Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹33.1 L Construction of RCC septic tanks (2 Nos.) with of 150 users connecting sewer lines, manholes, soak pits for Administration Block & Udai Giri - Aravali Block Hostel Blocks, plinth protection around math lab & laying of CC paver path way for ATL Lab and Math lab at JNV, Kottarakkara, Kollam, Kerala. | Construction of RCC septic tanks (2 Nos.) with of 150 users connecting sewer lines, manholes, soak pits for Administration Block & Udai Giri - Aravali Block Hostel Blocks, plinth protection around math lab & laying of CC paver path way for ATL Lab and Math lab at JNV, Kottarakkara, Kollam, Kerala. | L1 | |
| 2 | L2₹33.8 L+₹78,221.56 (2.37%) Construction of RCC septic tanks (2 Nos.) with of 150 users connecting sewer lines, manholes, soak pits for Administration Block & Udai Giri - Aravali Block Hostel Blocks, plinth protection around math lab & laying of CC paver path way for ATL Lab and Math lab at JNV, Kottarakkara, Kollam, Kerala. | Construction of RCC septic tanks (2 Nos.) with of 150 users connecting sewer lines, manholes, soak pits for Administration Block & Udai Giri - Aravali Block Hostel Blocks, plinth protection around math lab & laying of CC paver path way for ATL Lab and Math lab at JNV, Kottarakkara, Kollam, Kerala. | L2 | |
| 3 | L3₹36.4 L+₹3.3 L (10.00%) Construction of RCC septic tanks (2 Nos.) with of 150 users connecting sewer lines, manholes, soak pits for Administration Block & Udai Giri - Aravali Block Hostel Blocks, plinth protection around math lab & laying of CC paver path way for ATL Lab and Math lab at JNV, Kottarakkara, Kollam, Kerala. | Construction of RCC septic tanks (2 Nos.) with of 150 users connecting sewer lines, manholes, soak pits for Administration Block & Udai Giri - Aravali Block Hostel Blocks, plinth protection around math lab & laying of CC paver path way for ATL Lab and Math lab at JNV, Kottarakkara, Kollam, Kerala. | L3 | |
| 4 | - | - |
| Sl No | Description | Qty | Unit | M/s HINDUSTAN INFRASTRUCTURE CO L2 | ELDHO JOHN L1 | MOHD SARWAR L3 |
|---|---|---|---|---|---|---|
| 1 | Total Amount | - | - | -7.86 ₹33,83,725.4 | -9.99 ₹33,05,503.84 Lowest | -0.99 ₹36,36,017.5 |
Tender Value
₹36.7 L
EMD Value
₹73,447
Closing Date
17 Feb 2026, 3:00 pmClosed
EE-Kottyam
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER
Construction of RCC septic tanks (2 Nos.) with of 150 users connecting sewer lines, manholes, soak pits for Administration Block & Udai Giri - Aravali Block Hostel Blocks, plinth protection around math lab & laying of CC paver path way for ATL Lab and Math lab at JNV, Kottarakkara, Kollam, Kerala.
142692
38/2025-26/KCD/Kottayam - Recall 1
OPEN
Civil Works - Others
NCB
180 days
Kollam, Kerala
14 documents required · 14 mandatory
₹73,447
Not Applicable
17 Feb 2026
7 Feb 2026
17 Feb 2026
17 Feb 2026
16 Feb 2026
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
38KCD2025-26R1+NIT+Conditions+and+Schedule.pdf
document • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .