{um mbg bgtost bwsc fhJtltu hnuN. u
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu.
ylu <ubtk atjw ftb shBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrn.k
10c: mûtb m•tt îtht xuLzhle bkshw eltu XhtJ vtzgt cts ( LOI) ytvJtbtk ytJNu ðgth cts rsl - 15 btk rm¾gtuhexe
zevtuÍex sbt fhtJJtle hnuN. u rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohNu lbtk
«J<obtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
10f: bkswh &guj xuLzhle mbgbgtostbtk ftbdehe vqKo l &tg <tu mbgbgtost ctslt FhuFh ctfe ftble hfblt 10%
juFu (jefJezexe zubS u m) vulÕxe Jmwj fhJtbtk ytJNu.
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkkfujt sh vwhtk &gj u t ftb btxult Au ylu <ubtk bswhe,
vtjF, ÃjtLx, suFhuF,mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykkNu <btb Faoltu <&t sYh
sKtg <tu ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkf k ujt CtJ fu sh
fh<t J^thtle ftuR awfJKe ykkdult <ublt ftuR stJt Sgtlbtkk juJtNu lnekk ylu xuLzh Chlth Ftuxe
hswyt<lu fthKu y&Jt ftuR Ôgrf<yu(vAe<u ctkk^ftb rJCtdltu fboathe ntug fu l ntug)<ublu ytvuje
btne<elu yt^thu vtA¤&e ftuR stJt hsw fhJt nfsth hnuNu lnek. <ublw xuLzh ChJt <&t <ubtkk swst swst CtJ
ylu sh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt
<ubtkk&e WCt &<t ftuR stuFb fu sJtcsthebtkk&e Axfe NfNu lnek. k msh ftbbtk ftuR vK ò<lt ctk^ftblt
bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubLu x / hlekd cej Bgrw l. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.<&t
Bgrw l. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuN. u
11 f: ftuLx[t¾xhlt shuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx
+ yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh<
ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgst bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc
ftuLx[[tfxhlt cejbtkk&e fvt< fhJtbt ytJNu.
12: yu)fhth mkkc^e sM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk sNtoJj
u ftb mkkck^e sM<tJusbtkk sNtoJj
u rJd<btkk rJmkkd<<tlt rfMmtbtk leau sNtoJj
sM<tJusbtkk sNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fs
2) xuLzh Vtubolwk CtJvºtf
z[tuRkdbtk fs, ytfth, ytkkfzt fsta Ftuxt ntug <tu btvujtkk fs, ytfthlu
ylwmhJw. k ce) JKol
o e ylwmrw a-ce
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdl u e ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbtk ytJj u rlKog
ykkr<b dKJtbkkt ytJNu.
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-
atsuo Ãjtl <&t MvuNeVefNu lle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
1c :atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuN. u stu ftuR mrJom jtRllu lwfNtl
&Nu <tu <l u e mkvwKo sJtcsthe (òlbtj) ftuLx[tfxhle vtu<tle hnuN. u mtRx Wvh ftb shBgtl bswhtu fu
sl<tlt ftuR btKmlt òlbtj lu lwfNtl &tg <ule sJtcsthe ftuLx[tfxhle hnuNu.vtujem Vhegts &tg <tu
<ule sJtcsthe vK ftuLxtfxhle hnuN. u CuFz Dme l vzu <ule sJtcsthe vK vtujem Vhegtsbt ftuLx[tfxhle
hnuNu.CuFz Dme l vzu
<u btxu mjtb<elt vdjt (suJt fu stuhzwk ctk^e bswh Ftztbtkk W<thJt, mtuhekd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh bsqhlu
Ftztbtk W<thNu <tu ftuLx[t[ fxh s vtujem Vhegtsbt sJtcsth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu
sJtcsth hnuNu lrn.ytxjwk mbSlu s xuLzh ChJwk. Bswhtul tu rJbtu vK W<thJtu.
17 : ftuLx[tfxh îtht xuLzhbt sNtoJuj MveNeVefNu l bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t sYh
sKtg <tu xuMxekd fhtJJtlwk hnuNu.<&t yt ykdu «Joðbtl Bgwrl.ftuvtuho Nu lt rlgb bwsc bxehegÕm fu ceò xuMxed
hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu
mkvwKo Fao ftuLx[tfxhu Ctdu JJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u ykdu ftb
fhJt ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rsl 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtcsthe ftuLx[tfxhle hnuN. u
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/jc u h
yufx/vtujemlt ftgstlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u
21: ftuRvK ftgstfeg jexeduNl ybstJts Nnuhle ftuxb o t hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcsthe ftuLx[tfxhle hnuN. u
24: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&tJ M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle ftbdehe
fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe
fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
25: atjw ftb shBgtl «tuxf u Nlle mkvwKo sJtcsthe ftuLx[t[ fxhle hnuNu. subtkk vevzt,stuhzt, Cgmwaf ctuzo,ÃjtMxef
vxe,rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuN. u ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcsthe
ftuLx[tfxhle hnuN. u
2c: M&¤ Wvh atjw ftbdehe shBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt
rfMmbtk juch yufx bs
w c fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcsthe ftuLx[tfxhle hnuNu.
27: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuN. u <ubt shhtus fhuj ftbdehe <&t
yr^ftheytuyu ftb mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe
ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe
yuLSlehgh©elu hnuN. u
28: shuf ytRxblt MvuNeVefuNl ybstJts Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj
MvuNeVefuNl Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze. mexe.yuLSlegh©el tu
rlKog ytFhe hnuN. u Jtuxhekd fhJtbtk lrn ytJu fu shhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu
ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu
cejbtkk&e hfb ftve juJtbtk ytJNu.
29: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt
30: su ftbtubtk atubtmtlt mbgdt¤tlu cts ytvJtle Nh<tultu WÕjuF ntug ðgtk atubtmtltu vehegz <t.15 swl &e
30 mÃxuBch Mþ^eltu dKJtbtk ytJNu. yt mbg shBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u
mbgdt¤tu cts fhe ftble mbgbgtost dKJtbtk ytJNu <&t sYhegt< Bþscle xtEb jebex J^the vK ytvJtbtk
31: ftuLx[tfxhu «J<obtl ybstJts Bgw. ftuvtuohuNl lt JF<tuJF< lt mhfgwjh bwsc ve yuV,Jux <&t ylu muÕm
xuût lu jd<t vwhtJt vubLu x fh<e JF<u sYh vzu&e hsw fhJtlt hnuNu.
yufhthlwk Vtubo
1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk bu/k ybu M&¤le bwjtft< je^e Au
ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-
btne<e bu¤Je Au.
2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
sM<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe
yuLSlegh btuctEj lkch mt&u (vrùb Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 months after the order to start the works. Progress of
work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall
be as per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for
inspection by Municipal Staff. Watering of all the items shall be as per instructions otherwise
no payment shall be made to contractors. Mixing of concrete shall be done by concrete mixer
machine. Arrangements of binding vibrator for R.C.C. works if required shall have to be
made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident.
The contractor shall arrange for barricading at night and arrangement of Pagi at night to direct
the traffic. He shall be responsible for any damage to public. If any incident happen, during
the execution of work. In case of dispute for unseen or overlooked items the decision of the
Dy. City Engineer shall be final. The contractor shall have to give site clean of all rubbish
during the work and at the time of completion of work and hand over the site with final
finishing of the work as directed. All the rejected materials shall be removed from site within
24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor
shall have to prepare through of bigger size and mix the mortar in the required proportion. In
on case he shall be allowed to mix the mortar either on floor or any finished surfaces. The
contractor shall have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on
latest SOR or if item is not available in SOR than based on current market rates. In case of
extra item decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of
the propose work the contractor shall carry out the same at his quoted rates without charges
any extra and the contractor will have to carry out the works and he will be paid at the rate
quoted by him. No claim for extra rate for subsequent changes in site and design is
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor
will be fully responsible for compliance of the various provisions under contract Act.
and the Rules framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the
offer on his own during the period. If any tenderer withdraw or makes any modifications or
addition in the terms and conditions of his tender not acceptable to the Municipal Corporation
the Municipal Corporation shall without prejudice to any right or remedy be at liberty to
forfeit in full the said earnest money and black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition
delay of start shall be recovered separately from the immediate bills payable to the contractor.
Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in
form of demand draft
iv) Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R&
B Dept. - Govt. of Gujarat booklets of Building Works & and Road Works
Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADDL.CITYENGINEER
& STAMP (West Zone)
TECHNICAL SPECIFICATIONS
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
TECHNICAL SPECIFICATIONS ITEMS REQUIRED DURING EXECUTION OF DRAINAGE LINE
Item No. Excavation for foundation up to 1.5 tm. depth in all type of hard and soft soil including
1 sorting out stacking of useful material & disposing of excavated stuff up to 50 tm. lead
loose or soft soil, girding, lighting, fencing the trenches', and pits. (depth measured from
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary, concrete
and asphalt road paving work etc. Root of trees met with during excavation shall be stacked at lead of 4’
away from the trenches as per instruction so that it may not damage the sides of excavated trenches. The
sides of trenches shall be vertical and bottom shall be uniformly leveled. The excavated earth shall be
stacked at any place or places shown within 50 mtr. as directed. After completion of the work the site
shall be well dressed and cleared of all rubbish so that it may give decent appearance. Contractor shall
arrange for all materials required for lining out and shall care to preserve the level pegs given. He shall
have to arrange for shorting at his own cost if the soil is found to be loose and sandy. He shall have to
arrange for sorting out brickbats or any serviceable materials found during excavation and shall have to
stock. Nothing extra shall be paid for this. He shall have to cart the excavated soil to site shown within
mtr. If so ordered by officer in charge of this work. No old brickbats recovered from excavation shall be
allowed to be used by the contractor in the work. The depth of foundation will be as per drawing.
Contractor should arrange for safely measures so that there is no danger of falling any men or animal in
the excavated portion, otherwise he will be held responsible for the compensation to be paid as the case
may be. He should also arrange for red lamp at night times. The contractor should not damage any of the
municipal property, water lines, electric cables etc. at the time of excavation. Water lines, electric cables
etc. coming in the way will be shifted by corporation but he should see that no damage is done for gross
negligence on his part, otherwise such damages will be recovered from him. Excavated stuff will be
stacked at the site shown or will be carted by the contractor immediately as per the other item of this
tender. Instructions of C.E. or his representative will be strictly followed. Measurement shall be given on
Excavation for foundation up to (a) Up to 0 to 2.0 Mt (b) from 2.0 to 3.0 mt depth (c) from 3.0 to
5.0 mt depth (d) above 5.0 mt depth including sorting out and stacking of useful materials and disposal of
the excavated stuff up to 50 mt. lead.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary, concrete
and asphalt road paving work etc. Root of trees met with during excavation shall be stacked at lead of 4’
away from the trenches as per instruction so that it may not damage the sides of excavated trenches. The
sides of trenches shall be vertical and bottom shall be uniformly leveled. The excavated earth shall be
stacked at any place or places shown within 50 mtr. as directed. After completion of the work the site
shall be well dressed and cleared of all rubbish so that it may give decent appearance. Contractor shall
arrange for all materials required for lining out and shall care to preserve the level pegs given. He shall
have to arrange for shorting at his own cost if the soil is found to be loose and sandy. He shall have to
arrange for sorting out brickbats or any serviceable materials found during excavation and shall have to
stock. Nothing extra shall be paid for this. He shall have to cart the excavated soil to site shown within
mtr. If so ordered by officer in charge of this work. No old brickbats recovered from excavation shall be
allowed to be used by the contractor in the work. The depth of foundation will be as per drawing.
Contractor should arrange for safely measures so that there is no danger of falling any men or animal in
the excavated portion, otherwise he will be held responsible for the compensation to be paid as the case
may be. He should also arrange for red lamp at night times. The contractor should not damage any of the
municipal property, water lines, electric cables etc. at the time of excavation. Water lines, electric cables
etc. coming in the way will be shifted by corporation but he should see that no damage is done for gross
negligence on his part, otherwise such damages will be recovered from him. Excavated stuff will be
stacked at the site shown or will be carted by the contractor immediately as per the other item of this
tender. Instructions of C.E. or his representative will be strictly followed.
Measurement shall be given on Cmt. basis.
Item No.2 (a) Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC
upto 0.20 meter including demolishing the asphalt carpet,metal,soiling/cutting
Reinforcement etc. comp. with stacking the material as directed.(app.rate)
(b) 0.20 meter to 0.30 meter (By Breaker Machine including cost of operator, fuel, &
transportaion etc complete.
(c) 0.30 meter & above (By Breaker Machine including cost of operator, fuel, &
transportaion etc complete.
Extra rate for excavation of asphalt pavement of any thickness including demolishing the
asphalt carpet, metal, soiling etc. complete with stacking the materials as directed. The
road surface of asphalt shall carefully be opened to full width as directed by the Engineer
in charge Asphalt, popada's spouls, metals etc shall be separately deposited in such
places as may be determined by the Engineer-in-charge. In case above materials not
being so deposited or being mixed up with the excavated materials will not be allowed for
refilling. The cost of materials shall be charged from the contractor. The decision of the
C.E. shall be final and binding to the contractor.
The rate per sq. mt. in this item shall be paid extra addition to the rate for excavation Mode of
measurement: The rate shall be for a unit of Smt Basis.
Item No. Refilling the pipeline trencheds incl. ramming, watering, consolodating desposal
3 of surplus stuff as directed within a radius of 3 km.
The rate per Cu.mt. in this item shall be paid Refilling the pipeline trencheds
: The rate shall be for a unit of Cmt Basis.
Item No. Conveyance charge of earth ,lime,murrum, building rubbish, manual garbage,sludge
4 ,excavated rock ,fly ash, aggregate of any kind etc. comp. Up to 5.0 Km. lead
All the surplus earth etc. shall be carried away immediately from the site of work to a place within
5 km. distance or as directed and ordered by the Engineer, so as not to cause any inconvenience to the
public traffic finding which in view of public safety and traffic convenience. The Corporation shall carry
out the work by any other agency at the contractor’s risk and cost. if the instructions are not complied
within 7 days from the date of order to cart the surplus materials and clear the site, the said work shall be
carried out by the Municipal Corporation at the risk and cost of the contractor and no claim or dispute
shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same
shall be carried out by the contractor without asking any extra rate. The contractor shall have to cart the
surplus earth after the trenches we will watered and refilled with the sand. The rate of carting including
carting of brick bats, metal, rubble vegetable and garbage, if necessary to clear the road surface.
Mode of measurement:-
The rate shall be for a unit of Cmt basis
5-6 Providing and jointing stoneware pipes incl. excavation upto 2 mt. refilling, transporting
pipes to work site, unloading lowering in trnch such as cementsand, hemp bitumen as
directed, incl. watering the trenches spreading and cartingaway of surplus.
Lowering, laying and jointing stone ware pipes of following diameters with cement joints
in C.M.1:1 proportion in proper position , grade and alignment at all level as directed by
Engineer-in- charge including conveyance from stone to site of work, Jointing material
A)…………do…….(b)10 cm dia line
B)………do ............. (c)15 cm dia line, 20cm line
C)……………do….(c)23 cm dia line
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved quality make
and shall be brought on site after approval. (The pipes shall be laid in grade as per instruction.)Contractor
shall have to procure bills for standard pipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarn dipped in
hot asphalt and caulking tools. The hydraulic pressure test shall be given to the contractor for testing pipes
and jointing. No trenches shall be filled without the approval of the engineer in charge.
The rate of the pipe work are including of excavation and refilling. The excavation etc. shall be
done as follows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on the plan and
section. In all sorts of soil including old masonary, asphalt roads and wet excavation.
The sewer excavation shall be commenced at the down stream end of the sewer and be
continued up to the gradient as directed. The trench shall not open more than 60 mts. in advance of the
completed sewer only when directed by the engineer in charge looking to the progress of the work in
obtaining the formation of the bottom of the trenches the usual methods of using sign rails and boning
roads shall be adopted during the whole of the process. The centre line of uniform height shall be carried
clearly on each rail. The depth of the excavation and invert of the sewer shall be checked by means of
boning road of approved length and also by straight edge. The bed of the trench shall be well rammed
before starting laying of sewer lines and cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable timbering of
shorting work looking to the nature of the soil near big or important structure, the sides of the trenches
shall be closely and securely timbered, if any settlement of the buildings in anticipated the timbering shall
be left in the ground. The various materials excavated shall be separately stacked so that in refilling that
may be relayed on the same order as before and least possible damage shall be done carpet on the public
roads and private properties. Surface covering consisting of asphalt carpet shall be kept on side and
preserved for reinstatement. The excavated earth shall not be heaped near the trenches so as to caused
unnecessary obstruction along the trenches during inspection trenches etc. shall be tunneled under only as
necessary. The side of the trenches shall be nearly vertical and plumb and red light shall be placed at each
end at intervals and instructions and further protected by rope fence. Necessary caution boards shall also
be created and as directed by the engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not be placed
nearer than three meters from the outer edge of the excavated trenches. The utmost shall have to be taken
in refilling the trenches so that no damage may be done no sewer, no lump shall be allowed to be put
around the sewer. The ramming of the filling shall be done and well watered.
The surplus earth shall be removed directed within 30 meters lead. The measurements of the
work shall be exact length and width of the trenches as specified or as per City Engineer instruction and
depth shall be measured vertical as per section up to invert or the pipeline. The City Engineer reserves the
right of extra excavation on either side if considers necessary for the safety of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directed before any
concrete is in dia. In case the excavation is done deeper than required no filling shall be allowed to bring
the formation to proper level but contractor shall have to lay cement or lime concrete of filing or other
acceptable materials as directed by the City Engineer at contractor own cost so as to come to proper
formation. In case bad formations are met with the work shall have to be done as per instruction of City
Engineer. Necessary arrangements for watering trenches must be provided by contractor and without
proper watering trenches will not be allowed to be filed to further Contractor shall have to make
arrangement for access to invert of the sewer and for inspection of the work as ordered by the engineer. If
it is required to shift or after the alignment section of diameter of the pipe the contractor shall carry out
the altered work at the rates quoted by him for the original work for items and contractor shall not claim
any expenses due to the changes made.
In no case work shall be done at night or no Sundays & other holidays and during the recess time
except in and other holiday the case of bad grounds such as running sand where the work must be executed
vigorous day night without interruption when so ordered by the engineer. All existing water pipe storm
drains sewer line railway track, electric cables etc. which do not in the opinion of engineer required to be
changed in location shall be supported and protected from injury by the contractor. The contractor shall be
liable to pay all damages to water-pipe, drains electric and telephone cable and to private property during
the execution of this contract and the same will be recovered from the running bills or the deposit of work
change location of any existing sewers drains etc. not otherwise from in these specification the contractor
shall do the work of making such change and the work shall be paid for as extra work. All places utility
etc. shall be kept accessible for use.
No extra payment shall be made for land sides and side stops done without prior approval of the engineer
The excavation of trenches shall be done foot wider on each side of the pipe than the inside
diameter of the sewer in case of depth excavation exceeding 3 meters above invert, one feet wider
excavated on either side for the upper depth above 3 meters shall be allowed and paid for. Wherever
natural soil demands winder excavation the mentioned above the same shall be given after approval of
City Engineer. The rate for excavation for easy jointing and caulking nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the lines
are checked and approved of and order given by the Engineer in charge. The refilling shall be
accompanied by through watering for layers of 0.50 mtrs. Further refilling shall be done thereafter and
process should be repeated till trenches are completely refilled. Temping and ramming with rammers
shall have to be done at all place of
important work where ordered by Engineer in charge. After order to refill the trench is give the
trenches shall have to be refilled within 4 days with complete watering. If the contractor fails to do
watering satisfactory corporation shall get it done at the risk and cost of the contractor with or without
giving any notice and the expenses incurred in doing so recovered from the contractor either in cost or
from his payment through bills.
The rate shall be per meter basis.
The rate per Cmt. in this item shall be paid extra addition to the rate for excavation
Item No. Providing and supplying ISI Standard RCC pipes (of sulphate resisting Cement )in
7-8 standard lengths of following class and diameter suitable for rubber ring joints (socket
and spigot) including all taxes,insurance, transportation,treight charges,octroi,inspection
charges, loading,unloading, conveyance to departmental stores, stacking etc. complete
Class NP3 Test pressure 0.7 Kg/Sq.Cm
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in proper
position , grade and alignment at all level as directed by Engineer-in- charge including
conveyance from stone to site of work, labour giving hydraulic testing as per ISI code.
(a) 300 mm internal diameter B) 450 Mm Internal Diameter (C)500 Mm Internal
Diameter, (D)600 Mm Internal Diameter (E)900 Mm Internal Diameter (F) 1000 Mm Internal
Diameter (G)1200 Mm Internal Diameter
The RCC pipes shall be procured as per ISS for B Class type specifications using best materials, first class
workmanship as per IS 458/1971 of NP2 / NP3 class as per specified in the tender item. The proportion of
concrete shall be one part of cement to 2 parts sand and 4 parts of black trap agg. mix. of suitable size to
as to produce uniform concrete through out thickness of the pipes.
Reinforcement in form of bars straight and class wise shall be provided as per IS458 class specifications.
RCC spun pipe collars for the pipes shall be made in the same manner. The internal dia meter of the collar
shall be sufficiently large to allow a perfect joint around the outside of the pipes with cement mortar and
other plastic materials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially prepared formation
or on concrete bed and for the purpose to extra rate shall be given making extra excavation for bed and in
the sides of the trenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in the length. For
each joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned and moistured and the
collar shall be kept in position by means of wedges. Semidry cement mortar of prop. 1:1 shall be forced
into joints and chaucked completely by means of special cutting tools until the whole space is full. The
mortar shall be sprayed around the collar joints so as to completely encase the joint.
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and if he has any
doubt as to their soundness be may required the contractors to cut open and clear away the cement of any
joint that he may select and to make good the same at their expenses provided that, unless some defect be
found, they shall be required to open more than one joints in 18mt (60’) of pipe, though if defect be found
the Engineer direct them to open as many joints as he may deem necessary, the joints made one day will
not as a rule, be inspected until the following day and the cement may has sufficient time to set well
before being covered up.
Trenches shall not be filled until alignment and levels are examined by the Engineer or his subordinates
and the permission for refilling is granted.
The RCC pipes shall be manufacturers as per IS for B class pipes specifications using best materials first
class workmanship as per IS 458/1971.and latest IS code for R.C.C. pipe line of NP3 class.
The proportion of concrete shall be one part of cement to 2 parts of sand and 2parts of black trap agg. Mix
of suitable size so as to producing firm concrete thought thickness of the pipes.
Reinforcement on form of bars straight & cross wise shall be provided as per IS 458/ class specifications.
RCC spun pipes collars for the pipes shall be made in same manner the internal diameter of the collar
shall be sufficiently large to allow a perfect joint around the outside of the pipes with cement mortar and
other plastic materials.
Any damaged or cracked carefully into trenches and shall be made to rest evenly on specially prepared
formation and for the purpose no extra rate shall be given for claming such hollows in bends and in the
sides of the trenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in the length for
each joint diped is not asphalt after the joint has been properly cleaned & moisture and collar kept in
position by means of wedges, semi-dry cement mortar prop. 1 ;1 shall be faced into it and caulked
completely by means of specials caulking tools until the whole space in full. The
mortar shall be sprayed off in the form of filler around the pipes.
The R.C.C. NP3 pipe line shall run in perfect straight lines from manhole and shall be exactly to gradient.
M/S shall be in RMT.
Trenches shall not be filled in until the line has been tested and alignment and levels are examined by the
Engineer or his subordinates and the permission for refilling is granted.
Contractor shall be held responsible for any damage or defect to the pipe line in satisfactory working of
the same for 12months after it is put into commission, contractor must satisfy IS 458/1971 and
IS783/1959 with reference to RCC pipe.
Item No.9 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for
foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3,
finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of chamber
seat cover etc..completed.
(A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia
(B) 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=20
(C) 0.75 x 0.75 mt. size Inside Clear, Depth from 0.0 to1.20 meter for pipe dia
(a) Excavation : This be done as specification in Item No.
(b) Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall
comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing and
mixed properly on wooden or specially propared platform until every part of the brockbats is
sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface.
The surface must be kept damp during and after consolidation & in laying consecutive layer the lower
coars should be well watered & mode lough be for the next is placed.
(c) Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in
P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got approved by
the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement
mortar for the brick work shall be one parts of cement to six part of sand every brick well soaked in water
is required to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm
If after removal of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall
be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan
working to the proper dimension & as directing by the officer in charge from the time to time bricks
should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement
mortar shall be prepared in special iron pans and mixed in quantites as required using measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case may be all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonary should be constructed in proper workmanship like
manner with joints plunb etc. to conform with general specification No.45 P.W.D hand book. The face
work should be neatly finished. The work shall be keptwaterd for work at least after date of completion.
(d) C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm.
well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished
with neat cement as per instruction the channel shall be half round and as per drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of the
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble.
The maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to
the channel of manhole/inspection chamber. The minimum internal sizes of manhole/inspection chamber
shall be as per the respective item of work. The manhole/inspection chamber shall be constructed as per
the detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall be
constructed of such thickness as shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).
The channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain. Above the
horizontal diameter, the sides shall be extended vertically to the same level as the crown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channels shall also be similarly
constructed with respect to the benching out at their junction with the main channel as appropriate fall
suitable rounded off in the direction of flow in the main channel shall be given. The channel at the
bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers over
mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two
vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below
the manhole/ inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and frames shall be cleanly cast and they shall be free
from air and sand holes and from clod shuts. They shall be neatly dressed and carefully trimmed. All
castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers shall have
a raised chequered design on the top surface to provide an adequered nonslip grip. Cover shall be capable
of easy opening and closing and it shall be fitted in the frame in workmanship like manner. The cover shall
be gas tight and water tight. The size of covers specified shall be considered as the clear internal
dimensions of the frame. Covers and frames shall be coated with a black bituminous composition. The
coating shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall be firmly
embeded to correct alignment and level in cement concrete on the top of the masonry. The item shall be
executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed
by engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation,
No.10-11 Refilling, Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of
thickness 10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) In
Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm
C/C At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness
C.M.,Including Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm
dia.)But Excluding The Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X
Meter (Inside Clear, M.H. length should be parallel to the flow)
1) 1.00 to 2.00 meter depth, (Slab at Ground level) (for pipe dia <=230 mm)
2) 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) (for pipe dia <=300
(a) Excavation : This be done as specification in Item No.
(b) Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall
comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany impurities
and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing
and mixed properly on wooden or specially propared platform until every part of the
brockbats is sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface.
The surface must be kept damp during and after consolidation & in laying consecutive layer the lower
coars should be well watered & mode lough be for the next is placed.
(c) Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in
P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got approved by
the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement
mortar for the brick work shall be one parts of cement to six part of sand every brick well soaked in water
is required to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm
If after removal of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall
be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan
working to the proper dimension & as directing by the officer in charge from the time to time bricks
should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement
mortar shall be prepared in special iron pans and mixed in quantites as required using measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case may be all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonary should be constructed in proper workmanship like
manner with joints plunb etc. to conform with general specification No.45 P.W.D hand book. The face
work should be neatly finished. The work shall be keptwaterd for work at least after date of completion.
(d) C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm.
well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished
with neat cement as per instruction the channel shall be half round and as per drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of the channel.
(e) Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble.
The maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to
the channel of manhole/inspection chamber. The minimum internal sizes of manhole/inspection chamber
shall be as per the respective item of work. The manhole/inspection chamber shall be constructed as per
the detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall be
constructed of such thickness as shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3). The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain. Above the
horizontal diameter, the sides shall be extended vertically to the same level as the crown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channels shall also be similarly
constructed with respect to the benching out at their junction with the main channel as appropriate fall
suitable rounded off in the direction of flow in the main channel shall be given. The channel at the
bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers over
mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two
vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below
the manhole/ inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and
frames shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.
They shall be neatly dressed and carefully trimmed. All castings shall be free from voids whether due to
shrinkage, gas inclusion or other causes. Covers shall have a raised chequered design on the top surface to
provide an adequered nonslip grip. Cover shall be capable of easy opening and closing and it shall be
fitted in the frame in workmanship like manner. The cover shall be gas tight and water tight. The size of
covers specified shall be considered as the clear internal dimensions of the frame. Covers and frames shall
be coated with a black bituminous composition. The coating shall be smooth and tenaceous. The frame of
manhole/inspection chamber cover shall be firmly embeded to correct alignment and level in cement
concrete on the top of the masonry. The item shall be executed as per the detailed drawing and as directed
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed
by engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item Constructing Slab type M.H. Chamber of the following size including excavation, refilling,
No.12-13- brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
14 10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) in CM 1:3,
finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at
cm staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M., including
Cantering & reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding
the cost of Manhole seat cover etc..completed. of Size 1.00 X 1.40 meter (Inside Clear,
M.H. length should be parallel to the flow, for pipe dia <= 800 mm)
1) 1.00 to 2.00 meter depth, (Slab at Ground level)
2) 2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.)
3) 3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From G.L.)
4) 5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From G.L.)
5) 7.00 to 8.00 meter depth, (Slab at below 1.00 mt. From G.L.)
(a)Excavation : This be done as specification in Item No.
(b) Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall
comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing and
mixed properly on wooden or specially propared platform until every part of the brockbats is
sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface.
The surface must be kept damp during and after consolidation & in laying consecutive layer the lower
coars should be well watered & mode lough be for the next is placed.
(c) Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in
P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got approved by
the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement
mortar for the brick work shall be one parts of cement to six part of sand every brick well soaked in water
is required to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm
If after removal of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall
be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan
working to the proper dimension & as directing by the officer in charge from the time to time bricks
should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement
mortar shall be prepared in special iron pans and mixed in quantites as required using measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case may be all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonary should be constructed in proper workmanship like
manner with joints plunb etc. to conform with general specification No.45 P.W.D hand book. The face
work should be neatly finished. The work shall be keptwaterd for work at least after date of completion.
(d) C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm.
well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished
with neat cement as per instruction the channel shall be half round and as per drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of the channel.
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble.
The maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to
the channel of manhole/inspection chamber. The minimum internal sizes of manhole/inspection chamber
shall be as per the respective item of work. The manhole/inspection chamber shall be constructed as per
the detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall be
constructed of such thickness as shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3). The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain. Above the
horizontal diameter, the sides shall be extended vertically to the same level as the crown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channels shall also be similarly
constructed with respect to the benching out at their junction with the main channel as appropriate fall
suitable rounded off in the direction of flow in the main channel shall be given. The channel at the
bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers over
mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two
vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below
the manhole/ inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and frames shall be cleanly cast and they shall be free
from air and sand holes and from clod shuts. They shall be neatly dressed and carefully trimmed. All
castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers shall have
a raised chequered design on the top surface to provide an adequered nonslip grip. Cover shall be capable
of easy opening and closing and it shall be fitted in the frame in workmanship like manner. The cover shall
be gas tight and water tight. The size of covers specified shall be considered as the clear internal
dimensions of the frame. Covers and frames shall be coated with a black bituminous composition. The
coating shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall be firmly
embeded to correct alignment and level in cement concrete on the top of the masonry. The item shall be
executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed
by engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item Dismantling of existing Arch type manhole up to Arch and then Const. Slab type manhole
No.15 of following size incl. excavation, refilling and & finished 15 mm thick cement plaster
inside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered
in masonry CM 1:5, incl. cost of RCC Slab in CC 1:1.5:3, including Cantering &
reinforcement as directed by engineer in charge. Rate includes carting of debris and
1) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single
jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at Ground level)
2) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single
jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab at below
3) 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement
(double jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
4) 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement
(double jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab at
below 1.00 mt. From G.L.)
5) 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement
(double jalli at 15 C.M. c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab at
below 1.00 mt. From G.L.)
(a) Excavation : This be done as specification in Item No.
(b) Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall
comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing and
mixed properly on wooden or specially propared platform until every part of the brockbats is
sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface.
The surface must be kept damp during and after consolidation & in laying consecutive layer the lower
coars should be well watered & mode lough be for the next is placed.
(c) Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in
P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got approved by
the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement
mortar for the brick work shall be one parts of cement to six part of sand every brick well soaked in water
is required to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm
If after removal of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall
be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan
working to the proper dimension & as directing by the officer in charge from the time to time bricks
should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement
mortar shall be prepared in special iron pans and mixed in quantites as required using measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case may be all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonary should be constructed in proper workmanship like
manner with joints plunb etc. to conform with general specification No.45 P.W.D hand book. The face
work should be neatly finished. The work shall be keptwaterd for work at least after date of completion.
(d) C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm.
well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished
with neat cement as per instruction the channel shall be half round and as per drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of the channel.
(e) Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble.
The maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be
fixed at the same level and necessary slope given to the channel of manhole/inspection
chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the respective item
of work. The manhole/inspection chamber shall be constructed as per the detailed drawings and as
directed by Engineer. The bed concrete and the brick masonry shall be constructed of such thickness as
shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3). The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain. Above the
horizontal diameter, the sides shall be extended vertically to the same level as the crown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channels shall also be similarly
constructed with respect to the benching out at their junction with the main channel as appropriate fall
suitable rounded off in the direction of flow in the main channel shall be given. The channel at the
bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers over
mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two
vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below
the manhole/ inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and frames shall be cleanly cast and they shall be free
from air and sand holes and from clod shuts. They shall be neatly dressed and carefully trimmed. All
castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers shall have
a raised chequered design on the top surface to provide an adequered nonslip grip. Cover shall be capable
of easy opening and closing and it shall be fitted in the frame in workmanship like manner. The cover shall
be gas tight and water tight. The size of covers specified shall be considered as the clear internal
dimensions of the frame. Covers and frames shall be coated with a black bituminous composition. The
coating shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall be firmly
embeded to correct alignment and level in cement concrete on the top of the masonry. The item shall be
executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed
by engineer in charge or Additional City Engineer (south zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item No. Provdg. & laying S.W. Gully trap with brick masonry chamber & water tight
16 G.T.Stone including fixing of cover Square mouth trap 100 mm x100 mm size P-Trap
Constructing Gully Trap Chamber With Masonry In Cement Mortar 1:5 & Plastering In Cement
Mortar 1:3 Using G.T. Stone Incl. Fixing Cover Etc. Completed As Directed.
Mode of measurement:
The rate shall be for a unit of Nos Basis
Item No. Making connection to the ex. M.H.in running sewer incl. Dewatering and other
17 required machinery etc. of following dia pipes at any convenient time. All damaged work
shall be well repaired as per instructions. etc..complete.
Rate includes connection in the sewer line at any convenient time when the load on the drainage line in
less. All damaged work shall be well repaired as per instruction of officer in charge. Proposed R.C. C.
line should be connected with the existing M.H. as directed. Holes made in the well of existing M.H.
should be finished smooth and in circular shape as directed. Rate also includes making new channel or
repairing existing damaged channel if instructed. Rate is inclusive of watering etc. as directed.
Mode of measurement:
The rate shall be for a unit of Nos Basis
Item No. Cutting the pipes of following dia coming in the new M.H.in running sewer including
18 cutting bars, including removing debris /silt from the M.H. and carting at a suitable
distance etc..complete as directed. No payment for M.H. work will be made until pipe is
not cut completely in all respect.
ng in the new M.H. in running sewer of any dia pipes at any convenient time when M.H. is found empty all
damage work shall be well repair instruetions etc. comp.
material shall be cut as pes requirement to Cutting the pipe in existing manhole reinforcement bars shall
also have to be cut in existing manhole as per requirement and making good the same. the dis mental
materials shall be carried ti places at all lead as directed by engineer in charge If directed the work shall
have to be done at night the measurement shall be as per nos
Mode of measurement:
he rate shall be for a unit of Nos Basis
Item No. Repairing damaged M.H. incl. removing damaged brick and repairing by masonry in C.M.
19-20 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and M.H. and carting the same as directed.
A)………………do………………. Up to 0.15 mt. ( @ Two coarse)
C) ………………do…………………Up to 0.65 mt. ( @ Seven coarse)
Repairing damaged I.C./ Raisin removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing
chamber sheet cover, removing the debris from chamber and carting the same as
Required level shall be achieved in brick work as specified including plaster, the thickness of joints shall
not exceed 10 mm (3/9”). In no case the frame shall be supported by chips or broken brick or asphalt mix.
All frame of manholes, and chambers etc. shall be kept flush with the general surface of an
asphalt road/concrete pavement. The frame shall be bedded in cement mortar on the brick work with
splayed filler all around.
Water: Gully frames being on the edge of road shall be fixed to the correct road level at its upper end and
the slope should be such it must be about (12 mm) (1/2”) lower than water table.
A concrete pavement should be case around the frames and covers of man-holes, chambers etc.
in case of asphlatic road.
The space around circular frame and covers shall be fully paved with c.c. (1:2:4) as specified and
directed. The pavement shall be at least 8 mm (3”) wider than the outer most edge of the circular frame no
pavement will be made of this pavement under the item of cement concrete.
The space to be paved around hydrant or sluice boxes shall be 1.6 m x 1.5 m (5’ x 5’) in external
measurement and in case if gas siphon or chamber 91 cm x 61 cm (3’ x 2’) the longer dimension being
along the direction of the main.
In case of rectangular frame cover it shall paved as directed by Engineer with 1:2:4 C.C. No
payment will be made for the pavement should be at least 8 cm (3”) wider than the outer most edge of the
After removing the top portion of the manholes, the proper brick masonry layer with c.m. (1:4)
should be constructed for proper bondage with old masonry and 8 cms thick PCC work (1:2:4) should be
laid on the top of brick layer an up to the bottom of the seat. After fixing the seat the manhole should be
properly leveled with road level.
Filling with cement concrete the spaces around the manholes, chambers, etc. shall be clean
within 48 hours of concreting day.
M/S shall be given on No basis.
Item No. RCC Precast M.H.Frame & Cover Manufacture, supply & Delivery at store or at side of
21 work Precast RCC M200 Frame & Cover Suitable to drainage M.H. and as per type design
& Drawing including cost of reinforcement M.S. Angles or Flat , cutting mold work etc.
Frame Suitable for 50 Cm opening of MH
Cover Suitable for 50Cm Opening Of MH
Frame Suitable for 50 Cm opening of MH
Cover Suitable for 50Cm Opening Of MH
3) House connection Chamber Light Duty
Mode of measurement:-
The rate shall be for a unit of one number basis
Item No. Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match
22 exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for
days etc. complete as directed. M.H. seat cover will be supplied byA.M.C.(from any
Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match
exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc.
complete as directed. M.H. seat cover will be supplied byA.M.C.(from any store)
Mode of measurement:-
The rate shall be for a unit of one number basis
Item No. Providing Kachha Of Pakka Dummy In The Following Dia Pipes And Removing The
23 Same After The Connection Of The Work As Directed.
Providing kachcha or pakka dummy in the following dia pipes and removing the same after the
connecting of the work as per instruction of engineer in charge. If kachcha or pakka dummy is not
removed by the contractor then the penalty shall be laid as per municipal rules or
derived by the municipal corporation officer's in-charge.
Measurements shall be given on no. basis.
Item No. Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for existing
24 EHD-35 FRC MH cover, rate also incl. loading, unloading and fixing the frame in line and
level to match exisisting road level in CC 1:2:4 and finishing smooth, watering and
protecting for 7 days etc. complete as per instruction by engg. in charge.
Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for existing EHD-35 FRC
MH cover, rate also incl. loading, unloading and fixing the frame in line and level to match exisisting road
level in CC 1:2:4 and finishing smooth, watering and protecting for 7 days etc. complete as per instruction
by engg. in charge.
Measurements shall be given on Kg basis.
Item No. Raising of Existing manhole item includes,cutting of existing road surround by Manhole
25 by diamond cutter machine dismantling of road in confined area by breaker machine and
carting of dismantal material.item also included necessarey brick work to raise the
manhole at road level in CM 1:3 item also included fixing of Manhole frame at exact road
level by using MaserEmaco S 488 trowable fibre reinforced thixotropic repair mortal
material Laying of concrete made form Master Emaco 5 346 flowable micro concrete
material in desired thickness and laying of hot bitumanous material in Upper layer and
compaction of hot bitumanious material by palte compactor machine .Rate also included
necessary plaster at inside of manhole in CM 1:3 in 20 MM thickness on raised brickwork.
Raising of Existing manhole item includes,cutting of existing road surround by Manhole by
diamond cutter machine dismantling of road in confined area by breaker machine and carting of dismantal
material.item also included necessarey brick work to raise the manhole at road level in CM 1:3 item also
included fixing of Manhole frame at exact road level by using MaserEmaco S 488 trowable fibre
reinforced thixotropic repair mortal material Laying of concrete made form Master Emaco 5 346 flowable
micro concrete material in desired thickness and laying of hot bitumanous material in Upper layer and
compaction of hot bitumanious material by palte compactor machine .Rate also included necessary plaster
at inside of manhole in CM 1:3 in 20 MM thickness on raised brickwork.
Measurements shall be given on no. basis.
Item No. Brickwork using common burnt clay building bricks having crushing strength
26 notless than 35kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5 (1-
Cement:5-finesand) (B) Conventional (upto 10 ton)
The rate shall be for a unit of Cu.mt Basis.
Item No. Supplying, labour for break down repairing work for activities like excavation, disliting,
27 removing debris from trench back filling etc. comp. as directed by Eng.in charge.
1) Mazdoor at day /Night
2) Makadam/ supervision at day / Night
Mode of measurement:
The rate shall be for a unit of No Basis.
Item No. Providing Dead Cantering using good quality Country Wood Planks, wall Plate of
28 required thickness and size including placing the nece. supports of reqd. size,
nailing, fixing with mortar, levelling. All specification for dead centring as per
standard engg. practice etc. comp. as directed.
The rate shall be for a unit of Smt. Basis.
Item No. Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single or
29 half brick walls for interior plastering upto floor two level and finished even and smooth in
(i) Cement mortar 1:3 (1- cement:3-sand) finishing with a floating coat of neat cement
Water M-1. The Cement mortar of proportion 1:3 shall conform to M-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound. These shall
be properly examined before erection and use Stage scaffolding shall be provided for ceiling plaster,
which shall be independent of the walls.
Preparation of back-ground :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence and other
foreign matter by water or by brushing. Smooth surface shall be roughened by wire brushing if it is not
hard and by racking if it is hard. In case of concrete surface, if a chemical retarder has been applied to the
form work, the surface shall be roughened by wire brushing and all the resulting dust and loose particles
cleaned off and care shall be taken that none of the retarder is left on the surface. Trimming of projections
on brick/concrete surface where necessary shall be carried out to get an even surface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period
before carrying out the plaster work.
The work shall not be soaked but only damped evenly before applying the plaster. If the surface becomes
dry such area shall be moistened again.
For external plaster, the plastering operation shall be started from top floor and carried downwards. For
internal plaster, the plastering operations may be started wherever the building frame and cladding work
are ready and the temporary supporting ceiling resting on the wall of the floor have been removed, Ceiling
plaster shall be completed before starting plaster to walls.
Applications of Plaster :
The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than 2 metre
intervals over the entire surface to serve as gauge. The surfaces of these gauges shall be truly inplane of
the finished plastered surface. The mortar shall then be applied in uniform surface slightly more than the
specified thickness, then brought to a true surface by working a wooden straight edge reaching across the
gauges with small upward and sideways movement at a time. Finally, the surface shall be finished off true
with a trowel or wooden float according as a smooth or a sandy granular texture is required. Excessive
trowelling or overworking the float shall be avoided. All corners, arrises, angles and junctions be truly
vertical or horizontal as the case may be and shall be carefully finished. Rounding or chamfering corners,
arrises junctions etc. shall be carried out with proper templates to the size required.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which is
partially set shall be rejected and removed forthwith from the site :
In suspending the work at the end of the day, the plaster shall be left out clean to the line both horizontally
and vertically. When recommending the plaster, the edges of the old work shall be scraped clean and
wetted with cement putty before plaster is applied to the adjacent area to enable the two to properly joint
together. Plastering work shall be closed at the end of the day on the body of the wall and nearer than
cm. To any corners or arrises. Horizontal joints in plasterwork shall not also occur on parapet tops and
copings as these invariably lead to leakage. No portion of the surface shall be left out initially to be packed
Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of 7 days.
Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided
and only as much water as can be readily absorbed shall be used excessive evaporation on the sunny or
windward side of building in hot air or dry weather shall be prevented by handling mattings or gunny bags
on the outside of the plaster and keeping them wet.
Mode of measurement & payment :
The rate shall include the cost of all materials, labour and scaffolding etc, involved in the operations
described under workmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth or height
shall be measured correct to a centimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in brick
work, stone work etc. or space between laths. Thickness of plaster shall be average thickness with
minimum 10 mm. at any point on this surface.
This item includes plastering upto floor two level.
The measurement of wall plastering shall be taken between the walls or partition (dimensions before
plastering being taken) for length and from the top of floor or skirting to ceiling for height. Depth of cover
of cornices if any shall be deducted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured separately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints, beams,
posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings exceeding 0.5 sq.mt. and
not exceeding 3.0 sq. mt. in each area deductions and additions shall be made in the following manner :
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq. mt. each
and no addition shall be made for reveals, jambs, soffits, sills etc. of these opening for finish to plaster
around ends of joints, beams, posts etc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as follows
and no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
When both faces of all wall are plastered with same plaster, deduction shall be
made for one face only.
When two faces of wall are plastered with different types of plasters or if
one faces is plastered and the other pointed, deductions shall be made from the plaster or pointing on the
side of frame for door, window etc. on which width or reveals is less than that on the other side but no
deductions shall be made on the other side. Where width of reveals on both faces of all are equal,
deductions of 50% of area of opening on each face shall be made from area of plaster and/or pointing as
the case may be.
For openings having door frames equal to projecting beyond the thickness of wall, full deduction for
opening shall be made from each plastered face of the wall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs, soffits
and sills shall be measured.
The rate shall be for a unit of one sq. metre. finishing
with a floating coat of net cement slurry. Materials
& Workmanship :
This work is only of providing smooth cement finish with floating coat of neat cement slurry.
The coat of cement and fine sand mortar of proportion 1:1 (1.5 mm. thick about) shall be applied to the
plastered surface with a trowel to provide uniform texture while the base coast is still plastic.
In any continuous face of wall the finishing treatment should be carried out continuously and day to day
braked made to coincide with architectural breaks in order to avoid unsightly junctions.
Curing : All the plaster work shall be kept damp continuously for a period of 7 days.
Mode of measurements & payment :
The payment shall be made for a unit of 1.0 sq. mt. of work done over and above the finishing of work of
The relevant specifications of item of base coat shall be followed for measurements and payment.
The rate shall be for a unit of one sq. metre.
Item No. Supplying cutting, bending, binding and placing in position steel as per plan and
design and as per IS 2502 including cost of steel and binding wire for reservoirs/
structuresonly including lift up to 6 meter height or depth below GL for all
diameters (GWSSB SOR 2021-22) TMT bars Fe-415 grade
for alldiameters
The rate shall be for a unit of MT.
Item No. Provdg. & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
31 aggregates 20 mm nominal size) and curing complete excluding cost of form work and
reinforcement for reinforced concrete work in
1.1 Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone
aggregate 20 mm. nominal size shall conform to M-12.Cement concrete 1:2:4 proportion
measured by volume shall conform to relevant specification or ordinary grade 1:2:4 concrete.
2.0 Workmanship :
2.1 The cement concrete flooring of 50 mm. thick (average) is to be laid as per the site condition.
The concrete shall be mixed in a mechanical mixer at the work. Hand mixer may however be
allowed for smaller quantities of work and in case of failure of machines or as permitted by the
engineer-in-charge. It shall carried out on a water tight platform and care shall be taken to ensure
that mixing is continued until the mass is uniform in colour and consistency. However in such
cases 10% more cement than otherwise required shall have to be used without any cost. The
mechanical mixing shall be done for a period of 1/2 to 2 minutes. The quantity of water shall be
thus sufficient of produce a dense concrete required workability for the purpose. Flooring of
specified thickness shall be laid in accordance with approved pattern or as directed. Finishing
operation shall start shortly after the cessation of beating and shall be spread over a period of one
to six hours depending upon the temperature and atmospheric conditions. The surface shall be
left for some time till moisture disappears from it. Fresh quantity of cement shall be mixed with
water to form a thick slurry and spread over the surface while the concrete is still green. Use of
dry cement or cement and sand mixture sprinkled on this surface to stiffen the concrete or absorb
excessive moisture shall not be permitted. The cement slurry shall than be properly paste twice
by means of iron flats, once, when the slurry is applied and the second time when cement starts
setting and finished smooth. The surface shall be marked with string or B.R.C. fabric jali to make
the surface non slippery as and when directed. The junction of floors with wall plaster dado or
skirting shall be
rounded where so required upto 25 mm. radius. Flooring in lavatories and bath rooms shall be
laid after fixing of water closet and squatting pans and floor traps, which shall be
plugged while laying the floors and opened after the floors, are completed. Any damage, done to
water supply sanitary fittings during the execution of work shall be mage good.
2.2 After the final set, the concrete shall be kept continuously wet, if required ponding for a period of
not less than 7 days from the date of placement.
2.3 The form work shall be provided if necessary as directed by the engineer in charge. Concreting
shall be done as per alternate bay method with necessary centering wither by mastic or cement
mortar as directed.
3.0 Mode of measurement & payment :
3.1 The rate shall include the cost of all material and labour involved in all the operations described
above. No deduction shall be made or extra paid for any opening upto 0.1 sq. metre in area in the
floor, nothing extra shall be paid for laying the floor at different levels in the same room or the
The rate shall be for unit of one Cmt
Item No. Providing and installation of barricading with retro-reflective paint/ film/ tapes (Minimum
32 3.0Mt. height) as specified in the drawing & specifications for the construction of road
work, along with necessary diversion arrangement for existing traffic movement in an
unobstructed condition, all relevant markings, sign boards and illumination as per
relevant MORT&H specification. Precoated galvanised iron profile sheets shall be of
approved make and shade having 0.50 mm (+0.05 %) total coated thickness with zinc
coating 120 grams per sqm as per IS: 277, in 550 mpa steel grade, 5-7 microns epoxy
primer on both side of the sheet and polyester top coat 15-18 microns. Rate to be
inclusive of all materials, fabrication works, paint works for information (retro reflective
paint), foundation works, transportation, loading, unloading, installation, dismantling and
inclusive of all taxes and including the same design for providing openable gates. No
extra rental will be given to the contractor in case of any delays from his part for
construction or due to any valid time limit extensions. Each barricading sheet is to be
numbered with a unique number. The barricading provided shall be retained in position at
site continuously i/c shifting of barricading from one location to another location as many
times as required during the execution of the entire work till its completion. Rate include
its maintenance for damages, painting, all incidentals, labour materials, equipments and
works required to execute the job. The barricading shall not be removed without prior
approval of Engineerin- Charge. (Note :- One time payment shall be made for providing
barricading from start of work till completion of work i/c shifting. The barricading
provided shall remain to be the property of the contractor on completion of the work).
Blinkers are to be installed on the barricading and rate for blinkers will be payable as per
relevant item. Barricading is to be cleaned by means of
Mode of measurements & payment : The
rate shall be for a unit of Rmt
Item No. Barricading the entire break down or excavated area on rental basis using wooden ballies
33 / M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out
side to avoid accident & for smooth traffic diversion & movement including cautionary
board etc. Item also includes for making temporary sufficient nos of lighting arrangement
through out the work with necessary required arrangement. ..The same shall be removed
after completion of work.
Mode of measurements & payment : The
rate shall be for a unit of Rmt
Item No. Manufacturing,and supplaying steel vantilation colums 15 cms dia medium class
34 pipe with 60 x 60 cm 20 mm thick base plate and stiffeners C.I ormamental cap
Kg and necessarey foundation nut bolts with one coat or red lead oxide paint etc as per
drawing and carting to the work site etc.
Mode of measurements & payment : The
rate shall be for a unit of No.
Item No. Labour charges for erecting steel ventilation colums 15 cms dia with ornamental
35 cap safety with the help of reqyuired capicity of hydra crane and base fixed with
necessarey foundation with coat or lead oxide paint and two coat of any approved
colour with 15 cms dia stone ware of RCC pipe connecting with MH including
excavation and jointing as required etc.
Mode of measurements & payment : The
rate shall be for a unit of No.
Item No. Providing and operation dewatering Pump including fuel charges & operator Charges etc.
36 as directed etc. comp. (Shift for Eight Hour) (For Each Pump Set)
Mode of measurements & payment : The
rate shall be for a unit of Shift
Item No. Hiring and operating Mud Pumps incl. Cost of fuel and operator including the cost of
37 to and fro transportation, laying of the delivery hoses as required, lowering and lifting
the pumps as and when required etc. complete. Set Do As Directed. (No payment
should be allowed for non working condition of machinery )
Mode of measurements & payment : The
rate shall be for a unit of HP/Hr.
Item No. Hiring and operating the 20 KV 3 Phase Electric Generator for operating desilting
38 machinery, and lighting and other requirements with Arranging diesel to run the D.G.
Set Do As Directed. 8 Hrs Shift. (No payment should be allowed for non working
condition of machinery )
Mode of measurements & payment : The
rate shall be for a unit of Shift
Item No. Hiring and operating the 60 KV 3 Phase Electric Generator for operating desilting
39 machinery, and lighting and other
requirements with Arranging diesel to run the D.G. Set Do As Directed. 8 Hrs Shift. (No
payment should be allowed for non working condition of machinery ) ( Based on
Previously approved rate by C E sir )
Mode of measurements & payment : The
rate shall be for a unit of Shift
Item No. Providing & Supplying JCB Machine on rental basis in case of emergency situation and
40 break down type work & also during unavoidable condition as per instruction
of engg.incharge , rate includes all nece. shifting, fuel and operating charges and
stacking of useful & non-useful materials separately up to store. (No payment should
be allowed for non working condition of machinery and for pipe line excavation and
The item is for supplying JCB on rent for various construction activities The rate includes various
operational cost such as operating generater/electricity diesel,petrol, operater's salary, etc comp.
when machine is in working condition all precautions shall be taken by contractor to avoid the accident.if
any accident occurs contractor shall be fully resonsible for that. the payment shall be given on hour
basis.No payment shall be given for idle hour and no time shall be counted for carrying machine to site
and from shifting site to site.
the payment shall be given on hour basis.
Item No. Providing & Supplying Hitachi Machine -110 capacity on rental basis in case of
41 emergency situation and break down type work & also during unavoidable condition as
per instruction of engg.incharge , rate includes all nece. shifting, fuel and operating
The item is for supplying Machine rent for various construction activities The rate includes various
operational cost such as operating generater/electricity diesel,petrol, operater's salary, etc comp. when
machine is in working condition all precautions shall be taken by contractor to avoid the accident.if any
accident occurs contractor shall be fully resonsible for that. the payment shall be given on hour basis.No
payment shall be given for idle hour and no time shall be counted for carrying machine to site and from
shifting site to site.
the payment shall be given on hour basis.
Item No. Providing & Supplying Hitachi Machine -200 capacity on rental basis in case of
42 emergency situation and break down type work & also during unavoidable condition as
per instruction of engg.incharge , rate includes all nece. shifting, fuel and operating
The item is for supplying Machine rent for various construction activities The rate includes various
operational cost such as operating generater/electricity diesel,petrol, operater's salary, etc comp. when
machine is in working condition all precautions shall be taken by contractor to avoid the accident.if any
accident occurs contractor shall be fully resonsible for that. the payment shall be given on hour basis.No
payment shall be given for idle hour and no time shall be counted for carrying machine to site and from
shifting site to site.
the payment shall be given on hour basis.
Item No. Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in
43 case of emergency situation and break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate includes all nece. shifting, fuel
and operating charges . (No payment should be allowed for non working condition of
machinery) (Based on central work shop rate )
Mode of measurements & payment :
The rate shall be for a unit of Per 8 hr Shift
Item No. Supplying Electric Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
44 using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and M.H.
work. Allowed only for break down work)
Mode of measurements & payment :
The rate shall be for a unit of Shift
Item No. Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site
45 by using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and M.H.
work. Allowed only for break down work)
Mode of measurements & payment :
The rate shall be for a unit of Hour
Item No. Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver.
46 Mode of measurements & payment : The
rate shall be for a unit of Day
Item No. Hiring of Three wheeler carrier (Chakado/Rixa) considering
47 10 Hrs. as working day hours incl.Driver
Mode of measurements & payment : The
rate shall be for a unit of Day
Item No. Hiring of Three wheeler carrier (Chakado/Rixa) considering
48 10 Hrs. as working day hours incl.Driver
Mode of measurements & payment : The
rate shall be for a unit of No.
Item No. Constructing Bombay Pattern Type Catch Pit of size 0.60 x
49 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with 40 mm thick
IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the catch
pit in the proportion of CM (1:3) with out jali etc. comp. as directed. (As per R.A.
Based on Building SOR 2015-16)
Mode of measurements & payment :
Measurements shall be given on no. basis
Item No. CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc.
50 comp. As directed by engineer in charge. (Based on Central
Mode of measurements & payment : Measurements
shall be given on no. basis
Item No. Demolition incl. stacking of serviceable materials & disposal of unserviceable materials
51 with all lead and lift.
(c) Tiles or Stone flooring (20.23,page 219)
Demolishing work shall be carried out as per instructions given by the Engineer in charge. Demolishing
of stone slab pavement or any other type of paving, proportion of cement or lime, sorting out materials,
carting them up to lead of 50 mts. & Stacking the different materials separately as directed by the
Engineer in charge of work. The work shall be done carefully.
Item No. Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick,
52 M-35 Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath, parking areas, service
lanes and other areas as mentioned in the drawing
/ instruction of engineer in charge. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required grading and specification.
The paver block shall be mechanically compacted. The work of paving
blocks shall be executed in line and level by skill mason of flooring work only. It
should be laid in such a way that the no cutting of the paver block to be
necessary. if cutting of paver block necessary then it should be cut
by machine only and carting. The finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall be compacted and shall be
relaid if necessary. Gravel or such type of materials shall not be allowed for
production. Laying on 5 cms thick sand bedding
Mode of measurements & payment : Measurements
shall be given on Smt. basis
Item No. Provdg. & laying cement concrete 1:5:10 (1 cement
53 : 5 coarse sand : 10 hand broken stone aggregates40 mm nominal size) and
curing completeexcluding cost of form work in.
Mode of measurements & payment : Measurements
shall be given on Cmt. Basis
Item No. Labour work for fixing any kind of paving with cement pointing in CM 1:2,
54 including watering, ramming etc comp. as dir.For pavement I) Laying on Sand
bedding as per requirement to fix the
C.C.Block / Nibhada Stone in Line & Level
Mode of measurements & payment : Measurements
shall be given on Smt. Basis
Item No. Labour work for reinstament or asphalt pavment covering excvation watering
55 consoldation resoiling meating with the activity of teackcoat including carting the
mix from the nearest store pacting it with convayance charge of excavation
earth etc.comp as directed..
Mode of measurements & payment : Measurements
shall be given on Smt. Basis
Item No. Providing, laying, spreading and compacting gradedstone aggregate to wet mix macadam
56 specificationincluding premixing the Material with water at OMCin mechanical mix plant
carriage ofmixed Materialby tipper to site, laying inuniform layers in subbase/ base
course on wellprepared surface andcompacting withvibratory roller to achieve thedesired
density as per MoRTH clause
The provision of MORTH Clause 406 shall apply during construction of Wet Mix Macadam. The rate
shall be for a unit of one Cmt
Item No. Supply of graded machine cut black trap stone aggregate (metal) of Sevaliya / Tima
57 or equivalent quality metal of size 25 mm to 40 mm.
Mode of measurements & payment : Measurements
shall be given on Cmt. basis
Item No. Labour work for spreading the metal 85 mm thick in single layer, incl. providing &
58 applying bitumen for semi grouting 2.5 kgs/sqm. & Providing & spreading the
key black trap aggregate of good quality on top at the rate of 0.013 cmt. per sq.m. of
size 18 mm passing in 9.5 mm retain rolling with 10 tonne roller etc. comp. as
Mode of measurements & payment : Measurements
shall be given on Smt. Basis
Item No. Filling in plinth with sand under floors including watering ramming,
59 consolidating and dressing etc. complete.
Mode of measurements & payment : The
rate shall be for a unit of Cmt.
Item No. Providing & Fixing M.S. Structure , grill,gate, elevation element of Decorative pattern with
60 M.S. Channel, flat,medium grade m.s.pipe,square , M S plate with nece.bending to cover
pipe Top or round bars with round heandedbolts,nuts,or by screw. incl. applying one coat
zinc primer and two coat of oil paint etc. comp.
Mode of measurements & payment : The
rate shall be for a unit of Kg.
Item No. Temporary / Permanent Plugging and blocking of sewer line, branch
61 connections and diversion of flows and removal of all plugs etc.
Measurement shall be on No. basis. Contractor shall construct temporary pucca
dummy in main line or branch lines opening in the manhole to close the sewer
flow for de-silting the sewer pipe in working stretch and to divert the sewage flow
by brick massionary or other means in optional pipe.
Contractor shall open the dummy after de-silting work completed and remove all
debries from the manhole.
Rate also includes of line commissioning after de-silting it with if available nearby
freely. If it not available in the near vicinity area freely Contractor himself provide it on his
Item No. This Item includes Provide everything else required for diversion of
62 flow by pumping and / or bypassing and to maintain the sewerage
system functioning normal and managing the flow without any sur-
charging, overflows etc during the De-silting/ rehabilitation works of the
sewer line to the satisfaction of the Engineer in charge of the work.
Measurement shall be considered on Running meter length basis as per
attached abstracted rates.
Item No. Providing and laying in position Ready Mixed M-250 grade concrete for
63 reinforced cement conctere work, using cement content as per approved
Design Mix manufactured in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement
concrete work including pumping of R.M.C. from transit mixer to site of laying, and
curing complete. excluding the cost of centering shuttering finishing and
reinforcement including cost of admixtures in recommended proportions as per IS:
to accelerate/ retard setting of concrete, improve workability without impairing
strength and durability as per direction of the Engineer - in - charge. Without Fly Ash
(Min cement level as per latest IS 456 shall be maintained) (Cement level 450 kg ) (A)
Foundations, footings, Base of columns and Mass concrete.
Concrete grade shall be as designated on drawings. In concrete grade M15, M20, M25 etc. the
number represents the specified characteristic compressive strength of 150 mm cube at 28 days,
expressed in N/sq.mm as per IS : 456. Concrete in the works shall be “Design Mix Concrete”
or “Normal Mix Concrete”. All concrete works of grade M5, M7.5 and M10 shall be
Nominal whereas all other grades, M15 and above, shall be Design Mix Concrete.
For Design Mix Concrete, the mix shall be designed according to IS : 10262 and SP: 23 to
provide the grade of concrete having the required workability and characteristics strength not
less than appropriate values given in IS : 456. The design mix shall in addition be such that it is
cohesive and does not segregate and should result in dense and durable concrete and also capable
of giving the finish as specified. For water retaining structures, the mix shall also result in water-
tight concrete. The Contractor shall exercise great care while designing the concrete mix and
executing the works to achieve the desired result.
Mix design and preliminary tests are not necessary for Nominal mix Concrete. However
works tests shall be carried out as per IS : 456. Proportions for Nominal Mix Concrete and
water / cement ratio may by adopted as per Table 3 of IS : 456. However it will be Contractor’s
sole responsibility to adopt appropriate nominal mix proportions to yield the specified strength.
Mode of measurements & payment : The
rate shall be for a unit of Cmt.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and
Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is
employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child
labour welfare fund. If the employer refuses to deposit then action will be taken for contempt of Supreme Court Judgement and
also will be prosecuted by concerned authority. Because of the breach of any provision of child labour prohibition and
regulation Act 1986 by the Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date
06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining
amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same
shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These
shall form a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be
necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly
filled in by the contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published
by A.M.C through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same
with the tender documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be
entertained under any circumstances.
Clause : 5 Schedule Of Maintanance
Contractor Should have to manage following condition for maintanance work as per Engineer instruction
Sr.no. Mode Of Complaint Required machinory / Labour Remarks
Either Whatsup or Email Required as per site Condition or
3 Engineer Instruction
Complaint Received by higher
Authority / Councilor/ by Public
If Contractor Not Follow Schedule Of Maintanance
1. Whenever a work is allotted by Engineering staff, whether minor or major of part thereof of any amount, the contractor
shall be bound to start the works within 48 hours of intimation of work. Communication done telephonically via SMS
,ViaWhatsapp and through letter /E-mail shall be considered legal and binding for the same.
2. Failure of comply to start the works in 48 hours of intimation as above by contractor the contractor shall be levied
penalty of (1) Rs.1000/-per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for tenders amounting
above 10 Lakhs and upto 30Lakhs), (3) Rs.5000 per day (for all tenders amounting above 30Lakhs).
3. Three times failures by contractor shall make contractor responsible to be blacklisted unless and otherwise justified
properly in writing/binding within 15days of last notice of penalty.
4. The Contractor shall adhere to the maintenance schedule outlined in the tender documents and comply with the
prevailing AMC circulars issued from time to time.
Contractor's Sign Addl.C.E.(westzone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 5.pdf
Download all tender documents and submit your bid