| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-Finance | ₹2.4 Cr | L1 | Accepted-Finance Accept |
| 2 | L2₹2.5 CrRejected-Finance 5 A WEST REST CAMP DEHRADUN | ₹2.5 Cr | L2 | Rejected-Finance Reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-HARD COPY NOT RECEIVED |
| Sl No | Description | Qty | Unit | M/S DOON INFRASTRUCTURE L2 | Harpal Singh Kishor Singh L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per
Technical Specification Clause 302. | 1,687.5 | Cum | 58 ₹97,875 | 52 ₹87,750 |
| 2.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. P.C.C grade M 15. | 785.3 | Cum | 5,800 ₹45.5 L | 5,538 ₹43.5 L |
| 3.00 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision '2014) and IS 1786:2008 clause no. 1.6) | 33.15 | M.T. | 82,800 ₹27.4 L | 81,500 ₹27.0 L |
| 4.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all
material, labour, T&P etc. required for proper completion of the work. as per drawings and
technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | 3,965.8 | Cum | 4,200 ₹1.7 Cr | 4,029 ₹1.6 Cr |
| 5.00 | Hand Packed stone filling in back of wallls including cost of all materials, royality,
T&P etc. complete as per direction of Engineer-in- charge. (As per PWD
Uttarakhand specifications) | 270 | Cum | 1,010 ₹2.7 L | 965 ₹2.6 L |
| 6.00 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) GI wire 8 gauge BWG | 195.75 | Cum | 1,975 ₹3.9 L | 1,855 ₹3.6 L |
Tender Value
Refer Docs
EMD Value
₹5.7 L
Closing Date
3 Feb 2024, 12:00 pmClosed
SE 12TH CIRCLE PWD PAURI
SE 12TH CIRCLE PWD PAURI
Protection work of 300 m span double lane bridge on Sukhrao river near BEL on Kaudia Motadhak motor road under Dugadda development block of Kotdwar assembly of Pauri Garhwal district under state sector plan.
2024_pwd_68059_3
246/141yata 12/2022-23 date 18-01-2024
Open Tender
Civil Works - Bridges
90 days
dugadda
as per technical bid
3 documents required · 3 mandatory
₹5,900
EE CD PWD DUGADDA
₹5.7 L
SE 12TH CIRCLE PWD PAURI
17 Feb 2026
22 Jan 2024
3 Feb 2024
22 Jan 2024
3 Feb 2024
27 Jan 2024
27 Jan 2024
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. P.C.C grade M 15.
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision '2014) and IS 1786:2008 clause no. 1.6)
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) GI wire 8 gauge BWG
M/S DOON INFRASTRUCTURE
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx