Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.5 CrAdmitted-Finance A 201 EVERARD TOWERS EASTERN EXPRESS HIGHWAY SION MUMBAI MUMBAI MAHARASHTRA 400022 | MUMBAI | MAHARASHTRA | 400022 | L1 | Admitted-Finance | |
| 2 | L2₹75.7 Cr+₹3.2 Cr (4.42%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹81.3 Cr+₹8.8 Cr (12.1%)Admitted-Finance HADAPSAR INDUSTRIAL ESTATE HADAPSAR INDUSTRIAL ESTATE HADAPSAR POST OFFICE HADAPSAR PUNE MAHARASHTRA 411013 | PUNE | MAHARASHTRA | 411013 | L3 | Admitted-Finance | |
| 4 | L4₹87.5 Cr+₹15.0 Cr (20.7%)Admitted-Finance KUTAIL MOD KUTAL TEHSIL GHARAUNDA KARNAL KARNAL HARYANA 132001 | KARNAL | HARYANA | 132001 | L4 | Admitted-Finance | |
| 5 | L5₹88.2 Cr+₹15.6 Cr (21.6%)Admitted-Finance 501 ANDHERI EAST SAMARPAN COMPLEX NEW LINK ROAD VILLAGE TOWN CHAKALA CITY MUMBAI MUMBAI MAHARASHTRA 400099 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400099 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JYOTECH ENGINEERING AND MARKETING CONSULTANTS L6 | INDIAN COMPRESSORS LIMITED L7 | IDEATE INFORMATICS LLP L4 | Kirloskar Pneumatic Company Limited L3 | TGT Fuel Technologies Private Limited L8 | SUNPOWERGEN ENGINEERING PRIVATE LIMITED L5 | EUROTEC ENGINEERING CORPORATION PVT LTD L9 | SOPAN O AND M CO PVT KTD L2 | KAL ENERGY INDIA PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Design, Engineering, Manufacturing, Supply including packaging and forwarding, insurance, custom clearance, handling and unloading at port as well as MNGL’s site/store of skid mounted 22 KW electric motor driven 250 SCMH Hydraulic CNG booster Compressor Package, Freight, loading-unloading charges of 22 KW Motor Driven CNG Hydraulic Booster Compressor & auxiliaries | 88 | Nos. | 43,48,000 ₹45,77,26,720 | 41,31,000 ₹43,98,66,240 | 46,50,000 ₹49,42,78,400 | 41,00,000 ₹43,35,32,000 | 47,65,000 ₹50,36,24,000 | 45,27,500 ₹48,10,38,800 | 47,36,617 ₹50,43,11,109.28 | 43,00,000 ₹45,43,00,000 | 40,00,000 ₹41,53,60,000 Lowest |
| 1.02 | Special tools & tackles | 88 | Nos. | - | 5,000 ₹5,19,200 Lowest | 10,000 ₹10,38,400 | - | - | 20,000 ₹20,76,800 | 9,999.35 ₹11,42,171.36 | 10,000 ₹10,38,400 | 5,000 ₹5,19,200 Lowest |
| 1.03 | Design, Engineering, Manufacturing, Supply (including Packaging and forwarding, insurance, custom clearance, handling and unloading at port as well as MNGL’s store/site) of 1.5 KW electric motor driven air compressors with dryer and receiver. | 88 | Nos. | 60,000 ₹62,30,400 | 81,000 ₹84,11,040 | 70,000 ₹72,68,800 | 1,00,000 ₹1,03,84,000 | 1,15,000 ₹1,19,41,600 | 89,000 ₹92,41,760 | 90,000 ₹94,49,440 | 50,000 ₹51,92,000 | 15,000 ₹15,57,600 Lowest |
| 1.04 | Installation, commissioning & field performance test of compressor package at site | 88 | Nos. | 55,000 ₹57,11,200 | 1,60,000 ₹1,66,14,400 | 75,000 ₹77,88,000 | 75,000 ₹77,88,000 | 1,35,000 ₹1,40,18,400 | 90,000 ₹93,45,600 | 1,65,000 ₹1,71,33,600 | 60,000 ₹62,30,400 | 25,000 ₹25,96,000 Lowest |
| 1.05SITE ACTIVITY | ||||||||||||
| 1.06 | Lump sum Operation During Warranty Period: One operator in 1 shift of 8 hours 365 Days including Sunday & all holiday. The shift timing shall be defined by the EIC of MNGL. In case the operations period exceeds for more than 1 shift then payment shall be made on proportionate basis as per prices quoted by the bidder. Note: Operation shall be optional and may or may not be awarded. | 88 | Lump sum | 2,40,000 ₹2,49,21,600 | 4,08,000 ₹4,23,66,720 | 1,56,252 ₹1,62,25,207.68 Lowest | 2,64,000 ₹2,74,13,760 | 3,00,000 ₹3,11,52,000 | 2,16,000 ₹2,24,29,440 | 2,70,000 ₹2,80,36,800 | 1,92,000 ₹1,99,37,280 | 3,24,000 ₹3,36,44,160 |
| 1.07 | Lump sum Operation Second Year Period: One operator in 1 shift of 8 hours 365 Days including Sunday & all holiday. The shift timing shall be defined by the EIC of MNGL. In case the operations period exceeds for more than 1 shift then payment shall be made on proportionate basis as per prices quoted by the bidder.
Note: Operation shall be optional and may or may not be awarded. | 88 | Lump sum | 2,64,000 ₹2,74,13,760 | 4,28,400 ₹4,44,85,056 | 1,71,876 ₹1,78,47,603.84 Lowest | 2,90,400 ₹3,01,55,136 | 3,15,000 ₹3,27,09,600 | 2,40,000 ₹2,49,21,600 | 2,97,000 ₹3,08,40,480 | 1,99,680 ₹2,07,34,771.2 | 3,24,000 ₹3,36,44,160 |
| 1.08 | Lump sum Operation Third Year Period: One operator in 1 shift of 8 hours 365 Days including Sunday & all holiday. The shift timing shall be defined by the EIC of MNGL. In case the operations period exceeds for more than 1 shift then payment shall be made on proportionate basis as per prices quoted by the bidder.
Note: Operation shall be optional and may or may not be awarded. | 88 | Lump sum | 2,76,000 ₹2,86,59,840 | 4,54,104 ₹4,71,54,159.36 | 1,87,500 ₹1,94,70,000 Lowest | 3,19,440 ₹3,31,70,649.6 | 3,30,780 ₹3,43,48,195.2 | 2,64,000 ₹2,74,13,760 | 3,26,000 ₹3,38,51,840 | 2,07,667 ₹2,15,64,141.28 | 3,24,000 ₹3,36,44,160 |
| 1.09 | Lump sum Operation Fourth Year Period: One operator in 1 shift of 8 hours 365 Days including Sunday & all holiday. The shift timing shall be defined by the EIC of MNGL. In case the operations period exceeds for more than 1 shift then payment shall be made on proportionate basis as per prices quoted by the bidder.
Note: Operation shall be optional and may or may not be awarded. | 88 | Lump sum | 2,64,000 ₹2,74,13,760 | 4,81,356 ₹4,99,84,007.04 | 2,03,124 ₹2,10,92,396.16 Lowest | 3,51,384 ₹3,64,87,714.56 | 3,47,340 ₹3,60,67,785.6 | 2,88,000 ₹2,99,05,920 | 3,59,000 ₹3,72,78,560 | 2,15,974 ₹2,24,26,740.16 | 3,24,000 ₹3,36,44,160 |
| 1.10 | Lump sum Operation Fifth Year Period: One operator in 1 shift of 8 hours 365 Days including Sunday & all holiday. The shift timing shall be defined by the EIC of MNGL. In case the operations period exceeds for more than 1 shift then payment shall be made on proportionate basis as per prices quoted by the bidder.
Note: Operation shall be optional and may or may not be awarded. | 88 | Lump sum | 2,88,000 ₹2,99,05,920 | 5,07,600 ₹5,27,09,184 | 2,18,748 ₹2,27,14,792.32 Lowest | 3,86,522 ₹4,01,36,444.48 | 3,64,740 ₹3,78,74,601.6 | 3,12,000 ₹3,23,98,080 | 3,95,000 ₹4,10,16,800 | 2,24,613 ₹2,33,23,813.92 | 3,24,000 ₹3,36,44,160 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
6 Feb 2023, 3:00 pmClosed
CHIEF MANAGER (CP)
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune-411045
Annual Rate Contract for procurement of 22 KW Electric Motor Driven 250 SCMH capacity Hydraulic Booster Compressor for CNG and CGD Network of MNGL for Pune, Nashik, Nanded and Nizamabad GA
2023_MNGL_141808_1
MNGL/CP/2022-23/183
Open Tender
Miscellaneous Services
Supply
365 days
Nashik, Nanded and Nizamabad
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹2 L
Yes
MNGL, Baner, Pune
23 Feb 2023
16 Jan 2023
7 Feb 2023
16 Jan 2023
6 Feb 2023
16 Jan 2023
23 Jan 2023
Amount
Design, Engineering, Manufacturing, Supply including packaging and forwarding, insurance, custom clearance, handling and unloading at port as well as MNGL’s site/store of skid mounted 22 KW electric motor driven 250 SCMH Hydraulic CNG booster Compressor Package, Freight, loading-unloading charges of 22 KW Motor Driven CNG Hydraulic Booster Compressor & auxiliaries
Special tools & tackles
Design, Engineering, Manufacturing, Supply (including Packaging and forwarding, insurance, custom clearance, handling and unloading at port as well as MNGL’s store/site) of 1.5 KW electric motor driven air compressors with dryer and receiver.
Installation, commissioning & field performance test of compressor package at site
SITE ACTIVITY
Lump sum Operation During Warranty Period: One operator in 1 shift of 8 hours 365 Days including Sunday & all holiday. The shift timing shall be defined by the EIC of MNGL. In case the operations period exceeds for more than 1 shift then payment shall be made on proportionate basis as per prices quoted by the bidder. Note: Operation shall be optional and may or may not be awarded.
Lump sum Operation Second Year Period: One operator in 1 shift of 8 hours 365 Days including Sunday & all holiday. The shift timing shall be defined by the EIC of MNGL. In case the operations period exceeds for more than 1 shift then payment shall be made on proportionate basis as per prices quoted by the bidder. Note: Operation shall be optional and may or may not be awarded.
Lump sum Operation Third Year Period: One operator in 1 shift of 8 hours 365 Days including Sunday & all holiday. The shift timing shall be defined by the EIC of MNGL. In case the operations period exceeds for more than 1 shift then payment shall be made on proportionate basis as per prices quoted by the bidder. Note: Operation shall be optional and may or may not be awarded.
Lump sum Operation Fourth Year Period: One operator in 1 shift of 8 hours 365 Days including Sunday & all holiday. The shift timing shall be defined by the EIC of MNGL. In case the operations period exceeds for more than 1 shift then payment shall be made on proportionate basis as per prices quoted by the bidder. Note: Operation shall be optional and may or may not be awarded.
Lump sum Operation Fifth Year Period: One operator in 1 shift of 8 hours 365 Days including Sunday & all holiday. The shift timing shall be defined by the EIC of MNGL. In case the operations period exceeds for more than 1 shift then payment shall be made on proportionate basis as per prices quoted by the bidder. Note: Operation shall be optional and may or may not be awarded.
Lump-sum Annual repair & Maintenance charges during warranty period of 1 (One) year inclusive of all Consumable, Manpower, spares, lubricants but excluding electric power charges.
Lump-sum Annual repair & Maintenance charges for second year i.e. after first year of warranty period inclusive of all consumables, manpower, spares, lubricants but excluding electric power charges.
Lump-sum Annual repair & Maintenance charges for third year i.e. after first year of warranty period and second year AMC inclusive of all consumables, manpower, spares, lubricants but excluding electric power charges.
Lump-sum Annual repair & Maintenance charges for fourth year i.e. after first year of warranty period, second & third year AMC inclusive of all consumables, manpower, spares, lubricants but excluding electric power charges.
Lump-sum Annual repair & Maintenance charges for fifth year i.e. after first year of warranty period, second, third & fourth year AMC inclusive of all consumables, manpower, spares, lubricants but excluding electric power charges.
SOPAN O AND M CO PVT KTD
Kirloskar Pneumatic Company Limited
IDEATE INFORMATICS LLP
SUNPOWERGEN ENGINEERING PRIVATE LIMITED
JYOTECH ENGINEERING AND MARKETING CONSULTANTS
INDIAN COMPRESSORS LIMITED
TGT Fuel Technologies Private Limited
EUROTEC ENGINEERING CORPORATION PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .