| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-AOC SREENILAYAM MANNADI P O | IDUKKI | KERALA | 685501 | ₹32.3 L Quoted ₹32.4 L | L1 | Accepted-AOC L1 Bidder Single bidder |
| Sl No | Description | Qty | Unit | R.Rajendran Pillai L1 |
|---|---|---|---|---|
| 1.00RECTIFICATION OF AQUEDUCT at ch.8304 | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 69.61 | cum | 236.43 ₹16,459.07 |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 210 | sqm | 335.42 ₹70,438.20 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 18.76 | cum | 2,259.23 ₹42,383.15 |
| 1.00 | OD32643/2024-2025:Providing support to barrel near piers using square scaffolding vertically and horizontal support with I beams up to a height of 6m height for 15 days | 6 | each | 1,068.29 ₹6,409.74 |
| 1.00 | 26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge25 mm average thickness | 26.93 | sqm | 125.5 ₹3,379.09 |
| 1.01 | 26.29.2:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter | 244.65 | metre | 15.3 ₹3,743.15 |
| 1.01 | OD1220/2024-2025:Applying corrosion inhibitor- One full coat of Nitozinc primer / approved equivalent make epoxy zinc rich primer on the cleaned and dried reinforcing bar using a small paint brush such that the primer coated should make an unbroken continuous film on the bars. Measurement is made for whole exposed area including cost of materials, labour charges, conveyance of materials to site, hire charges of tools etc complete. | 6.12 | sqm | 203.67 ₹1,245.65 |
| 1.01 | 26.32.2:Providing, mixing and applying SBR polymer (of approved make) modified
Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with
polymer minimum 2% by wt. of cement used) as per specifications and
directions of Engineer-in-charge.
Note: Measurement and payment: The pre-measurement of thickness shall be
done just after the surface preparation is completed and Payment under this
item shall be made only after proper wet curing has been done and surface
has been satisfactorily evaluated by sounding / tapping with a blunt metal
instrument and/or the 75mm size cube crushing strength at the end of 28 days
to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers. | 48.58 | sqm | 612.43 ₹29,751.85 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 13 | cum | 9,487.53 ₹1.2 L |
Tender Value
₹29.7 L
EMD Value
₹50,000
Closing Date
28 Jun 2025, 6:00 pmClosed
C
O/o The Executive Engineer KIP RB Division No II Kottarakkara
GENERAL PLAN FUND 2024 25 KIP OM Urgent rectification of Aqueducts of Pandalam Branch canal at chainages 8304m balance work 11560m 12800m and 14535m and allied works General Civil Work
2025_Irrig_753322_4
IRR/PII/TR/2418/2024_5_14_13/1
Open Tender
Civil Works - Canal
360 days
Pathanamthitta
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
9 Mar 2026
20 Jun 2025
1 Jul 2025
20 Jun 2025
28 Jun 2025
20 Jun 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1257334.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid