RFP for Data Center Passive and Civil Work for Site One Data Center Site Tier 1 and Six Data Center Sites Tier 2 located across IAAD offices across India
2026_CAG_923578_1
CAGPassiveCivilwork18082026-30
Open Tender
Info. Tech. Services
Item Rate
9, DDU Marg, Office of CAG of India, New Delhi
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
Exempted
25 Aug 2026
25 Aug 2026
9 Sept 2026
25 Aug 2026
8 Sept 2026
25 Aug 2026
Bill of Quantities (BOQ) – Data Center Passive & Civil Work
Tender No.: CAG/Passive & Civil work/18082026-30 | The Comptroller & Auditor General of India
Instructions to Bidders:
1. This BOQ reflects a standard Tier-wise specification: 1 (One) Tier-1 site and 6 (Six) Tier-2 sites across IAAD (Indian Audit & Accounts Department) offices in India. Exact site locations shall be intimated by CAG at the time of order placement. The BOQ, specifications, and quantities are identical across all 6 Tier-2 sites.
2. There are two BOQ sheets: "Tier 1 - Site" (for the single Tier-1 site) and "Tier 2 - Standard Site" (the common BOQ applicable to each of the 6 Tier-2 sites across IAAD offices in India).
3. Bidders should quote the rate for ONE Tier-2 site on the "Tier 2 - Standard Site" sheet. The Summary sheet automatically multiplies this per-site total by 6 to arrive at the combined value for all six Tier-2 sites — do NOT enter a pre-multiplied total.
4. On each BOQ sheet, item rows shown in BOLD (Sl.No. A, B, C, ...) are the primary billable line items. Sub-rows (i., ii., a., b., ...) are the specification / inclusion breakdown of the item above them and are shown for technical reference.
5. Bidders should enter the Unit Rate (Rs.) only in the yellow-highlighted "Unit Rate (Rs.)" cells provided against each billable item (Unit + Qty populated). The Amount column will calculate automatically.
6. All rates quoted shall be EXCLUSIVE of GST. Applicable GST must be entered separately in the "GST %" cell at the bottom of each BOQ sheet — the Grand Total (Incl. GST) per site will calculate automatically.
7. Please quote for the complete scope of work for each Tier as listed. Partial quotes will not be considered.
8. The Summary sheet consolidates: Tier-1 total (x1 site) + Tier-2 total (x6 sites) = Grand Total for the entire tender. This updates automatically from the two BOQ sheets.
9. In case of any discrepancy between this BOQ and the RFP document, the RFP document (Scope of Work for Proposed Solution) shall prevail.
Note: Where the RFP groups several specification bullets under a single billable item (e.g., all sub-features of the Integrated Smart Rack Data Centre Solution under item "A"), only item "A" carries a Rate/Amount cell — the bullets beneath it are inclusions of that one Set, not separately priced items.
BOQ SUMMARY – ALL SEVEN SITES
Tender No.: CAG/Passive & Civil work/18082026-30
S.No. Tier / Sites Covered No. of Sites Rate Basis Per-Site Total (Excl. GST) Rs. Per-Site Total (Incl. GST) Rs. Combined Total (Incl. GST) Rs.
1 Tier 1 – 1 Site 1 Per site (as quoted)
2 Tier 2 – 6 Sites across IAAD offices in India 6 Per site (as quoted) x 6
GRAND TOTAL – ALL SEVEN SITES (Tier 1 x1 + Tier 2 x6), INCL. GST
Note: "Combined Total" = Per-Site Total (Incl. GST) × No. of Sites. Tier-2 rate is quoted once (on the "Tier 2 - Standard Site" sheet) and applied identically to all 6 Tier-2 locations across IAAD offices in India, since the BOQ, specifications, and quantities are identical across all Tier-2 sites as per the RFP.
BILL OF QUANTITIES – TIER 1 (1 Site)
Solution: Integrated Smart Row Solution | Racks: 4 Racks | IT Load: ~40 KW | Applicable to: 1 site (location to be intimated by CAG)
Sl. No. Item Description Unit Qty Unit Rate (Rs.) Amount (Rs.)
A Integrated Smart Rack Data Centre Solution including the following: Set 1
i. Smart Rack 42U, 600 mm x 1200 mm with integrated Hot & Cold aisle containment of minimum 300 mm each with following features : 04 Nos. Set 1
a. Rack Containment Frame should be of 42 U, 19'' mounting type with standard Rack + Cold & Hot Aisle Containment of 300 mm each Set 1
b. CRCA Rack frame is, scalable and modular with safe load carrying capacity of 1000 Kg Set 1
c. Color shade of Rack is RAL 7021 Set 1
d. Base plinth with 100 mm height Set 1
e. Cable entry provision from top & bottom both side of rack Set 1
f. Cut outs with brush grommet on top and bottom cover of rack for cable entry Set 1
g. Vertical Finger Cable Management unit (LH & RH) Assembly, for 42U Rack Set 1
h. Rack shall have front toughened glass door for complete 42U height visibility & rear steel split door Set 1
i. Thermally insulated cold aisle chamber Set 1
j. Blanking panels to prevent air mixing Set 1
k. 01 no. Fixed Shelf Set 1
l. Plastic Cable duct on vertical LH & RH section of rack for cable routing Set 1
m. Status based LED lighting Set 1
n. Rack enclosure physically separated through caged partition at cold & hot aisle to avoid unauthorized access from one rack to another. Set 1
o. Earthing Rail 25mmX500L Copper Strip Set 1
p. 100% blanking panels Set 1
q horizontal cable managers ( 2 no. per rack ) Set 1
ii. Inrow Precision Air Conditioner (≥ 20kW, variable capacity ) with N+N redundancy, DX based with complete accessories including inbuild Heater & Humidifier etc.: 03Nos Set 1
iii. IP based Remote Monitoring with Temp Monitoring, Humidity Monitoring, Door Switch Sensor, Water Leak Sensor, Beacon Alarm,Smoke sensor , Event Alerts, RS485 Port, Email Notification etc.: 01 Set Set 1
iv. 9inch touch screen HMI – Graphical User Interface display mounted on the Integrated smart rack solution for local monitoring: 01 No. Set 1
v. 0U, Vertical intelligent Rack Power Distribution Unit with PDU level monitoring, 32A, 400V with 30no. C13 & 12no. C19 outlet sockets, 3P+N+E : 08 Nos. Set 1
vi. Integrated Ultra-modern sound based Rodent Repellent System covering the complete volume of Integrated Smart rack DC: 01 set Set 1
vii. Access Control: High Security Common Biometric access control system controlling access to all door via Electromagnetic locks . Both front & rear rack doors will be provided with electro - magnetic locks and will operate on fail-safe principle through one common Biometric access control system : 01 set Set 1
viii. 1 nos IP Based Camera for live monitoring : 01 set Set 1
ix. Integrated Fire Alarm, Fire Detection & Fire Suppression system with control panel mounted inside the untility rack with required FK-5-1-12 gas, nozzles, gas release panel etc. covering entire volume of smart rack solution : 01 set Set 1
x. Integrated Electrical Power Distribution Panel inside utility rack for raw power & UPS power distribution , with required internal cabling & MCCB/MCBs : 01 set Set 1
B Low side works for Integrated Smart Rack Data Centre solution
i. 18G Copper Piping between Indoor unit to outdoor unit Set 1
ii. Condenser Cabling between Indoor to outdoor unit Set 1
iii. Copper Pipe Insulation for Hot gas line and liquid line Set 1
iv. MS fabrication for outdoor units Set 1
v. Drain Piping , 40mm dia PVC hard @ 10 mtr per unit Set 1
vi. R - 410A Refrigerant Set 1
vii. Extended piping kit (if piping exceeds 30 mtrs) Set 1
viii. Cable Tray with cover, 300 X 50 mm perforated Set 1
ix. Potable water pipe for Humidifier @ 10 mtr per unit Set 1
x. Cooling unit sequencing kit Set 1
C UPS FOR IT Load in N+N redundancy
a. UPS Systems 40kVA for IT/Server Load:
i. Supply , installation, testing & commisioning of IGBT based, Dual Conversion, Online rack mountable 40 kVA UPS , 3 phase (415 V ± 15%) Volts input & 3 phase output (415 V ± 1%), 50 Hz, unity output power factor, Dual conversion efficiency upto 95% , Eco mode efficiency of 99% , RoHS & Energy star certified UPS , Redundancy Configuration N+N. Set 2
b. VRLA Battery for battery Back Up
i. Supply , installation, testing & commisioning of Battery with 10 minutes back up @ 40kW IT Load @ unity pf ,alongwith Battery racks, copper cables between batteries, copper cables between UPS & batteries, DC MCCB Box Set 2
Total per Site (Excl. GST)
GST % (enter applicable rate) 0.18
Grand Total per Site (Incl. GST)
BILL OF QUANTITIES – TIER 2 (Standard Site – Rate per Site)
Solution: Integrated Smart Row Solution | Racks: 2 Racks | IT Load: ~20 KW | Applicable to: 6 identical sites across IAAD offices in India – quote rate for ONE site only
Sl. No. Item Description Unit Qty Unit Rate (Rs.) Amount (Rs.)
A Integrated Smart Rack Data Centre Solution including the following: Set 1
i. Smart Rack 42U, 800 mm x 1200 mm with integrated Hot & Cold aisle containment of minimum 300 mm each with following features : 02 Nos. Set 1
a. Rack Containment Frame should be of 42 U, 19'' mounting type with standard Rack + Cold & Hot Aisle Containment of 300 mm each Set 1
b. CRCA Rack frame is, scalable and modular with safe load carrying capacity of 1000 Kg Set 1
c. Color shade of Rack is RAL 7021 Set 1
d. Base plinth with 100 mm height Set 1
e. Cable entry provision from top & bottom both side of rack Set 1
f. Cut outs with brush grommet on top and bottom cover of rack for cable entry Set 1
g. Vertical Finger Cable Management unit (LH & RH) Assembly, for 42U Rack Set 1
h. Rack shall have front toughened glass door for complete 42U height visibility & rear steel split door Set 1
i. Thermally insulated cold aisle chamber Set 1
j. Blanking panels to prevent air mixing Set 1
k. 01 no. Fixed Shelf Set 1
l. Plastic Cable duct on vertical LH & RH section of rack for cable routing Set 1
m. Status based LED lighting Set 1
n. Rack enclosure physically separated through caged partition at cold & hot aisle to avoid unauthorized access from one rack to another. Set 1
o. Earthing Rail 25mmX500L Copper Strip Set 1
p. 100% blanking panels Set 1
q horizontal cable managers ( 2 no. per rack ) Set 1
ii. Inrow Precision Air Conditioner (≥ 20kW, variable capacity ) with N+N redundancy, DX based with complete accessories including inbuild Heater & Humidifier etc.: 02Nos Set 1
iii. IP based Remote Monitoring with Temp Monitoring, Humidity Monitoring, Door Switch Sensor, Water Leak Sensor, Beacon Alarm,Smoke sensor , Event Alerts, RS485 Port, Email Notification etc.: 01 Set Set 1
iv. 9inch touch screen HMI – Graphical User Interface display mounted on the Integrated smart rack solution for local monitoring: 01 No. Set 1
v. 0U, Vertical intelligent Rack Power Distribution Unit with PDU level monitoring, 32A, 400V with 30no. C13 & 12no. C19 outlet sockets, 3P+N+E : 04 Nos. Set 1
vi. Integrated Ultra-modern sound based Rodent Repellent System covering the complete volume of Integrated Smart rack DC: 01 set Set 1
vii. Access Control: High Security Common Biometric access control system controlling access to all door via Electromagnetic locks . Both front & rear rack doors will be provided with electro - magnetic locks and will operate on fail-safe principle through one common Biometric access control system : 01 set Set 1
viii. 1 nos IP Based Camera for live monitoring : 01 set Set 1
ix. Integrated Fire Alarm, Fire Detection & Fire Suppression system with control panel mounted inside the untility rack with required FK-5-1-12 gas, nozzles, gas release panel etc. covering entire volume of smart rack solution : 01 set Set 1
x. Integrated Electrical Power Distribution Panel inside utility rack for raw power & UPS power distribution , with required internal cabling & MCCB/MCBs : 01 set Set 1
B Low side works for Integrated Smart Rack Data Centre solution
i. 18G Copper Piping between Indoor unit to outdoor unit Set 1
ii. Condenser Cabling between Indoor to outdoor unit Set 1
iii. Copper Pipe Insulation for Hot gas line and liquid line Set 1
iv. MS fabrication for outdoor units Set 1
v. Drain Piping , 40mm dia PVC hard @ 10 mtr per unit Set 1
vi. R - 410A Refrigerant Set 1
vii. Extended piping kit (if piping exceeds 30 mtrs) Set 1
viii. Cable Tray with cover, 300 X 50 mm perforated Set 1
ix. Potable water pipe for Humidifier @ 10 mtr per unit Set 1
x. Cooling unit sequencing kit Set 1
C UPS FOR IT Load in N+N redundancy
a. UPS Systems 30kVA for IT/Server Load:
i. Supply , installation, testing & commisioning of IGBT based, Dual Conversion, Online rack mountable 30 kVA UPS , 3 phase (415 V ± 15%) Volts input & 3 phase output (415 V ± 1%), 50 Hz, unity output power factor, Dual conversion efficiency upto 95% , Eco mode efficiency of 99% , RoHS & Energy star certified UPS , Redundancy Configuration N+N. Set 2
b. VRLA Battery for battery Back Up
i. Supply , installation, testing & commisioning of Battery with 10 minutes back up @ 20kW IT Load @ unity pf ,alongwith Battery racks, copper cables between batteries, copper cables between UPS & batteries, DC MCCB Box Set 2
Total per Site (Excl. GST)
GST % (enter applicable rate) 0.18
Grand Total per Site (Incl. GST)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
CAFPassiveCivilRFP.pdf
Tender Documents • 1.01 MB
BOQCAGPassiveWork.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].