| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance | L1 | Accepted-Finance Lowest quoted rates | |
| 2 | L2₹4.0 L+₹18,825 (4.96%)Rejected-Finance | L2 | Rejected-Finance Highest quoted rates | |
| 3 | L3₹4.4 L+₹56,900 (15.0%)Rejected-Finance | L3 | Rejected-Finance Highest quoted rates | |
| 4 | L4₹4.5 L+₹71,434 (18.8%)Rejected-Finance | L4 | Rejected-Finance Highest quoted rates | |
| 5 | L5₹4.7 L+₹85,575 (22.5%)Rejected-Finance | L5 | Rejected-Finance Highest quoted rates |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
18 Oct 2023, 10:00 amClosed
HEAD ESD
Post Mohkampur Dist Dehradun
The work includes in term of earth work PCC RCC brick work Plaster work etc
2023_CSIR_169719_1
ESD/1/19/2023
Open Tender
Civil Works
Item Rate
120 days
CSIR-IIP, MOHKAMPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹590
DIRECTOR
₹10,000
1 Nov 2023
9 Oct 2023
19 Oct 2023
9 Oct 2023
18 Oct 2023
9 Oct 2023
Amount
Earth work in excavation All kinds of soil by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level.
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources), excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level.
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral staircases above plinth level up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand incuding manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 20%: 3 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) upto 20%)
Centering and shuttering including strutting, propping etc. and removal of form for
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement Thermo-Mechanically Treated bars of grade Fe-500D or more for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Brick work Cement mortar 1:6 (1 cement : 6 coarse sand) with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in.
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand).
M.K. CONSTRUCTION
PSK DEVELOPERS AND CONSTRUCTIONS PVT. LTD.
ROORKEE ASSOCIATES
R.K.CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .