Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.2 LAccepted-AOC 25 1777 A SJM BUILDING KINASSERY POKKUNNU P O KOZHIKODE 673007 | KOZHIKODE | KOZHIKODE | KERALA | 673007 | ₹70.2 L Quoted ₹59.5 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹68.2 LRejected-Finance 35 AURI MORE ANPARA ANPARA SONBHADRA UTTAR PRADESH 231225 UDYAM UP 72 0015681 09CSTPD3288A2ZJ R M MII STATUS AS VERIFIED | SONBHADRA | UTTAR PRADESH | 231225 | ₹68.2 L | L2 | Rejected-Finance Highest quoted |
| 3 | L3₹72.3 LRejected-Finance 61 3134 1ST FLOOR MATHA ARCADE KSN MENON ROAD VRM ROAD JN RAVIPURAM KOCHI 682016 | KOCHI | ERNAKULAM | KERALA | 682016 | ₹72.3 L | L3 | Rejected-Finance Highest quoted |
| 4 | L4₹75.9 LRejected-Finance ARIMEL HOUSE KONATHUKUNNU P O THRISSUR 680125 | THRISSUR | THRISSUR | KERALA | 680125 | ₹75.9 L | L4 | Rejected-Finance Highest quoted |
Tender Value
₹99.2 L
EMD Value
₹50,000
Closing Date
26 Dec 2025, 3:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer,TC Sub Division,Vydyuthi Bhavanam,Kottapuram, P O Poothole,Thrissur, Pin 680004
Laying of 33kV UG cable in connection with construction of 33kV Substation, Puzhakkal
2025_KSEB_821720_1
06/2025-26/dtd. 10.12.2025 of AEE/TCSD/TSR
Open Tender
Electrical Works
90 days
Kuttur MLA road
As described in the tender document.
7 documents required · 7 mandatory
₹5,900
₹50,000
8 Apr 2026
10 Dec 2025
29 Dec 2025
10 Dec 2025
26 Dec 2025
10 Dec 2025
10 Dec 2025 - 26 Dec 2025
eTendering System Government of Kerala Created By: Nisha A Created Date/Time: 05-Jan-2026 11:59 AM Tender Title: Laying of 33kV UG cable in connection with construction of 33kV Substation, Puzhakkal Tender ID: 2025_KSEB_821720_1
Tender Inviting Authority: Assistant Executive Engineer, Transmission Construction Sub Division, Thrissur
Name of Work: Laying of 33kV UG cable inconnection with Construction of 33 kV Substation Puzhakkal
Contract No: Tender No. 06/25-26/AEE/TCSD/TSR/10.12.2025
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 A V PRIJEESH (GSTN-32AKYPP6939R1ZT) BID ID -2445133 9918170.02 -23.50 7587400.07 Seventy Five Lakh Eighty Seven Thousand Four Hundred
2.00 BILL ENGINEERING AND CONSTRUCTION (GSTN-32AAIFB3780C1ZV) BID ID -2447594 9918170.02 -40.01 5949910.19 Fifty Nine Lakh Forty Nine Thousand Nine Hundred and Ten
3.00 ADDYUTHIYA POWER PROJECTS PRIVATE LIMITED (GSTN-32AAKCA2347M1ZM) BID ID -2447926 9918170.02 -27.07 7233321.40 Seventy Two Lakh Thirty Three Thousand Three Hundred and Twenty One
4.00 HI TECH ENGINEERING (GSTN-32AAQFH4366Q1ZO) BID ID -2448014 9918170.02 -31.20 6823700.97 Sixty Eight Lakh Twenty Three Thousand Seven Hundred
Lowest Amount Quoted BY: BILL ENGINEERING AND CONSTRUCTION(5949910.19)
BOQ Summary Details Tender Title: Laying of 33kV UG cable in connection with construction of 33kV Substation, Puzhakkal Tender ID: 2025_KSEB_821720_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 BILL ENGINEERING AND CONSTRUCTION (BID ID -2447594) 5949910.19 L1
2 HI TECH ENGINEERING (BID ID -2448014) 6823700.97 L2
3 ADDYUTHIYA POWER PROJECTS PRIVATE LIMITED (BID ID -2447926) 7233321.40 L3
4 A V PRIJEESH (BID ID -2445133) 7587400.07 L4
stage.html
html • 0.05 MB
technical_1377387.pdf
techsummary_1377387.pdf
finance_1377387.pdf
BOQ Comparative Chart
xlsx
finsummary_1377387.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
NIT.pdf
Other Document • 0.08 MB
BOQ_1377387.xls
BOQ • 0.30 MB
biddocument.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid