Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.5 LAdmitted-Finance 00 IN FRONT OF SHIVPURI HOTEL NEAR KOTHI NO 14 SHIVPURI MADHYA PRADESH 473551 | SHIVPURI | MADHYA PRADESH | 473551 | L1 | Admitted-Finance | |
| 2 | L2₹54.5 L+₹3.0 L (5.76%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical The contractor has not uploaded documents mentioed at para 4 (f) and 4(g) of Appx A to NIT/ Tender documentson Sl page No 11 even after intimation through short fall documents | |
| 4 | Rejected-Technical | - | Rejected-Technical The contractor has not uploaded documents mentioed at para 4 (f) and 4(g) of Appx A to NIT/ Tender documentson Sl page No 11 even after intimation through short fall documents | |
| 5 | Rejected-Technical COLABA MUMBAI | - | Rejected-Technical The contractor has not uploaded documents mentioed at para 4 (f) and 4(g) of Appx A to NIT/ Tender documentson Sl page No 11 even after intimation through short fall documents |
| Sl No | Description | Qty | Unit | Leo Elevator Company L2 | Bharat Enterprise L1 |
|---|---|---|---|---|---|
| 1.00 | Comprehensive maintenance of electrically operated passenger lifts installed at Junior and Senior Sailor's marrried Accn, Nausena Bagh, lifts in reliable safe and efficient operating condition (Make of Lift : OTIS Model RE-GEN) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance (Monthly, Quarterly, Half yearly and yearly) in systematic and controlled manner suitable for serving Ground + six/ eight floors i.e total seven/ nine landings with electric power operated doors installed complete all as specified and directed for the following lifts:
Nausena Bagh : Building No. P-135 to P-139 Capacity of 08 Passengers lifts - 05 Nos (Total Qty 05 Nos x 11 months = 55 per months) and Bldg No P-128 to P-132 to P-134 Capacity of 08 Passengers lifts-06 Nos (Total qty 6 Nos x 11 Months =66 per months) | 121 | Each lift Per Month | 9,850 ₹11,91,850 | 9,000 ₹10,89,000 Lowest |
| 2.00 | Comprehensive maintenance of electrically operated passenger lifts installed at Junior and senior Sailor's marrried Accn, Nausena Bagh, lifts in reliable safe and efficient operating condition (Make of Lift : OTIS Model RE-GEN) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance (Monthly, Quarterly, Halfyearly and yearly) in systematic and controlled manner suitable for serving Ground + six/ eight floors i.e total seven/ nine landings with electric power operated doors installed complete all as specified and directed for the following lifts:
Nausena Bagh : Building No. P-135 to P-139 Capacity of 13 Passengers lifts - 05 Nos (Total Qty 05 Nos x 11 months = 55 per months) Bldg No P-128 to P-132 to P-134 Capacity of 08 Passengers lifts-06 Nos (Total qty 6 Nos x 11 Months =66 per months) | 121 | Each lift Per Month | 9,850 ₹11,91,850 | 9,800 ₹11,85,800 Lowest |
| 3.00 | Comprehensive maintenance of electrically operated passenger lifts installed at Officers married Accn, NOFRA, lifts in reliable safe and efficient operating condition (Make TRIO manufactured by M/s TRIO Elevators Co. (India) Pvt. Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance (Monthly, Quarterly), Halfyearly and yearly) in systematic and controlled manner suitable for serving Ground + six floors i.e total seven landings with electric power operated doors installed complete all as specified and directed for the following lifts:
NOFRA : Building No. P-120 to P-122 Capacity of 08 Passengers lifts - 03 Nos
(Total Qty 03 Nos x 11 months = 33 per months) | 33 | Each lift Per Month | 10,500 ₹3,46,500 Lowest | 10,800 ₹3,56,400 |
| 4.00 | Comprehensive maintenance of electrically operated passenger lifts installed at Senior sailor's married Accn, Nausena Bagh, lifts in reliable safe and efficient operating condition (Make of lift - OTIS Model RE-GEN) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance (Monthly, Quarterly, Halfyearly and yearly) in systematic and controlled manner suitable for serving Ground + seven floors i.e total eight landings with electric power operated doors installed complete all as specified and directed for the following lifts:
Nausena Bagh : Building No. P-131 Capacity of 08 Passenger lifts - 01 No & Capacity of 13 Passenger lifts - 01 No
(Total Qty 02 Nos x 11 months = 22 per months) | 22 | Each lift Per Month | 9,850 ₹2,16,700 Lowest | 11,300 ₹2,48,600 |
| 5.00 | Comprehensive maintenance of electrically operated passenger lifts installed at Officers married Accn, NOFRA, lifts in reliable safe and efficient operating condition (Make TRIO manufactured by M/s TRIO Elevators Co. (India) Pvt. Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance (Monthly, Quarterly), Halfyearly and yearly) in systematic and controlled manner suitable for serving Ground + six floors i.e total seven landings with electric power operated doors installed complete all as specified and directed for the following lifts:
NOFRA : Block No. P-120 to P-122 Capacity of 13 Passengers lifts - 03 Nos (Total Qty 03 Nos x 11 months = 33 per months) | 33 | Each lift Per Month | 10,500 ₹3,46,500 Lowest | 10,900 ₹3,59,700 |
| 5.01Notes for item No. 01 to 05 :- (i) The contract includes repair, replacement of machines, motors, generators, ropes, belt, inverter/ ARD system, controller parts, PCBs, rollers, gears, bearings, solenoids, coils, chock break shoes, liners, contactors, relays, push bottons, coils, door operator VVF drive, VVVF main drive, car door, safety device limit switches, emergency alaram system with hooter, magnetic switches,magnets,door motor,door drive,encoder,car door safety device, Infrared screen, governors, interlock on hoistway doors, gear oil,travelling cable, indicators, LED down lights , LED display boards and minor mechanical spare parts. The cost of materials is deemed to be included in the rates quoted by the contractor.except item no 6 to 7 (ii) The above maintenance includes complete maintenance of existing lifts by regularly and systematically examining adjusting lubricating as and when required for smooth and efficient functioning of the lifts. (iii) Contractor will prominently display his contact / mobile number inside and outside the lift on each lift for call in emergency. (iv) All existing earthing of the lifts shall be maintained and made fully functional by the contractor to the entire satisfaction of the Engr-in-Charge. (v) The contractor will detail one technician staff to inspect the lift regularty regarding functioning of lifts or any other issues arising in the lift. The problem noticed if any to be informed immediately to JE E/M / Engr-in-Charge. Technician should alaways carry service tools during site visit. (vi) Contractor or his rep shall come to the site of breakdown within two hours of notification of breakdown. In case the contractor or his rep shall not visit the site for attending breakdown within two hours, a penalty of Rs 600 per fault per day shall be imposed over contractor and shall be deducted from his dues. (vi) Cleaning of lifts regularly with cleaning solution & freshner is demmed to be included in quoted rate. | |||||
| 6.00 | Material and labour for maintainance free environment friendly (Chemical Earthing) earth electrode set comprising of 17.2 mm dia, 3 mtrs long rod of low carbon steel molecular copper bounded for a thickness of 250 micro OHMS, highly conductive ANSI/NSF STD-60 certified carbon bound backfill compound which shall set like concrete according to BS 7430 & IEEE 80 (each bag shall contain 50 lbs) and suitable copper clamp connected to copper earth lead strip of size 20 mm x 3 mm by means of bolts nuts check nuts and washers of tinned copper / brass in addition to brazing of all joints and earth strip protected by GI pipe 40 mm bore light grade complete all as directed by Engineer-in-Charge.
Make: M/s McML Protection Technologies Pvt Ltd / M/s JMV Earthing Equipment Pvt Ltd . M/s JEF Techno Solutions (P) Ltd / M/s Vijetha Earthing System, Hyderabad / M/s Rail Tech Engineering Works, JEF Ecosafe or equivalent as approved by GE.
Note:- The quoted rate is also deemed to be include the cost of the following: -
(i) The earthing shall comply to IS-3043.
(ii) The earth resistance shall be less than one ohm.
(iii) Earth electrode shall be non-corrosive, solid steel round rod of size 17.2 mm dia, 3000mm long, made of high tensile steel with molecularly bonded copper coating of thickness 250 microns on the outside.
(iv) The pit shall be filled with highly conductive and eco friendly ground enhancing carbon based backfill compound suitable for any type of strata. The Earth enhancement material shall be supplied in sealed, moisture proof bags. These bags shall be marked with Manufacturer's name or trade name, quantity, batch No & date of manufacture.
(v) The electrode shall be provided on its top with an earth termination clamp made of electrolytic grade copper, joined by exothermic welding and including connecting the earth conductor with stainless steel nuts, bolts and washers of suitable size. (vi) A 300mm x 300mm PCC chamber with suitable size PCC cover with handle and kept on suitable angle iron frame to place the cover and shall be provided on the top of the earth system. The Chamber shall be flushed with the ground surface and including necessary PCC bed (1:4:8, type D2) at the bottom of chamber. | 27 | Each Job | 24,000 ₹6,48,000 | 15,500 ₹4,18,500 Lowest |
| 7.00 | Material and labour earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or down in conduit / pipe or fixed to pole or any other indicated situation for loop earthing etc along with porcelian insulator holders fixing with suitable size of screws above ground for complete as required using 32X6 mm GI strip all as specified and as directed. | 795 | RM | 100 ₹79,500 Lowest | 125 ₹99,375 |
| 8.00 | Supply & fixing COP assembly with illuminated push button floor position alarm, non stop door closer, door open, cabin fan, cabin light, stop atendant out key etc in and including 7 segment display with CPI card and stainless steel face plate duly connected with existing control and electric system complete & testing including taking out unserviceable COP assembly complete all as specificed & directed by Engineer in charge.
Make :- OTIS /Veer high Tech Solutions/Leo Elivator or equivalent model of make specified. | 6 | Each Job | 10,000 ₹60,000 Lowest | 27,800 ₹1,66,800 |
| 9.00 | Supply & fixing in replacement LOP assembly with illuminated push button floor position alarm, non stop door closer , door open etc in and including 7 segment display with CPI card and stainless steel face plate duly connected with existing control and electric system complete & testing including taking out unserviceable LOP assembly complete all as specificed & directed by Engineer in charge. Make :- OTIS /Veer high Tech Solutions/Leo Elivator or equivalent model of make specified. | 8 | Each Job | 2,500 ₹20,000 Lowest | 4,800 ₹38,400 |
Tender Value
₹65 L
EMD Value
₹1.2 L
Closing Date
4 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (SUBS) MUMBAI
Commander Works Engineer Subs NCHC Powai Bhandup Post Office Mumbai 400 078
REPAIR/ REPLACEMNT / MAINT OF CERTAIN ITEMS OF LIFT INSTALLED AT NOFRA, JR SAILOR AND SR SAILORS BLOCKS AT NAUSENA BAGH AT PORBANDAR UNDER CWE (SUBS) MUMBAI
2026_MES_780842_1
8931/E8
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
PORBANDAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE (NAVY) PORBANDAR
₹1.2 L
12 Oct 2026
25 Jul 2026
7 Sept 2026
25 Jul 2026
4 Sept 2026
21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive maintenance of electrically operated passenger lifts installed at Junior and Senior Sailor's marrried Accn, Nausena Bagh, lifts in reliable safe and efficient operating condition (Make of Lift : OTIS Model RE-GEN) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance (Monthly, Quarterly, Half yearly and yearly) in systematic and controlled manner suitable for serving Ground + six/ eight floors i.e total seven/ nine landings with electric power operated doors installed complete all as specified and directed for the following lifts:
Nausena Bagh : Building No. P-135 to P-139 Capacity of 08 Passengers lifts - 05 Nos (Total Qty 05 Nos x 11 months = 55 per months) and Bldg No P-128 to P-132 to P-134 Capacity of 08 Passengers lifts-06 Nos (Total qty 6 Nos x 11 Months =66 per months) | - | Each lift Per Month | - | - |
| 2 | Comprehensive maintenance of electrically operated passenger lifts installed at Junior and senior Sailor's marrried Accn, Nausena Bagh, lifts in reliable safe and efficient operating condition (Make of Lift : OTIS Model RE-GEN) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance (Monthly, Quarterly, Halfyearly and yearly) in systematic and controlled manner suitable for serving Ground + six/ eight floors i.e total seven/ nine landings with electric power operated doors installed complete all as specified and directed for the following lifts:
Nausena Bagh : Building No. P-135 to P-139 Capacity of 13 Passengers lifts - 05 Nos (Total Qty 05 Nos x 11 months = 55 per months) Bldg No P-128 to P-132 to P-134 Capacity of 08 Passengers lifts-06 Nos (Total qty 6 Nos x 11 Months =66 per months) | - | Each lift Per Month | - | - |
| 3 | Comprehensive maintenance of electrically operated passenger lifts installed at Officers married Accn, NOFRA, lifts in reliable safe and efficient operating condition (Make TRIO manufactured by M/s TRIO Elevators Co. (India) Pvt. Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance (Monthly, Quarterly), Halfyearly and yearly) in systematic and controlled manner suitable for serving Ground + six floors i.e total seven landings with electric power operated doors installed complete all as specified and directed for the following lifts:
NOFRA : Building No. P-120 to P-122 Capacity of 08 Passengers lifts - 03 Nos
(Total Qty 03 Nos x 11 months = 33 per months) | 33 | Each lift Per Month | - | - |
| 4 | Comprehensive maintenance of electrically operated passenger lifts installed at Senior sailor's married Accn, Nausena Bagh, lifts in reliable safe and efficient operating condition (Make of lift - OTIS Model RE-GEN) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance (Monthly, Quarterly, Halfyearly and yearly) in systematic and controlled manner suitable for serving Ground + seven floors i.e total eight landings with electric power operated doors installed complete all as specified and directed for the following lifts:
Nausena Bagh : Building No. P-131 Capacity of 08 Passenger lifts - 01 No & Capacity of 13 Passenger lifts - 01 No
(Total Qty 02 Nos x 11 months = 22 per months) | 22 | Each lift Per Month | - | - |
| 5 | Comprehensive maintenance of electrically operated passenger lifts installed at Officers married Accn, NOFRA, lifts in reliable safe and efficient operating condition (Make TRIO manufactured by M/s TRIO Elevators Co. (India) Pvt. Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance (Monthly, Quarterly), Halfyearly and yearly) in systematic and controlled manner suitable for serving Ground + six floors i.e total seven landings with electric power operated doors installed complete all as specified and directed for the following lifts:
NOFRA : Block No. P-120 to P-122 Capacity of 13 Passengers lifts - 03 Nos (Total Qty 03 Nos x 11 months = 33 per months) | 33 | Each lift Per Month | - | - |
| 6 | Material and labour for maintainance free environment friendly (Chemical Earthing) earth electrode set comprising of 17.2 mm dia, 3 mtrs long rod of low carbon steel molecular copper bounded for a thickness of 250 micro OHMS, highly conductive ANSI/NSF STD-60 certified carbon bound backfill compound which shall set like concrete according to BS 7430 & IEEE 80 (each bag shall contain 50 lbs) and suitable copper clamp connected to copper earth lead strip of size 20 mm x 3 mm by means of bolts nuts check nuts and washers of tinned copper / brass in addition to brazing of all joints and earth strip protected by GI pipe 40 mm bore light grade complete all as directed by Engineer-in-Charge.
Make: M/s McML Protection Technologies Pvt Ltd / M/s JMV Earthing Equipment Pvt Ltd . M/s JEF Techno Solutions (P) Ltd / M/s Vijetha Earthing System, Hyderabad / M/s Rail Tech Engineering Works, JEF Ecosafe or equivalent as approved by GE.
Note:- The quoted rate is also deemed to be include the cost of the following: -
(i) The earthing shall comply to IS-3043.
(ii) The earth resistance shall be less than one ohm.
(iii) Earth electrode shall be non-corrosive, solid steel round rod of size 17.2 mm dia, 3000mm long, made of high tensile steel with molecularly bonded copper coating of thickness 250 microns on the outside.
(iv) The pit shall be filled with highly conductive and eco friendly ground enhancing carbon based backfill compound suitable for any type of strata. The Earth enhancement material shall be supplied in sealed, moisture proof bags. These bags shall be marked with Manufacturer's name or trade name, quantity, batch No & date of manufacture.
(v) The electrode shall be provided on its top with an earth termination clamp made of electrolytic grade copper, joined by exothermic welding and including connecting the earth conductor with stainless steel nuts, bolts and washers of suitable size. (vi) A 300mm x 300mm PCC chamber with suitable size PCC cover with handle and kept on suitable angle iron frame to place the cover and shall be provided on the top of the earth system. The Chamber shall be flushed with the ground surface and including necessary PCC bed (1:4:8, type D2) at the bottom of chamber. | 27 | Each Job | - | - |
| 7 | Material and labour earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or down in conduit / pipe or fixed to pole or any other indicated situation for loop earthing etc along with porcelian insulator holders fixing with suitable size of screws above ground for complete as required using 32X6 mm GI strip all as specified and as directed. | - | RM | - | - |
| 8 | Supply & fixing COP assembly with illuminated push button floor position alarm, non stop door closer, door open, cabin fan, cabin light, stop atendant out key etc in and including 7 segment display with CPI card and stainless steel face plate duly connected with existing control and electric system complete & testing including taking out unserviceable COP assembly complete all as specificed & directed by Engineer in charge.
Make :- OTIS /Veer high Tech Solutions/Leo Elivator or equivalent model of make specified. | - | Each Job | - | - |
| 9 | Supply & fixing in replacement LOP assembly with illuminated push button floor position alarm, non stop door closer , door open etc in and including 7 segment display with CPI card and stainless steel face plate duly connected with existing control and electric system complete & testing including taking out unserviceable LOP assembly complete all as specificed & directed by Engineer in charge. Make :- OTIS /Veer high Tech Solutions/Leo Elivator or equivalent model of make specified. | - | Each Job | - | - |
| 10 | Supply and fixing in repair/replacement lift belt suitable for 08 passenger lift in replacement complete all as specified and directed by Engr-in-charge.Make :-As per sample approved by GE. | - | Each Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tenderdocus.pdf
Tender Documents • 0.93 MB
BOQ_874708.xls
BOQ • 0.43 MB
Amdt1.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .