Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.6 L+₹10,107.95 (1.84%)Rejected-Finance MANJAPRA 683 581 EKM DIST | ERNAKULAM | KERALA | 683581 | L2 | Rejected-Finance L2 |
Tender Value
₹5.1 L
EMD Value
₹12,710
Closing Date
31 Jan 2023, 3:00 pmClosed
Assistant Engineer
O/o Asst Exe Engineer,Angamaly Municipality
Project no 248/23 Renovation of Public Pond In Ward 23,Angamaly Municipality
2023_LSGD_550238_6
Annual plan 2022-23(4)
Open Tender
Civil Works - Water Works
Item Rate
120 days
angamaly
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,125
₹12,710
16 Jul 2023
23 Jan 2023
31 Jan 2023
23 Jan 2023
31 Jan 2023
23 Jan 2023
23 Jan 2023 - 30 Jan 2023
Amount
Renovation of Pond
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD317865/2022-2023:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
OD314309/2022-2023:Departmental RR - Random rubble masonry with departmental hard stone in foundation and plinth including levelling up upto plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)-Modified 7.1.1
OD314312/2022-2023:Random rubble masonry with hard stone in foundation and plinth including levelling up upto plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand)-Modified 7.1.1
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
SANEESH KURIAKOSE
Bidder Name
P. RAMESAN
SANEESH KURIAKOSE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_808837.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .