Replacement of steel girders with PSC Slab and strengthening of substructure of Bridges upto span 12.20 m {Br no 206 (span 2x12.19 m), 231 (span 3x12.19m) on DUI-BTI, Br no 215 (span 1x12.00m) on DUI-JHL, Br no. 4 (span 3x12.20m) & 6 (span 2x12.20m) on JHL-HSR under Sr.DEN-II.
OT-125-UMB-2026-27
OT-125-UMB-2026-27
Open
Works - General
18 Months
Upper Subansiri, Arunachal Pradesh
₹0
₹7.8 L
16 Jul 2026
16 Jul 2026
24 Jul 2026
Item Breakup - 01-Part "A" for DSR-2021 items
Item Breakup - 02-Part "B" for IRUSSOR-2021 items
Using Soil Class SQ1 Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils Providing and laying in position Plain cement concrete of specified Nominal M i x f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse sand cum (zone-III) : 3 graded stone aggregate 20 mm nominal size)
1:3:6 (1 Cement : 3 coarse sand (zone- cum III): 6 graded stone aggregate 40 mm nominal size). AMBALA DIVISION-ENGG/NORTHERN RLY P r o v i d i n g and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Wing wall and Return wall
Providing and laying Plain Cement cum Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer. Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, e.g. Sqm pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
Extra for additional height over item Sqm no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof. AMBALA DIVISION-ENGG/NORTHERN RLY
P r o v i d i n g and laying in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site using 20mm graded crushed stone aggregate and coarse sand of approved quality in jacketing of piers and abutments from bottom of foundation up to a height of 10m for designed thickness of jacketing including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be paid extra under relevant item. 2. Plasticizer shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticisers at the stage of Mix Design and in that case deduction shall be made as per relevant item. Extra over 025040 for drilling of holes and insertion of dowel bars in case of Jacketing
Extra for drilling 32mm dia. holes for Metre jacketing / anchoring
Extra for inserting of dowel bars of Metre specified dia. (cost of rods to be paid extra) Supply and using Cement at Worksite
Pozzolana Portland Cement approved MT brands/makes Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Thermo-Mechanically Treated bars of Kg grade Fe-500D or more of approved brands/makes. Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all lead & lift, etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading material etc. The load shall be 1.25 times the stipulated design load.
For Span design load up to 100 MT AMBALA DIVISION-ENGG/NORTHERN RLY Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms.
Above 150 km up to 200 km
MT- Above 200 km Km
Supply & applying two coats of Sqm bitumen emulsion of Grade RS-1, conforming to IS:8887 on the top surface of concrete deck slab (New bridges) @ 1.70 kg/sqm after cleaning surface with all materials, labour, tools and plants, equipment etc. complete. Delaunching of existing and Launching & fixing of new girder/slab in exact location of all type of steel/PSC girders/Slabs available at site, during block, complete job including lifting to any height as per site requirement, provision of approaches, and placing of released material away from bridge stream or roads as the case may be. Note: Payment under this item shall be made for the total weight of girder removed and newly launched girder.
Delaunching of existing Structural MT steel plate girders / slabs and Launching New PSC girders / slabs Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra).
Painting the HFL mark and Danger Each level mark, year of HFL on bridge abutments and piers with ready mixed paint as per standard in two coats over one coat of primer with all materials, labour, tools, scaffolding, all lead and lift etc. including writing complete.
Providing cast in situ bridge number Each plaques as per Railway drawing in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm notch in Bridge parapet coping duly engraving the letter and figures and an arrow indicating the direction of flow and finishing the top exposed surface with cement mortar 1:3, painting letters and figures with two coats of black enamel paint on two coats of white background with all labour, tools, cement, paint etc. with all leads and lifts. AMBALA DIVISION-ENGG/NORTHERN RLY
Dewatering of natural or accumulated HP water from any location. Payment to Hour be done for Horse power of pump multiplied by pumping hours. Dismantling and removing rail of all section & length from track, laid on any type & density of sleeper by removing fish plates, fastenings & fish bolts and other materials including stacking all released materials within an average distance of 500 metres as directed by Engineer in-charge. Note: 1.Cutting of rails shall be paid separately. 2.Work to be done under traffic block.
For Casual/Scattered work Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for w e l d i n g and stacking of released material without infringement within 250m as directed by Engineer-in- Charge. Note: Rail drilling and cutting to be paid separately.
For Casual/Scattered work
Lifting and packing for regrading the TRM existing PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in-charge. AMBALA DIVISION-ENGG/NORTHERN RLY
Cess repair/widening work as per cum RDSO Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment.
Spreading of ballast, from existing cum stacks available along formation on top or at cess, in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in-charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. AMBALA DIVISION-ENGG/NORTHERN RLY
Linking of BG track (with guard rail ) TRM over ballasted deck bridges with any type of rail section and PSC sleeper in c lu d in g leading free rails/welded panels available along the alignment on to bridge, leading and spreading all fittings and fastenings, leading & spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails & guard rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. 3. This item shall be applicable only when track is with Guard Rail. Linking without guard rail be paid under relevant item for plain track linking. First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
For PSC Sleeper Track with Sleeper TRM Density of 1660 Third or subsequent Through Packing o f track for all sleeper density including picking of slacks, as required after second through packing, subsequent to Deep Screening work as per procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regrading/realignment works also. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
For PSC Sleeper Track with Sleeper TRM Density of 1660 AMBALA DIVISION-ENGG/NORTHERN RLY Anti-corrosive painting of rail on running track of any sleeper density on web, foot etc. including liner contact area (excluding bottom of foot) and fishing plane as per requirement with two coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including painting of liners, ERCs and including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM Note: 60% of payment shall be made if painting on only gauge face side is done.
For 60 Kg Rails Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020)
60 Kg - 110/90 UTS - On Running Line Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991.
On Running Line Loading of 52kg / 60kg PSC normal line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
I n Wagon where mechanical handling MT is possible a n d traffic block is not required or in Truck / trailer Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. AMBALA DIVISION-ENGG/NORTHERN RLY
Lead up to 5 Km Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items.
Lead beyond 10 Km and up to 20 km
Lead beyond 30 Km and up to 50 km Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
From Truck / Trailer
Manufacture of flared portion of Guard Set Rail by cutting and bending to required shape & RDSO's approved drawings. Note: (1) Rails shall be supplied by Railways. (2) One set consists of two rails i.e. both left and right.
Drilling holes 25mm to 40mm dia. with Each drill twist in the foot of guard rails for fixing guard rails on bridge as directed.
Drilling of 25mm to 40mm dia. holes in Each PSC sleepers with suitable rotary hammer / drilling machine at indicated location for fixing of guard rails on bridges & its approaches as per approved drawing and fixing of contractor's HDPE dowels and adhesive of approved quality to Drawing no. RDSO/T-3002, procured from RDSO's approved sources with contractor's materials and consumable.
Fabrication, supplying and fixing Each 600mm x 450mm Bridge Board made from 16 SWG MS Sheet duly welded or riveted to back support of two 600mm long horizontal angles of size 25mm x 25mm x 3mm & two numbers 2.5 metre long vertical support of MS Angle of size 50mm x 50mm x 5mm, welded / rivetted to board. Vertical supports shall have split ends for proper fixing in ground. Vertical supports of board shall be embedded i n ground in M 20 Cement Concrete blocks of size 300mm x 300mm x 300mm, complete job including painting & writing of subject matter on bridge board, as directed by Engineer - In charge Note: Excavation & concrete work will be paid separately. AMBALA DIVISION-ENGG/NORTHERN RLY Hiring of machinery for minor miscellaneous works for short duration i n c l u d i n g operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
JCB Backhoe Loaders 3DX Plus or Hour similar with minimum 1.10 cum bucket capacity Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. 44 022011(022020) Extra over item nos. 022011 to cum 575.00 43.31 24903.25 022014 for executing the work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] Total 30242411.56
Supply of structural drawing for precast PSC Slab of clear span upto 15m and for 1 single track as per Railway GAD including all details duly submitting design calculation for loads etc as required as per directions of engineer in charge with proof checking by IIT/NIT or equivalent gov engineering college at all contractor's cost complete as directed. Analysis of complete structure to be done in Staad Pro or equivalent software and design should be in software as well as in excel for validation to meet all codal requirements of Indian Railways and to meet all instruction of HQ design cell for discussion during scrutiny as and when required. Soft copy and hard copy of design and structural drawing shall be submitted for the approval of competent authority. The Design and Structural drawing shall be submitted in 2 sets in 'A0/A1 size tracing sheets. The rate shall be all inclusive of Government Taxes like GST, VAT etc. nothing extra shall be paid. Payment will be made after approval of design/drawing from HQ.
(A) "Study of entire details of single abutment/pier upto 12m height between rail level to founding level of open foundation/ bottom of pile cap or well cap including foundation, substructure as per loading standard for determining suitability of structure to carry the updated loads due to replacement of steel girder with PSC slab, etc. including submission of report containing necessary data, analysis of data and recommendations in the form of a report. Rate includes recommending cost-effective rehabilitation /strengthening scheme design and drawings for existing 2 substructure of bridges. Design and drawings must be proof checked by NIT / IIT or equivalent govt, engg. college. Analysis of complete structure to be done in Staad Pro or equivalen software and design should be in software as well as in excel for validation to meet all codal requirements of Indian Railways and to meet all instruction of HQ design cell for discussion during scrutiny as and when required. Soft copy and hard copy of design and structural drawing shall be submitted for the approval of competent authority. The Design and Structural drawing shall be submitted in 2 sets in 'A0/A1' size tracing sheets. The rate shall be all inclusive of Government Taxes like GST, VAT etc. nothing extra shall be payable other than the rates accepted. NOTE: In case of multi span bridges, same type of pier shall be treated as single unit for analysis and payment purpose"
Additional to S. No. 2 for Height upto 24 m mentioned in item
Additional to S. No. 2 for pile/well foundation
Supplying and stacking of 65 m section gauge machine crushed hard stone ballast as per RDSO specification for track ballast IRS-GE-1,2016 ( with latest / Updated correction slips) within railway land where ever space is available along cess/toe near railway track in Ludhiana - Mullanpur section as per railway standard specifications and special conditions of contract,as pe requirement at different locations. The rates are inclusive of levelling and clearing the space for stacking, all 3 Eads, lifts, ascents, decents ,handling, rehandling, crossing running/non running tracks/lines/sidings/sand humps, nallahs, streem, making of ramp/approach road etc and crossing any type of other obstructions as required according to site conditions with all royalty, octroi, trade tax, service tax, VAT etc levied & leviable by centra / state Govt. as a complete job. Site for stacking ballast will be demarcated by site Engineer before stacking, site will be levelled and nothing shall be paid for wrong stacking. The rates also include loading ,leading, unloading & stacking of ballast including other charges such as royalty, octroi, trade tax, service tax, VAt etc. As levied & leviable by Central/State Govt.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NIT-18-UMB-2026-27.pdf
ATTACHMENT
AdcanceCorrectionslips1234567891011andMasterPolicyforDisputeRedressal.pdf correction slips
ATTACHMENT
SafetyInstructionatWorksSite.pdf
ATTACHMENT
GeneralConditionsforcivilworks.pdf
ATTACHMENT
TNN-18E-WorksDSR-UMB-2026-27.pdf
ATTACHMENT
SPECIALCONDITIONSSr.DEN-2.pdf
ATTACHMENT
AdcanceCorrectionslips1234567891011andMasterPolicyforDisputeRedressal.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].