Loading…
Loading…
Tender Value
₹23.0 L
EMD Value
₹45,904
Closing Date
7 Jul 2026, 3:00 pmClosed
O/O the Executive Engineer, Div-III, AM
Executive Engineer, Div-III, AM
Construction of new CC road with soling and cover drain from the H.O Pavitra Mohan Das to H.O Sankar Sengupta of Sukanta Palli ,under ward NO 48 AMC.
2026_SAMC_74246_1
18/Div-III/AMC/2026-27
Open Tender
Civil Works
Percentage
AMC
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
₹45,904
Yes
1 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
7 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavation)/manual means in foundation frenches or drains not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead of 50 m All kind of soi | 1 | cum | 1 | ₹1 |
| 2 | Supplying and filling in plinth under floor foundation etc with snd fine from local quarry with all lift includingspreading in horizontal layer watering gradng to required slop ramming consolidating and compacting each layer by usingplate compactor or by any suitable method complete. | - | cum | 1 | - |
| 3 | Providing and laying dry flat brick flooring in required pattern completed. | - | sqm | - | - |
| 4 | Providing and laying in position cement concrete of specified grde excluding the cost of centering and shuttering All work upto plinth level 1:3:6( 1cement:3 fine sand:6 geded well burnt brick aggregate 20 mm niminal size) | - | cum | - | - |
| 5 | First class brick work in foundation and plinth
including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 0.04 | cum | - | - |
| 6 | 12mm cement plaster of mix In cement mortar 1:4( 1cement:4 fine sand) including Neat cement punning | - | sqm | - | - |
| 7 | Providing and laying in position cement concrete of specified grde excluding the cost of centering and shuttering All work upto plinth level 1:2:4( 1cement:2 fine sand:4 graded stone aggregate 20 mm niminal size) | - | cum | - | - |
| 8 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m :
-All kinds of soil | - | cum | - | - |
| 9 | Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centring, shuttering, finishing and reinforcement-
-All work upto plinth level:1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | sqm | - | - |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for:Walls (any thickness) including attached pilasters,
buttresses, plinth and string courses etc. using shuttering ply | - | sqm | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
DNIT48.pdf
Tender Documents • 4.09 MB
BOQ_75564.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .