The Executive Engineer
Various Diversion of SHRB / MDRB on Limbdi Branch Canal (Second Attempt)
304841
03 of 2026-27 (Second Attempt)
Open
Civil Works - Canal
Works
Surendranagar
6 documents required · 6 mandatory
₹4,248
Executive Engineer SBC Dn No.4/1 Limbdi
₹1.4 L
13 May 2026
13 May 2026
13 May 2026
30 May 2026
13 May 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all construction plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for canal work Road and Bridge works. For building works
specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to Clause
29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed air
drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Division: Executive Engineer, S.B.C. Dn. No. 4/1, Limbdi.
Name of Work :- Various Diversion of SHRB / MDRB on Limbdi Branch Canal.
Description of Item Quantity Unit Rate Amount
Earthwork/Back filling with selected earth brought
from out side borrow area or from excavated useful
1 material incl. watering, ramming, Compaction with 2446.00 Cum 141.00
pnumatic temping and all lead and lift etc
Excavation in all sort of strata and formations incl.
depositing the unuseful excavated stuff as and
where directed incl sorting and stacking useful
2 materials as directed upto 30 mt lead etc. complete 602.00 Cum 83.00
incl. dewatering. (Depth 0 TO 3.0 mt ) (For all type
canal & foundation trenches of C.D. works )A) IN
OVERBURDEN INCL. HARD MURRUM.
Supplying and fixing reinforced concrete heavy
duty non pressure pipes with collars for culverts
including setting and joining the pipes in C.M. 1:2
watering and laying (To level of slops of I.S. 458 /
1971 Class NP4 of following internal diameter.
(viii) 1600 mm dia.
Type - A, "W" : Metal Beam Crash Barrier
(Providing and erecting a "W" metal beam crash
barrier comprising of 3 mm thick corrugated sheet
metal beam rail, 70 cm above road/ground level,
fixed on ISMC series channel vertical post, 150 x
75 x 5 mm spaced 2 m centre to centre, 1.8 m high,
1.1 m below ground/road level, all steel parts and
fitments to be galvanised by hot dip process, all
fittings to conform to IS:1367 and IS:1364, metal
beam rail to be fixed on the vertical post with a
spacer of channel section 150 x 75 x 5 mm,
mm long complete as per clause 811)
Supplying and fixing road sign board of M.S.
plates and angle iron including painting, lettering
5 etc. complete including fixing in C.C. 1:4:8 with 54.00 Each 3072.99
necessary excavation etc. complete as per I.R.C.
type design.(ii) Reflective type
Providing,cutting,bending,binding and fixing in
position as per drawing. TMT BAR , Fe-415
6 reinforcement for R.C.C. works and anchor bars 10.88 MT 66268.00
incl cost of black annealed 16 to 18 BWG M.S..
Wire etc.complete with all lead and lift.
Prov. and Laying in position Controlled cement
concrete using cement, sand and crushed aggregate
7 by mass and machine mix for R.C.C/CC work 1343.00 Cum 4303.00
including necessary formworks centering
scaffolding compaction by vibrator,curing as
directed with all lead & lift etc complete Excluding
the cost of reinforcement A) Concrete grade M-15
Prov. and Laying in position Controlled cement
concrete using cement, sand and crushed aggregate
by mass and machine mix for R.C.C/CC work
including necessary formworks centering
scaffolding compaction by vibrator,curing as
directed with all lead & lift etc complete.
Excluding the cost of reinforcement A) Concrete
grade M-25 and MSA-20mm
Providing, supplying, Lowering, and laying ISI
Standard R.C.C. NP-3 Class pipes in standard
lengths of following Diameter suitable for either
collar joints or rubber ring joints including all
taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading,
conveyance to Site, and jointing in proper position,
9 grade and alignment at all level as directed by 90.00 Rmt 3969.00
Engineer-in-charge including all labour, giving
hydraulic testing as per ISI code. (G) 900 mm dia.
NOTE:- One collar should be supplied with each
full length plain ended RCC pipe, cost included in
rates below. One rubber ring should be supplied
with each full length socketed pipe, cost included
in rates below.
Providing & laying dry rubble stone pucca pitching
with panel (of size not more than 10sqmt ) of stone
masonry 30cm thick wall in C.M. 1:5, without base
10 , inverted filter and header stone but with 10 cms 702.00 Sq.mt 831.00
thick murrum layer (for base ) incl hand packing
and trimming and dressing slopes etc. b) 30 cms
thick stone pitching with pointing in C.M. 1:2
Providing, laying, spreading and compacting layer
of Quarry Spall having CBR not less than 15%, as
11 subgrade for the designed pavement and 452.00 Cum 1319.32
conforming to Clause 305 of MoRT&H
Specifications.
Providing, laying, spreading and compacting
graded stone aggregate to Water Bound Macadam
(WBM) specification including premixing the
material with water at OMC in mechanical mix
12 plant carriage of mixed material by tripper to site, 366.00 Cum 1656.69
laying in uniform layers with paver in sub base /
base course on well prepared surface and
compacting with vibratory roller to achieve the
desired density.
Total Amount Rs.
Total Amount Rs.
I/We am/are willing to carry out the work at… ....................... %above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item(with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)
(C)NetTendered Amount(A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per Nominal mix the cost of difference of cement consumption have been deducted from
the rate of original item at the rate of input rate (i.e. 5448.53 Rs / MT for OPC) in all the
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice Various Diversion on SHRB MDRB.pdf
Final SBD LBC SHRB All Diversion.pdf
BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .