Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
₹8.4 L
EMD Value
₹20,928
Closing Date
29 Jan 2025, 11:00 amClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer Buildings Sub Division Maintenance
Maintenance Work
2025_PWD_729616_1
E66/PWD/BLDG/TR/15428/2024 5 1 1/1
Open Tender
Civil Works - Buildings
Item Rate
90 days
PALAYAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,850
Yes
₹20,928
Yes
28 Feb 2025
23 Jan 2025
31 Jan 2025
23 Jan 2025
29 Jan 2025
23 Jan 2025
Amount
Estimate
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.16.3:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 3 m but not exceeding 4.5 m
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
OD132588/2024-2025:Random rubble masonry with hard department stone in foundation and plinth including levelling up with cement concrete 1: 6:12 (1 cement : 6 course sand : 12 graded stone aggregate 20mmnominal size) up to plinth level with cement mortar 1:6( 1 cement : 6 course sand)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
13.5.1:15 mm cement plaster on rough side of single or half brick wall of mix:1:4 ( 1 Cement : 4 coarse sand)
16.19:Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
OD132605/2024-2025:Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire in spiral shape and horizontal direction
OD132731/2024-2025:Labour engaged for removing waste materials and other petty repairs.
OD230305/2024-2025:Cutting branches of trees overhanging above any structures of grith below 30 cm including stacking of serviceable materials cost of labour, hire charges of rope and pulley etc.
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
ANANDRAJ R S (BID ID -2081653)
SURESH KUMAR G S (BID ID -2081505)
Bidder Name
SURESH KUMAR G S
Johny John j k
ANANDRAJ R S
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1163122.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .