| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | ₹7.0 L | L1 | Accepted-AOC below rate |
| 2 | L2₹7.1 LRejected-AOC | ₹7.1 L | L2 | Rejected-AOC above rate |
| Sl No | Description | Qty | Unit | TAMILNADU WATER SUPPLYS & DRAINAGE SYSTEM L1 | JPCNAMAKKAL L2 |
|---|---|---|---|---|---|
| 1.00 | Providing BT road cutting for pipe line trench work .including al cost of materials,labours, etc.,complete with as per standard specifications. | 68 | Cum | 929 ₹63,172 | 930 ₹63,240 |
| 2.00 | Earthwork excavation in Hard stiff clay,stiff black cotton soil, hard red earth, shales, murams, gravel, stoney earth, and earth mixed with 50% fair size boulders and hard gravelly soil -SS20B for laying sewer pipes (IS 3764: 1992) excluding refilling, but including hand bailing out water wherever necessary and all other incidental charges. etc. complete and as directed by the Engineer in charge. | 374 | Cum | 205 ₹76,670 | 206 ₹77,044 |
| 3.00Construction of UGSS manhole cover upto proposed road level of size 0.90m x1.20m Upto 1.50M to 2.00M hight including cost of Earth excavation, steel, centering and shuttering, RCC1:1.5:3 mix (One cement, one and half and three coare aggregate) using 20mm ISS size HBG metak for wall and PCC1:1.5:3 mix (One cement, one and half sand and three coarse aggreagate) using 20mm ISS size HBG metal, New FRCC extra heavy manhole cover set etc., including cost and conveyance of all materials to site, labours charges fixing of manhole cover etc., Complete as directed by the departmental officers. | |||||
| 3.01 | 0.75M Depth | 6 | Nos | 20,551 ₹1.2 L | 20,551 ₹1.2 L |
| 3.02 | 1.00M Depth | 6 | Nos | 23,094 ₹1.4 L | 23,094 ₹1.4 L |
| 3.03 | 1.50M Depth | 2 | Nos | 28,574 ₹57,148 | 28,574 ₹57,148 |
| 4.00 | Barricading work for laying of UGSS line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including tying the vertical and horizontal poles with coir rope including fixing charges including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete | 518 | Meter | 58 ₹30,044 | 59 ₹30,562 |
| 5.00 | Supply and delivery of UPVC pipes for sewerage SN8-SDR 34(S 16.5) conforming to IS : 15328/2003 including Unloading, stacking at stock yard and Conveyance from stock yard to site etc.,complete as directed by the departmental officers. | 420 | Meter | 439 ₹1.8 L | 441 ₹1.9 L |
| 6.00 | Lowering 160mm dia UPVC pipe and specials to trench and laying to proper grade and alignment and as directed by the departmental officers. | 420 | Meter | 31 ₹13,020 | 33.5 ₹14,070 |
| 7.00 | Refilling excavated earth other than sand compliying with standard specification including materials, labour for filling charges,consolidation etc. complete as directed by the departmental officers. | 441 | Cum | 42 ₹18,522 | 43.5 ₹19,183.50 |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
14 Aug 2025, 3:00 pmClosed
Commissioner
Azad Road,Karur
Construction of UGD Main line at Kothur Main Road to Univercel Garden Ward 1 Zone 1 karur city municipal corporation
2025_MAWS_591725_11
E1/3388/2025
Open Tender
Civil Works
60 days
KCMC
Pre qualification and EMD scan copy
2 documents required · 2 mandatory
₹0
₹8,500
29 Apr 2026
14 Aug 2025
14 Aug 2025
14 Aug 2025
14 Aug 2025
14 Aug 2025
14 Aug 2025 - 14 Aug 2025
Amount
Providing BT road cutting for pipe line trench work .including al cost of materials,labours, etc.,complete with as per standard specifications.
Earthwork excavation in Hard stiff clay,stiff black cotton soil, hard red earth, shales, murams, gravel, stoney earth, and earth mixed with 50% fair size boulders and hard gravelly soil -SS20B for laying sewer pipes (IS 3764: 1992) excluding refilling, but including hand bailing out water wherever necessary and all other incidental charges. etc. complete and as directed by the Engineer in charge.
Construction of UGSS manhole cover upto proposed road level of size 0.90m x1.20m Upto 1.50M to 2.00M hight including cost of Earth excavation, steel, centering and shuttering, RCC1:1.5:3 mix (One cement, one and half and three coare aggregate) using 20mm ISS size HBG metak for wall and PCC1:1.5:3 mix (One cement, one and half sand and three coarse aggreagate) using 20mm ISS size HBG metal, New FRCC extra heavy manhole cover set etc., including cost and conveyance of all materials to site, labours charges fixing of manhole cover etc., Complete as directed by the departmental officers.
0.75M Depth
1.00M Depth
1.50M Depth
Barricading work for laying of UGSS line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including tying the vertical and horizontal poles with coir rope including fixing charges including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete
Supply and delivery of UPVC pipes for sewerage SN8-SDR 34(S 16.5) conforming to IS : 15328/2003 including Unloading, stacking at stock yard and Conveyance from stock yard to site etc.,complete as directed by the departmental officers.
Lowering 160mm dia UPVC pipe and specials to trench and laying to proper grade and alignment and as directed by the departmental officers.
Refilling excavated earth other than sand compliying with standard specification including materials, labour for filling charges,consolidation etc. complete as directed by the departmental officers.
JPCNAMAKKAL (BID ID -1429842)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
BOQ_707808.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid