Loading…
Loading…
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
23 Feb 2026, 6:00 pmClosed
Assistant Manager (North West Zone)
Providing And Laying Drainage Line Work and Construction of Machinehole work of Drainage line And Other Maintance Work at T.P.Scheme no.37,38, 53-A and Other Different T.P. road and Gamtal area in Thaltej ward in North West Zone.
275142
NWZ/TN/09/2526/97
Open
Civil Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹1,500
Yes
Municipal Commissioner, Ahmedabad
₹30,000
Yes
10 Feb 2026
10 Feb 2026
10 Feb 2026
23 Feb 2026
10 Feb 2026
Name of Work Providing And Laying Drainage Line Work and
Construction of Machinehole work of Drainage line And
Other Maintance Work at T.P.Scheme no.37,38, 53-A
and Other Different T.P. road and Gamtal area in Thaltej
ward in North West Zone.
Estimate contract value(INR) Rs.
Period of Completion 12 Months (Excluding Monsoon)
Bidding Type Open/Limited
Tender Currency Type --------------
Tender Currency Settings --------------
Joint venture Applicable/Not Applicable
Rebate Applicable/Not Applicable
Amount Details:
Bid Document Fee: Rs.1500.00
Bid Document Fee Payable to: Municipal Commissioner, Ahmedabad
Bid Security/ EMD (INR) Rs.30000.00
Bid Security/ EMD In Favor of Municipal Commissioner, Ahmedabad
Bid Document Downloading Start Dates Automatic System Generated
Bid Document Downloading Start Dates Automatic System Generated
Pre Bid Meeting ___/___/____ ;___;____ Hrs
Last Date & Time for Receipt of Bids
Bid Validity Period 180 Days
Remaks Submission of EMD.Tender fee and Other Documents
during office hours : On date 24.02.26 & 17:00 Hrs. in the
Office of Assistant Manager (North West Zone Office,
Rajmata vijyaraje Sindhiya bhavan,Nr.Atithi dining
hall,Judjes bunglow road, Bodakdev
Bid Opening Date 25.02.26 ; 12:00 Hrs.
Officer Inviting Bids: Assistant Manager (North West Zone)
Bid Opening Authority: Assistant Manager (North West Zone)
Address: Rajmata vijyaraje Sindhiya bhavan, Nr. Atithi dining
hall, Judjes bungalow road, Bodakdev
Contact details: 079-32981396
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – W•th vrùbÍtul
y.Bgw.ftu. W. Ítul Ítulj ytuVem,
yr<&e ntuxjlt Ftkatbtk, sSm ckdjt htuz, ctuzfœuJ, ybœtJtœ.
W•th vrùb Ítul xuLzh ltuxem lk- 09/2025-26 btk ytJhe juJtguj ftbtule ÂJd<tu
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk
btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf
mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch,
xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkc< yJ~g œNtoJJtlt hnuNu. su ftuLx[tfxh©eytuyu hSMx[uNl
heLgw fhtJuj l ntug <u ftuLx[tfxh©eyu xuLzh ChJt lnek.
4. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s
MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb
btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu
R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu
10. Nh<e xuLzhtu hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble
BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ xuLzhhu juJe.
12. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx,
vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb
btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne
mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
16. mœh xuLzhle ytRxbtult CtJtu ltKt Ft<tlt mhfgwjh lk.38, <t.21/11/2022 <&t mûtb m•ttle b¤uj bkswhe bwsc GST
rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt vtºt &Nu su&e <btb cezomu <u bwsc dK<he fhe xuLzhtu
1. mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu JF< <h mw^thtytu
vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “Bgwrlrmvj frb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
As per Government of Gujarat G.R.No.- EMD/10/2021/7729/DMO Dt.28/06/2021 & Circular of Finance
Department, AMC No.41, Date: 08/02/2022, approved Banks are.
(A)Guarantee issued by following banks will be accepted as SD/EMD on permanent basis.
All nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to March- 31,
The validity cut-off date in the GR is with respect to the date of issue of Bank Guarantee irrespective of
the date of termination of Bank Guarantee.
1 Commercial Banks :-
1. A U Small Finance Bank
3. City Union Bank
4. DBS Bank India Limited
6. Equitas Small Finance Bank
7. Federal Bank
10.IndusInd Bank
11.Kotak Mahindra Bank
12.Standard Chartered Bank
13.Tamilnadu Mercantile Bank
14.Bandhan Bank
18.Karnataka Bank
19.Krur Vysya Bank
20.South Indian Bank
21.Utkarsh Small Finance Bank
2 Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. Saurashtra Gramin Bank
7. The Gujarat State Co-Operative Bank
8. The Mehsana Urban Co-operative Bank Limited
9. The Surat District Co-operative Bank
10.The Surat Peoples Co-operative Bank
11.SVC Co-operative Bank LTD.
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, <t.26.02.2015
bwsc <btb «fthle fLmx[fNlle yufxeJexebtk bwÏg ftuLx[tfxh,mc ftuLx[tfxhlt su bswhtu
ftbdehe fh<t ntug <u <btb bswhtulwk dwsht< rcÕzekd yuLz y^h fLmx[fNl Jfombtk
hSMx[uNl fhtJJwk VhSgt< Au.
Tender Fee : Rs.1500.00 Date of submission : 23.02.26 Time : 18:00 Hrs.
Earnest Money : Rs.30000.00 Date of Opening : 25.02.26 Time : 12:00 Hrs.
Contractor’s Name & Address
Name of work:- Providing And Laying Drainage Line Work and Construction of Machinehole work
of Drainage line And Other Maintance Work at T.P.Scheme no.37,38, 53-A and Other Different T.P.
road and Gamtal area in Thaltej ward in North West Zone.
Item Description Rate
QTY (w/o GST) Per Amount
Excavation for pipe line trenches for water
supply, sewerage line, manhole etc. all with
shoring and struting if required as per required
gradient and line including safety provisions
using site rails and stacking excavated stuff
including up to all required lead cleaning the site
etc. complete for all lifts and strata as specified.
In all sorts of soil and soft murrum.
a 480 0 to 1.5 meter depth. 79.46 Cu.M
b 140 1.5 to 3 meter depth. 87.50 Cu.M
c 50 3 to 4.50 meter depth. 91.96 Cu.M
d 30 4.50 to 6.00 meter depth. 97.32 Cu.M
Extra rate over item of excavation of earth if
excavation is to be done in wet condition
without resorting to pumping but incl. of bailing
Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including
demolishing the asphalt carpet, metal,
soiling/cutting Reinforcement etc.comp. with
stacking the material as directed.
a 140 up to 0.20 meter thickness (By Manual) 71.10 Smt
Up to 0.30 meter (By any type of Breaker
b 85 Machine or R.C.C.Cutter machine including cost 177.76 Smt
of operator, fuel, & transportation etc complete.
0.30 meter & above (By any type of Breaker
c 90 Machine or R.C.C.Cutter machine including cost 311.08 Smt
of operator, fuel, & transportation etc complete.
Filling available excavated earth (excluding
rock) in trenches, plinth, sides of foundations
4 605 etc. in layers not exceeding 20 cm. in depth 22.00 Cu.M
consolidation each deposited layer by ramming
Conveyance charge of earth, lime, murrum,
building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any kind
5 executed outside the road site. Rate also includes
spreading & levelling etc complete. Internal
conveyance above 50 mt done within the work
site is not payable.
a 0 a) Lead up to 1 Km. 23.38 Cu.M
b 0 b) Lead From 1Km to 2 Km. 30.94 Cu.M
c 0 c) Lead From 2 Km to 3 Km. 38.37 Cu.M
d 0 d) Lead From 3 Km to 4 Km. 45.52 Cu.M
e 810 e) Lead From 4 Km to 5 Km. 52.42 Cu.M
f 12.72 f) Lead From 5 Km to 10 Km. 78.54 Cu.M
g 0 g) Lead From 10 Km to 15 Km. 104.65 Cu.M
Providing and supplying,and jointing ISI mark
only standard length stoneware pipes of
following class and diameter including
excavation for laying of pipes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
6 departmental stores, stacking etc. compl.
(IS651/1989 or its latest revision) including
labour work for lowering, laying, joiting with
cement mortar (1:1) proportion, proper postion,
grade and alignment and all level as directed by
engineer in charge including store to site of work
jointing material etc complete.
a 10 100 mm dia 165.52 Rmt
b 11 150 mm dia 242.98 Rmt
c 53 230 mm dia 400.54 Rmt
Providing & Supplying ISI Standard RCC pipes
(of sulphate resisting cement) in a standard
lengths of following class & dia meter suitable
for socket-spigot type including all taxes
insurance, transporation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to departmental stores, staking etc
complete (IS 458:1989) Class NP-3, test
pressure 0.7/kg/sqcm. Rate also includes
supplying RCC collar for RCC pipes including
taxes, carting, loading, unloading, etc complete.
Including labour work for lowering, laying,
jointing, RCC pipes in CM 1:1 1/2 of following
diameters in proper position, grade and alignent
at all as directed by engineer in charge. (RCC
pipe Horizontal cast)
a 455 300 mm internal diameter 888.37 Rmt
b 36 450 mm internal diameter 1539.32 Rmt
c 35 600 mm internal diameter 2212.85 Rmt
d 25 900 mm internal diameter 3601.00 Rmt
e 28 1200 mm internal diameter 5899.00 Rmt
Constructing Chamber of following size
including excavation, refilling, BBCC (1:5:10)
for foundation, C.C.Channel (1:2:4), finished
8 mm thick cement plaster inside in CM 1:3,
finishing with cement slurry, Brick masonary in
CM 1:5 & excluding the cost of chamber seat
cover etc.completed.
0.60 X 0.45 mt. size Inside Clear, Depth
a 4 from 0.0 to 0.90 meter 2261.61 No.
0.60 X 0.75 mt. size Inside Clear, Depth
b 4 from 0.0 to 0.90 meter. 2874.11 No.
0.75 X 0.75 mt. size (Inside Clear) Depth from
Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation, Refilling,
Brick Bats Cement Concrete (1:5:10) of
thickness 15 C.M., CC Channel (1:2:4) of
thickness 10 C.M., finished 15 mm thick cement
plaster inside & outside (Only for shaft) In Cm
1:3, Finishing With Cement Slurry, P/F 4 Mm
Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C At
35 Cm Staggered Masonary In Cm 1:5, Rcc Slab
In Cc1:1.5:3 of thickness 15 C.M.,Including
Cantering & Reinforcement (Single jalli at
C.M. c/c bothway 10 mm dia.)But Excluding
The Cost Of Manhole Seat Cover
Etc..Completed Of Size 0.75 X 1.00 Meter
(Inside Clear, M.H. length should be parallel to
a 7 1.00 to 2.00 meter depth, (Slab at Ground level) 5651.79 No.
2.00 to 3.00 meter depth, (Slab at below 0.60 mt.
b 2 From G.L.) 11395.54 No.
Rate reduction over item of Constructing Slab
Type M.H. Chamber of size 1.00 x 0.75 mt for
10 1 constructing slab @ depth more than 0.60 mt 460.71 DM
below Ground Level (Max. 3 unit of DM should
be reduced in this item)
Constructing Slab type M.H. Chamber of the
following size including excavation, refilling,
brick bats cement concrete (1:5:10) of thickness
15 C.M., CC Channel (1:2:4) of thickness
C.M., finished 15 mm thick cement plaster
inside & outside (Only for shaft) in CM 1:3,
finishing with cement slurry, P/F 4 mm dia
11 M.S.Steel HDPE coated steps 35 cm c/c at
cm staggered in masonary CM 1:5, RCC Slab in
CC 1:1.5:3 of thickness 23 C.M., including
Cantering & reinforcement (double jalli at
C.M. c/c bothway 12 mm dia.) but excluding the
cost of Manhole seat cover etc..completed. of
Size 1.00 X 1.40 meter (Inside Clear, M.H.
length should be parallel to the flow.
a 20 1.00 to 2.00 meter depth, (Slab at Ground level) 10177.68 No.
2.00 to 3.00 meter depth, (Slab at below 0.6 mt.
b 6 From G.L.) 19258.04 No.
3.00 to 4.00 meter depth, (Slab at below 1.00 mt.
c 4 From G.L.) 26867.86 No.
Constructing Scrapper Slab Type M.H. Chamber of
following size incl. excavation, refilling, brick bats
cement concrete (1:5:10) of thickness 15 C.M., C.C.
channel (1:2:4) of thickness 10 C.M., finished
mm thick cement plaster inside (SRC) & outside
(only for shaft) in C.M.1:3, finishing with cement
slurry, P/F 4 mm dia M.S Steel HDPE coated steps
35 cm c/c at 35 cm staggered Masonry in C.M. 1:5,
RCC slab in CC 1 : 1.5 : 3 of thickness 23 C.M,
including Cantering & reinforcement (double jalli at
15 C.M c/c bothway 12 mm dia.) but excluding the
cost of Manhole seat cover etc. completed (Inside
Clear, M.H. length should be parallel to the flow,
For Pipe dia. <= 1000 mm
For Pipe dia. <= 1200 mm
Extra rate over item of Constructing Slab Type
M.H./Chamber of following size for
constructing M.H./ Chamber, per
Decimetre of additional depth or part thereof.
etc. complete. Of size 1.00 x 1.40 mt. (inside
clear) and Depth from.
a 1 4.00 to 5.00 meter depth, 521.43 DM
Rate reduction over item of Constructing Slab
Type M.H. Chamber of size 1.00 x 1.40 mt for
13 1 constructing slab @ depth more than 0.60 mt for 586.61 DM
( MH 2 to 3 mt depth) and 1.0 mt for (MH above
3.0 mt depth) below Ground Level (Max. 5 unit
of DM should be reduced in this item)
Dismantling of existing Arch type manhole up to
Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and &
finished 15 mm thick cement plaster inside in
CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated
14 steps 35 cm c/c at 35 cm staggered in masonry
CM 1:5, incl. cost of RCC Slab in CC 1:1.5:3,
including Cantering & reinforcement as directed
by engineer in charge. Rate includes carting of
debris and excavated soil
1.00 x 0.75 mt (inside clear) RCC Slab of
thickness 15 C.M& reinforcement (Single jalli at
15 C.M. c/c bothway 10 mm dia.) From 0 to
mt depth (Slab at Ground level)
1.00 x 0.75 mt (inside clear) RCC Slab of
thickness 15 C.M& reinforcement (Single jalli at
15 C.M. c/c bothway 10 mm dia.) From 2 to
mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of
thickness 23 CM & reinforcement (double jalli
at 15 C.M. c/c bothway 10 mm dia.) From 0 to
2 mt depth (Slab at Ground level)
1.40 x 1.00 mt (inside clear) RCC Slab of
thickness 23 CM& reinforcement (double jalli at
15 C.M. c/c bothway 10 mm dia.) From 2 to
mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of
thickness 23 CM & reinforcement (double jalli
e 1 at 15 C.M. c/c bothway 10 mm dia.) From 3 to 24776.79 No
4 mt depth (Slab at below 1.00 mt. From G.L.)
Making connection to the ex.M.H.in running
sewer incl. Dewatering and other required
15 machinery etc. of following dia pipes at any
convenient time. All damaged work shall be well
repaired as per instructions. etc..complete.
a 18 a. 150 mm to 300 mm dia. 1339.29 No.
b 6 b. 400 mm to 600 mm dia. 2232.14 No.
Cutting the pipes of following dia coming in the
new M.H.in running sewer including cutting
bars, including removing debris /silt from the
16 M.H. and carting at a suitable distance
etc..complete as directed. No payment for M.H.
work will be made until pipe is not cut
completely in all respect.
a 3 150 mm to 300 mm dia. 1133.93 No.
b 3 400 mm to 600 mm dia. 1687.50 No.
Repairing damaged M.H. and rasing M.H. up to
road level incl. removing damaged brick work
and repairing by brick masonry in C.M. 1:5 and
17 plaster in C.M. 1:3 and fixing C.I. steps and
existing MH sheet cover, removing the debris
from MH and carting the same as directed.
a 28 (A) up to 0.15 mt. (@ Two Coarse) 728.82 No.
b 22 (B) up to 0.35mt. (@ Four Coarse) 1155.44 No.
c 5 (C) up to 0.65 mt. (@ Seven Coarse) 1786.49 No.
d 6 (D) up to 0.90 mt. (@ Ten Coarse ) 2150.90 No.
Repairing damaged I.C./ Raising removing
damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing chamber sheet
cover, removing the debris from chamber and
carting the same as directed.
Providing F.R.C. MH seat cover incl. carting
19 to the work site etc. comp. Directed.
F.R.C. Extra Heavy Duty (EHD-35) Manhole
Covers & Frames Cover : 728mm ø & 100 mm
thick circular cover, 35.00 MT load design,
100x2mm MS flat allround, 16mm ø plain round
bar for lifting the cover & should be fitted with
a 28 plastic cups. Frame : 560 mm ø clear opening, 3354.74 Set
outer size- 888x888x175 mm. On the upper
periphery of frame 25 x 3 mm wide MS flat
should be well embed in concrete to protect the
edges of frame. FRC E.H.D.-35 manhole cover
& frame described as above
F.R.C. Heavy Duty [HD-20] Machinehole
Covers - 560 mm ø clear opening, The
b 25 dimension of frame and cover as per mentioned 1720.44 No.
in Amend No.1 to IS 12592 : 2002 table
F.R.C. Medium Duty [MD-10] Machinehole
Covers - 560mm ø clear opening, The dimension
c 10 of frame and cover as per mentioned in Amend 1255.52 No.
No.1 to IS 12592 : 2002 table 1..
F.R.C. Medium Duty [MD-10] Chamber Covers
& Frame- 600 x 450 mm clear opening, The
d 12 dimension of frame and cover as per mentioned 2254.98 No.
in Amend No.1 to IS 12592 : 2002 table
F.R.C. Light Duty [LD-2.5] Machinehole
Covers & Frames-560mm ø clear opening, The
e 8 dimension of frame and cover as per mentioned 1915.14 No.
in Amend No.1 to IS 12592 : 2002 table
Carting and Fixing M.H., Chamber or Catchpite
Seat and Cover in line and level to match
exisisting road level in C.C. 1:2:4 and finishing
smooth, watering and protecting for 7 days etc.
complete as directed. M.H. seat cover will be
supplied byA.M.C.(from any store)
Providing Kachha of Pakka Dummy in the
21 following dia pipes and removing the same after
completion of the connection work as directed.
a 8 (A) 100 mm to 300 mm dia. 199.11 No.
b 8 (B) 350 mm to 600 mm dia 302.68 No.
Providing Dead Cantering using good quality
Country Wood Planks, wall Plate of required
thickness and size including placing the nece.
22 50 supports of reqd. size, nailing, fixing with 312.50 Smt
mortar, levelling. All specification for dead
centring as per standard engg. practice etc.
comp. as directed.
Supplying, labour for break down repairing
work for activities like excavation, disliting,
removing debris from trench back filling etc.
comp. as directed by Eng.in charge.
a 380 Mazdoor at day /Night 363.30 No
b 15 Fitter at day / Night 380.30 No
b 85 Makadam/ supervision at day / Night 379.46 No
Barricading the entire break down or excavated
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion &
movement including cautionary board etc. Item
also includes for making temporary sufficient
nos of lighting arrangement through out the
work with necessary required arrangement. The
same shall be removed after completion of work.
(Only for break down work from start to
Fabricating, supply and erecting in position
Standard Structural steel sections conforming to
IS 2062 for railing , skywalk, stair, or other
works using ISMB, ISA, ISMC, MS plate, flat,
square bars, pipe, square pipe, rectangular
sections, square section, tube, etc. including
welding, cutting, wastage, etc. complete. The
rate is inclusive of welding rod, supply & fixing
of correct size nut, bolts, washers, including one
primer coat of red lead paint conforming IS:102
25 220 Zinc chromate paint conforming to IS:104 68.82 Kg.
followed by two coat of aluminium paint as per
IS:2339 OR enamel paint of color as selected by
engineer incharge, with all contractor's
materials, labour, tools & plants, in
bolted/welded construction as directed by
Engineer-in Charge. The waste cut pieces shall
not be included in the paying quantity. The work
shall be done as per drawing and specification.
The work shall be carried out as per IS:800,
Providing TMT Bar FE415 reinforcement for
R.C.C. work including bending, binding and
placing in position complete upto floor two level
Brick work using common burnt clay building
bricks having crushing strength not less than
35kg./Sq.Cm. In foundation and plinth in
Cement Mortar 1:5.(1-Cement: 5 -fine sand)(B)
Conventional.(R & B Building Road Bridge
SOR 2021-22 Item Code 06001BA,Item No.as
per NBO-6.12 page no.64Dist. AHMEDABAD
Providing15mm thick cement plaster in single
coat on Rough (Similar) side of single or half
28 35 brickwalls for interior plastering upto floor two 101.25 Smt
level and finished even and smooth in (i)
Cement mortar 1:3 (1-cement:3-sand).
Reinstatement of Asphalt road using the same
29 35 material. 103.57 Smt
Providing and Casting in situ ordinary
cement concrete M200 for R.C.C. Raft and cutt
off walls including necessary shuttering laying,
vibrating, ramming and curing complete.(B)
Walls, fom top of foundation level upto floor
Labour charger for lowering existing Ventilating
column safely with the help of required capacity
of hydra crane or any type of required capacity
of crane. Item also includes welding machine
gas cutter , electric cutter , breaker etc necessary
machineries required for this work with out
damage and item also includes carting the same
to the AMC store. etc. comp as directed.
Constructing Bombay Pattern Type Catch Pit of
size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick
brick maso. wall in the prop. of CM (1:6) with
40 mm thick IPS flooring in the prop M15 at
bottom and 15 mm thick cement plaster inside
the catch pit in the proportion of CM (1:3) with
out jali etc. comp. as directed.
CatchPit Jali (Heavy duty) Fixing P/F FRC catch
pit jali with frame 600mm x 600mm clear
opening etc. comp.. As directed by engineer in
Providing, laying and jointing in true line and
level UPVC pipe (SCH-40) of following dia.
34 Including fittings of standard make as approved
by Engineer-in-charge.
a 1 15 mm 75.43 Rmt
b 1 25 mm 95.36 Rmt
c 1 40 mm 153.79 Rmt
d 1 50 mm 203.19 Rmt
Providing, supplying & fixing to wall ceiling
and floor 6.0 kg. F/Cm2 working pressure
polythelene pipes of the following outside dia.
Low density. Complete with special flange
empression type fittings. Wall clips etc. incl.
making good the wall ceilling and floor.
Box cutting the road surface to proper slope and
camber for making a base for road work
36 50 including removing the excavated stuff and 127.13 Cmt
depositing on the road side slope as directed
upto 200 Mt.lead
Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
37 carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base
course on well prepared surface and compacting
with vibratory roller to achieve the desired
density as per Codal Provision.
35 Production & Supply of WMM 1708.13 Cmt
35 Laying of WMM 31.25 Cmt
Hiring of Tractor with trolley considering 8 Hrs.
As working Day hours inclu. Driver (GWSSB
SOR-2022-23 Section-2E-Miscellenous Item
Providing and operation dewatering Pump
including fuel charges & operator Charges etc.
39 18 as directed etc. comp. (Shift for Eight Hour) (For 600.00 Shift
Each Pump Set, No payment should be allowed
for non working condition of machinery)
Hiring and operating Mud Pumps incl. Cost of
fuel and operator including the cost of to and fro
transportation, laying of the delivery hoses as
40 4500 required, lowering and lifting the pumps as and 16.00 H.P/Hr
when required etc. complete. Set Do As
Directed. (No payment should be allowed for
non working condition of machinery)
Hiring and operating the 20 KV 3 Phase Electric
Generator for operating desilting machinery, and
lighting and other requirements with Arranging
diesel to run the D.G. Set Do As Directed. 8 Hrs
Shift. (No payment should be allowed for non
working condition of machinery)
Providing & Supplying JCB Machine on rental
basis in case of emergency situation and break
down type work & also during unavoidable
condition as per instruction of engg. in charge,
rate includes all nece. shifting, fuel and
operating charges and stacking of useful & non-
useful materials separately up to store. (No
payment should be allowed for non working
condition of machinery and for pipe line
excavation and laying work)
Supplying Pneumatic Breaker Machine for RCC
Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc.
Complete as Directed. (No payment should be
allowed for non working condition of machinery
and for pipe line excavation and M.H. work.
Allowed only for break down work)
Providing & Supplying Hitachi Machine-110
capacity on rental basis in case of emergency
situation and break down type work & also
during unavoidable condition as per instruction
of engg. in charge, rate includes all nece.
shifting, fuel and operating charges . (No
payment should be allowed for non working
condition of machinery)
Providing & Supplying Hitachi Machine-200
capacity on rental basis in case of emergency
situation and break down type work & also
during unavoidable condition as per instruction
of engg.incharge , rate includes all nece.
shifting, fuel and operating charges. (No
payment should be allowed for non working
condition of machinery)
Providing & Supplying hydra carne Machine of
12 tone capacity on rental basis in case of
emergency situation and break down type work
& also during unavoidable condition as per
instruction of engg. in charge, rate includes all
nece. shifting, fuel and operating charges. (No
payment should be allowed for non working
condition of machinery)
Corrugated DWC HDPE pipes (Non-pressure
Providing and supplying of Class SN8
Structured Wall polyentheiene piping systems
(Pipe with online/offline coupler and elastomeric
47 sealing ring) with nonsmooth external annular
corrugated and smooth internal surface (Double
central taxes, transportation, freight charges,
octroi, inspection charges, loading, unloading,
coveyance to the departmental stores e
Total Estimated Tender Rs.
(in words also)
CONTRACTOR'S SIGNATURE Add.City Engineer
& STAMP (North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
"North West Zone, Zonal Office", Nr. Atithi Hotel, Bodakdev Ahmedabad.
Municipal Commissioner invites Percentage Rate sealed tenders from interested contractors .
1 Name of work Providing And Laying Drainage Line Work and Construction of
Machinehole work of Drainage line And Other Maintance Work at
T.P.Scheme no.37,38, 53-A and Other Different T.P. road and Gamtal
area in Thaltej ward in North West Zone.
2 Time Limit 12 Months (Excluding Monsoon)
3 Eligibility Criteria Register “E-1” Class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
4 Estimated Cost put to tender Rs.
5 Earnest Money Deposit Rs. 30000.00 Demand Draft, Pay order, or Cheque ,Bank Guarantee
(As per finanance circular No 21) in favour of Municipal Commissioner,
Ahmedabad) To be submitted as prescribed in 7.0 below. Demand
Draft or Bank Guarantee shall be from Nationalized Bank and valid for
6 (A) Security Deposit: 5% of Tender Amount but Depends Upon AMC Circular Only.
(B) Retention 1. @ 2% of the value of work done will be deducted from each RA bill.
It will be released along with release of payment of Final Bill.
7 Tender fees Rs.1500.00 Demand Draft / Pay order in favour of Municipal
(Non refundable) Commissioner, Ahmedabad)
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager (North West zone), Ahmedabad Municipal
Corporation, North West Zone, Zonal Office", Nr.Atithi Hotel, Bodakdev
9 Tenders issue date Tenders from the website http://amc.nprocure.com and
http://nprocure.com. shall be down loaded from
10 Last date of receiving Dt.23.02.26 up to 18:00 Hrs The tenders received after this date and
Tenders. time will not be entertained under any circumstances.
11 Date of Opening Dt.25.02.26 at 12:00 Hrs to Assistant Manager "North West Zone
Office", Rajmata vijyaraje sindhya bhavan, Near Atithi hotel, Bodakev,
12 Mode of sending the Tender Document shall be submitted in sealed envelope systems By RPAD/
Documents Speed post/ Hand Delivery/ Courier in sealed covers as described in
submission of the tender.
13 Terms, Condition, & All general condition of contract of Form B1 condition of contract shall
Specification be applicable.
14 liquidated damages- 10% of the Amount For Balance work After Date of Completion or
Compensation For Delay extended time Limit.
15 Goods & Service Tax (GST) Goods & Service Tax (GST) shall be applicable & bidder should submit
all necessary supporting documents as and when asked by AMC.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all
the tenders without assigning any reasons thereof.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all the
tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Add.City Engineer
(North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Hereinafter called “the Employer”) invites sealed
Tender document from reputed and qualified bidders for the construction of Works detailed in the
Sr. Name of Works Approximate Bid Security (Rs.) Completion
No. value of works Period
1 Providing And Laying Drainage Line Work and Rs. 3000000.00 Rs. 30000.00 12 Months
Construction of Machinehole work of Drainage (Excluding
line And Other Maintance Work at T.P.Scheme Monsoon)
no.37,38, 53-A and Other Different T.P. road and
Gamtal area in Thaltej ward in North West Zone.
2. Tender (a complete set of bidding document) fee shall be Rs.1500/- in the form of Demand Draft /
Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, Ahmedabad,
payable at Ahmedabad, which shall be non refundable. The fees shall be paid at the time of
submitting the tender.
3. Interested bidders shall download the tender documents from website http://amc.nprocure.com
and http://nprocure.com. up to Dt.23.02.26 at 18:00 hrs tender fee as mentioned in clause
above shall be paid by the bidder at the time of bid submission.
4. All bids must be accompanied by Bid Security of the amount specified for the Works in the above
Table payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL CORPORATION,
Ahmedabad. Bid Security will have to be in any one of the forms as specified in Clause of ITB
(Instructions to Bidders).
5. All Bids must be delivered to Assistant Manager "North West Zone, Zonal Office", Nr.Atithi Hotel,
Bodakdev Ahmedabad. Not later than 17:00 hrs on Dt.25.02.26.
Seal and Signature of the Bidder Add.City Engineer
(North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at different
sites simultaneously. Contractor's having labour force available during festivals shall only apply.
Contractor cannot stop the work due to non availability of labour force.
In case progress is delayed, contractor shall be penalized 0.10% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining value of work.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills of
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then contractor
shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by
the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean
as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points, or aspects in the
relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to the
following limits:
(i) Length, width and depth (height)------- 0.01 Meter. (RMT)
(ii) Areas -----0.01 Sq. Mt. (SMT)
(iii) Cubic Contents ------0.01 Cu.Mt. (CMT)
17. The distance, which constitutes lead, shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be
taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work is in
the form of a designation containing the number of the specification of the material and prefix 'M'
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials used in
the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials shall
be stone at site of work in a systematic manner. Materials shall be stored in such a manner as to
prevent damage, deterioration or intrusion of foreign matter and to-ensure the preservation of their
quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the
site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers and
in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or over
loading of the various components of the structure during execution or after completion of the
29. All necessary safety measures and precaution (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the works
as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent
towards testing charges is separately made.
31. The tenderer is required to check the web site for Addendum if any, before 48 hours of tender
submission date and time. The tenderer who quotes the tender without attaching the addendum will
32. As per City Engineer’s circular no.-6/2011-12 Dt.24.6.2011 all terms & conditions will be applied.
33. Contractor has to follow Planning Department Circular No 10 Dt. 07/09/2018 strictly.
34. As per AMC’s Finance department Crcular No.38, Dt.21/11/2022 and approval of competent
authority, rate of all the items are taken without GST and prevailing GST will be payable.
35. All the relevant prevailing AMC circulars/ its time to time revisions are applicable for this work and all
the bidders are bound to follow the same, so the bidder must check before applying for the tender.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Eighty Calendar days (180)
from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish to
the Corporation Security Deposit of 5% (Five percent) of the contract price Cheque or Bank Guarantee, pay
order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE Add.City Engineer
& STAMP (North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Section I – INSTRUCTIONS TO BIDDERS (ITB)
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for
the construction of works (as defined in these documents, hereinafter referred to as "the Works")
Detailed in the table given in the ITB.
1.2 The Works consist of:
a) “TENDER DOCUMENT FOR : Above said work.
1.3 The works under this Contract shall be carried out in accordance with the bidding documents constituting
the contract and shall consist of various salient items as generally described below:
1.3.1 Road Works
A) Site clearance, removal of tree stumps and dismantling of obstructions etc.before commencement of the
B) True and proper setting out and layout of the Works, setting of bench marks, provisions of all necessary
labor with instruments and appliances;
C) Widening and strengthening/reconstruction of the existing carriageway including raising;
D) Any other item of work as may be required to be carried out for completing the road works in all
respects in accordance with the provisions of the Contract.
2. Eligible Bidders
2.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD or AMC or equivalent. If contractor is not
registered with AMC in the relevant class, on award of contract he shall be required to register himself with
AMC within 3 month's time Bidders shall provide such evidence of their continued eligibility satisfactory to
the Employer, as the Employer shall reasonably request.
3. Eligible Material, Equipment and Services
3.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required
to provide evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4. Qualification of the Bidder
4.1 To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder.
General information
All individual firms must complete the information in this form. Nationality information shall be provided for
all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone / Mobile no:
5 E-mail addresses:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
additional information regarding litigation, debarment, arbitration, etc.
4.2 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of
the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the AMC as poor performer in implementation of ongoing AMC works e.g.
Works completed after notices issued by AMC or poor quality of work or completed after time limit or
not responsive to Engg.incharge instruction.
d) In case of one contractor remains lowest in most of the such North west Zone grouting work
tenders, then in such case, AMC can award such tender to other contractors.
5 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
6. Cost of Bidding
6.1 The bidder shall bear all costs associated with the preparation and submission of his bid and he
Employer will in no case be responsible or liable for those costs.
7.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for
itself on its own responsibility all information that may be necessary for preparing the bid and
entering into a contract for construction of the Works. The costs of visiting the Site shall be at the
bidder's own expense.
7.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its
premises and lands for the purpose of such inspection, but only upon the express condition that the
bidder, its personnel and agents, will release and indemnify the Employer and its personnel and
agents from and against all liability in respect thereof and will be responsible for death or personal
injury, loss of or damage to property and any other loss, damage, costs and expenses incurred as a
result of the inspection.
B. Preparation of Bids
8. Language of Bid
8.1 The bid, and all correspondence and documents related to the bid exchanged between the bidder and
the Employer shall be written in the English language. Supporting documents and printed literature
furnished by the bidder may be in another language provided they are accompanied by an accurate
translation of the relevant passages in the English language, in which case, for purposes of
interpretation of the bid, the English translation shall prevail.
9 Documents comprising the Bid
The bids shall be submitted in hard copy and two copies, one marked as “original” and other marked
as “Duplicate”, both of which comprise the following documents:-
Tender Document:
i) Bid Security for an amount as specified in the Invitation for Bids (IFB).
ii) Power of Attorney
iii) Information as specified.
iv) Any other material / information required to be submitted in accordance with these Instructions to
The Tender Document shall be hard bound. Bid security shall be furnished in “Original” set of
In case of any ambiguity the “Original” set of document shall prevail.
The bidder shall prepare and submit two copies of the bid in original and duplicate.
10.1 Unless stated otherwise in the bidding documents, the Contract shall be for the whole Works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted by the bidder.
10.2 The bidder shall fill in percentage rate above or below and total amount (both in figures and words)
10.2 The bidder shall fill in percentage rate above or below and total amount (both in figures and words)
for overall items of the Works provided in the Bill of Quantities along with total bid price derived after
application of percentage above or below (both in figures and words). Items (for which rate has been
provided) against which no quantity is entered will be paid for by the Employer on actual
measurement onsite when executed.
Any corrections should be initialed.
All pages of the Bill of Quantities shall be initialed and stamped.
11. Bid Validity
11.1 Bids shall remain valid for a period of 120 days (one hundred twenty days) after the deadline date for
bid submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a
shorter period.
11.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request and
the responses there to shall be made in writing or by fax. A bidder may refuse the request without
forfeiting his bid security. A bidder agreeing to the request will not be required or permitted to
modify his bid but will be required to extend the validity of his Bid Security for the period of the
extension, and in compliance with Clause 14 in all respects.
12. Bid Security
12.1 The bidder shall furnish as part of its Bid, a Bid Security in the amount in the Invitation for Bid (IFB) for
particular work(s). The Bid Security shall be drawn in favor of MUNICIPAL COMMISSIONER,
Ahmedabad, and may be in one of the following forms:
a) Deposit-at-call Receipt from any Nationalized / Scheduled Bank approved by the Reserve Bank of
b) Bank Guarantee from any Nationalized or RBI approved foreign bank having net worth of more
than Rs.500 crore of Indian operation and acceptable to Employer.
The format of Bank Guarantee shall be in accordance with the AMC requirement.
12.2 The Bid Security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be returned as
promptly as possible.
12.3 The Bid Security of the successful bidder, along with second and third lowest tenders, will be
returned when the bidder has furnished the required performance security and signed the agreement.
12.4 The Bid Security may be forfeited
a) If the bidder withdraws his bid during the period of bid validity;
b) If the bidder does not accept the correction of his bid price.
c) In the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security ii) sign the Agreement.
13. Format and Signing of Bid
13.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions
13.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons
duly authorized to sign on behalf of the bidder.
13.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder, in which case the
person or persons signing the bid shall initial all such corrections.
C. Submission of Bids
14.1 The inner and outer envelopes shall
a) Be addressed to the Employer at the following address:
Assistant Manager (North West zone) .
b) Bear the following identification:
(c) Indicate the name and address of the bidder.
TENDER FOR Above said work.
14.2 If the envelope is not sealed and marked as above, the Employer will assume no responsibility for the
misplacement or premature opening of the bid.
15. Deadline for Submission of Bids
15.1 Bids must be received by the Employer at the address specified above not later than the time and
date specified.
15.2 The Employer may, at his discretion, extend the deadline for submission of bids by issuing an
amendment, in which case all rights and obligations of the Employer and the bidders previously
subject to the original deadline will thereafter be subject to the deadline as extended.
Any bid received by the Employer after the deadline for submission of bids shall not be opened.
17. Modification and Withdrawal of Bids
17.1 The bidder may modify or withdraw his bid after bid submission, provided that written notice of the
modification to the Employer prior to the deadline for submission of bids receives withdrawal. Any
MODIFICATIONS in respect of tender document shall be submitted in separate sealed envelope duly
17.2 The bidder's modification or withdrawal notice shall be prepared, sealed, marked and delivered with
the outer and inner envelopes additionally marked "MODIFICATIONS" or "WITHDRAWAL" as
17.3 No bid shall be allowed to modify by the bidder after the deadline for submission of bids.
17.4 Withdrawal of a bid during the interval between the deadline for submission of bids and the
expiration of the period of bid validity may result in the forfeiture of the Bid deposit.
D. Bid Opening and Evaluation
18 Opening of Tender (Bid)
18.1 The Employer will open the outer envelope of all the bids received for the package (except those
received late) containing the sealed Tender volume and announce the names of (i) bidders, (ii) bidders
who have submitted modification of Tender bids, and (iii) bidders who have given notice for
withdrawal of their bids in the presence of bidders or their representatives who choose to attend on
the date and time mentioned in the ITB. In the event of specified date of bid opening being declared as
a holiday for the Employer, the Tender will be opened at the appointed time and location on the next
18.2 Bids for which acceptable notice of withdrawal has been submitted pursuant to Clause mentioned
previously shall not be opened.
18.3 Bidders detail and Tender fee, E.M.D. shall be opened first. The Employer at the opening will
announce bidder’s names, ‘Modification of Tender’, the presence/or absence of Bid Security, the
amount and validity of Bid Security furnished with each bid, is valid registration and such other
details, as the Employer may consider appropriate.
18.4 The bidders or their representatives who are present shall sign attendance sheet evidencing their
18.5 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening, including
the information disclosed to those present in accordance with Clause mentioned previously.
19. Examination of Tender and Determination of Responsiveness of Tender
19.1 If the Bid Security furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the Employer as
non-responsive.
19.2 Subject to confirmation of the Bid Security by the issuing bank, the Tender volume accompanied with
valid Bid Security will be taken up for further evaluation. In case, the Bank does not confirm the Bid
Security, the bid shall be rejected as non-responsive and no further evaluation carried out.
19.3 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is accompanied
by the requisite certificates, undertaking and other relevant information specified in the bid
documents and is substantially responsive to the requirement of the bidding documents and provides
any clarification for ascertaining the correctness of the information/details that the Employer may
19.4 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the non-conforming
deviation or reservation.
20. Opening of Tender
20.1 The Employer will open the Tender volume of those bidders whose document has been determined
to be substantially responsive in accordance and who have the required available bid capacity, in
presence of the bidders or their representatives who choose to attend on the date intimated to such
bidders. In the event of specified date of Tender volume opening being declared a holiday for
Employer, the ‘Tender volume’ shall be opened at the appointed time and location on the next
20.2 The names of the bidders whose Tender volume is found to be substantially responsive, the bid
prices, the total amount of each bid, any discount, ‘modifications of B.O.Q and such other details, as
prices, the total amount of each bid, any discount, ‘modifications of B.O.Q and such other details, as
the Employer may consider appropriate will be announced by the Employer at the opening of the
Tender volume. Any bid price, which is not read out and recorded at the bid opening, will not be
taken into account in Bid Evaluation.
20.3 The bidders or their representatives who are present shall sign attendance sheet evidencing their
20.4 The Employer shall prepare besides the record of bid opening, minutes of the Tender volume opening
including the information disclosed.
21. Examination of Bids and Determination of Responsiveness of Bid
21.1 The Employer will determine responsiveness of each Tender volume with respect to filled percentage
above or below of total amount of Priced Bill of Quantities, Technical Specifications, Drawings and
above or below of total amount of Priced Bill of Quantities, Technical Specifications, Drawings and
other relevant requirement of bidding documents.
21.2 A substantially responsive Tender volume is one which conforms to all the terms, conditions and
specifications of the bidding documents, without material deviation or reservation. A material
deviation or reservation is one (i) which affects in any substantial way the scope, quality or
performance of the Works; (ii) which limits in any substantial way, inconsistent with the bidding
documents, the Employer's rights or the bidder's obligations under the Contract; or (iii) whose
rectification would affect unfairly the competitive position of other bidders presenting substantially
responsive Tender volume.
21.3 If the Tender volume is not substantially responsive, it will be rejected by the Employer and may not
subsequently be made responsive by correction or withdrawal of the non-conforming deviation or
22. Correction of Errors
22.1 Tender volume determined to be substantially responsive will be checked by the Employer for any
arithmetic errors. Arithmetic errors will be rectified on the following basis:-
i) Where there is a discrepancy between the figures and words, for % and amount, the figure in words
will govern and
ii) Where there is discrepancy in total amount arrived by addition of percentage (above or below), the
ii) Where there is discrepancy in total amount arrived by addition of percentage (above or below), the
amount arrived by addition percentage (above or below) as written in word shall govern.
22.2 The amount stated in the Form of Bid will be adjusted by the Employer in accordance with the above
procedure for the correction of errors and shall be considered as binding upon the bidder. If the
bidder does not accept the corrected amount of bid, his bid will be rejected, and his Bid Security may
23. Evaluation and Comparison of Tender volume
23.1 The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 23 and qualified for award of Contract.
23.2 In evaluating the Tender volume, the Employer will determine for each Tender volume the valuated
Bid Price by adjusting the Bid Price as follows:-
a) Making any correction for errors;
b) Making appropriate adjustments to reflect any price modifications offered.
23.3 If the Bid of the successful Bidder is seriously unbalanced or extremely higher / lower in relation to
the Employer’s estimate of the cost of the items of the Works to be performed under the Contract,
the Employer may require the bidder to produce detailed price rate analysis for any or all items of the
Bill of Quantities, to demonstrate the internal consistency of those prices with the construction
methods and schedule proposed. In case, AMC finds rates extremely below estimated SOR rate or
Market Rate than Tender shall be rejected and second lowest tenderer may be awarded the work.
23.4 A bid, which is unrealistically lower then estimate and which the bidder, could not substantiate
satisfactorily, may be rejected as non-responsive.
24 Clarification of Bids
24.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion,
ask any bidder for authentication the correctness of the information/details furnished by him in his
bid. Such request by the AMC and the response by bidder shall be in writing or by cable/fax, but no
change in the price or substance of the bid shall be sought, offered or permitted except as required to
confirm the correction of arithmetical errors discovered by the Employer in the evaluation of the bids.
24.2 No bidders shall contact the AMC staff on any matter relating to his bid from the time of bid opening
to the time contract is awarded.
24.3 Any effort by the bidder to influence the the AMC staff in the bid evaluation, bid comparison or
contract award decisions may result in the rejection of his bid.
25.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons
not officially concerned with such process until the award to the successful bidder has been
announced. Any effort by a bidder to influence the Employer's processing of bids or award decisions
may result in the rejection of his bid.
F. Award of Contract
26.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated Bid Price
provided that such bidder has been determined to be (i) eligible in accordance with the provisions of
previous Clauses and (ii) qualified in accordance with the provisions of previous Clauses.
27. Employer's Right to accept any Bid and Reject any or all Bids
27.1 The Employer reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids, at any time prior to award of Contract without thereby incurring any liability to the
affected bidder or bidders or any obligation to inform the affected bidder or bidders of the grounds
for the Employer's action.
28. Notification of Award
28.1 Prior to expiration of the period of bid validity prescribed by the Employer the Employer will notify
the successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted.
This letter (hereinafter and in the Conditions of Contract called "the Letter of Acceptance") shall name
the sum which the AMC will pay the Contractor in consideration of the execution, completion and
maintenance of the Works by the Contractor as prescribed by the Contract (hereinafter and in the
Conditions of Contract termed "the Contract Price").
28.2 The notification of award will constitute the formation of the Contract.
29. Signing of Agreement
29.1 At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a
date determined by the Employer for signing the Form of Agreement.
30. Performance Security
30.1 Within 10 (Ten) days of the date of receipt of the Letter of Acceptance the successful bidder shall
deliver to the Employer, a Initial Performance Security in the form of a Bank Guarantee for an amount
equivalent to 5% (five percent) of the Contract Price plus additional security for unbalanced bids in
accordance with relevant Conditions of Contract.
30.2 The Performance Security to be provided by the successful bidder in the form of a bank guarantee as
per format shall be issued from any Nationalized / Scheduled bank.
31. Corrupt or Fraudulent Practices
31.1 The Employer will reject a proposal for award if he determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the contract in question. The
Employer will declare the firm ineligible, either indefinitely or for a stated period of time, to be
awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the
firm has engaged in corrupt or fraudulent practices in competing for the contract, or during
i) “corrupt practice” means behavior on the part of officials in the public or private sectors by which
they improperly and unlawfully enrich themselves and/or those close to them, or induce others to do
so, by misusing the position in which they are placed, and it includes the offering, giving, receiving, or
soliciting of anything of value to influence the action of any such official in the procurement process
or in contract execution; and
ii) “fraudulent practice” means a misrepresentation of facts in order to influence a procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive
practice among bidders (prior to or after bid submission) designed to establish bid prices at artificial
non-competitive levels and to deprive the Borrower of the benefits of free and open competition.
Seal and Signature of the Bidder Add.City Engineer
(North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Section II - CONDITIONS OF PARTICULAR APPLICATION
1. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
2. The onus of providing, all necessary company / project related information, in appropriate manner
and medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will
rest entirely on the Bidder.
3. All information has to be typed or hand written legibly. All pages of the Bid have to be Initialed by the
4. ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for evaluation.
The Bidder may attach separate sheets if so required. However, the final bound document submitted,
has to be submitted in vertical A4 size (210 mm X 297 mm) except Vol. V.
5. The scope of work, project description mentioned in the document is indicative and is likely to change
during detail design. Project brief, along-with the schematic drawings and colored photographs, is
provided to assist the bidder in understanding the fundamental and specific requirements of the
6. Conditional tenders will not be accepted.
7. AMC’s decision for selection or rejection of the offers shall be final and binding to all.
8. Bidder should provide information as mentioned in the prescribed forms.
Information other than that related to this work shall not be considered for evaluation.
9. If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
10. Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender
volume is submitted without valid documents and without proof of eligibility criteria will be rejected.
11. Those who do not meet with the eligibility criteria need not submit the Tender document.
12. Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
13. Municipal Commissioner reserves the rights to reduce/ increase the scope of work and contract
without assigning any reason thereof.
14. DEFECTS: For completion of any work/ part thereof, contractor will be required to request in writing,
to get completion certificate from Additional City Engineer . Date of completion for start of defect
liability period will be considered as the date mentioned in the completion certificate.
The contractor shall be required to make good all the damages / defects identified and conveyed to
him, during the entire defect liability period. The method and time limit of rectification will be
decided by the Engineer in charge. If he fails to carry out rectification as per the instructions, the
same will be carried out at his cost and it shall be recovered from the amount retained.
16. All the material and other test expenses shall be borne by the contractor. Contractor shall have to
provide vehicle and other communication facilities to visit plant and testing laboratory.
17. Contractor shall have to make his own arrangements for water and electricity for the purpose of
construction work at site at his own expense.
18. If the contractor fails to execute the said works within prescribed time limit, the said work will be
carried out at the risk and cost by other contractors with 20 % supervision charges as may be decided
by the Additional City Engineer.
19. Safety and Signage
Contactor has to arrange for the complete safety of the persons working for project, users of the road
i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers,
traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent marking on
traffic signs to be provided so that it should be visible at night. During night working hours safety in
charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary diversions
for proper working at site including traffic signage, safety cones, traffic blinkers, barricading tapes,
red and green flags/lights etc for making easy smooth and safe conditions for the traffic. The
Contractor shall and must provide above at his own cost. If the Contractor fails to comply this
clause, Rs. 500/- per day shall be recovered from his bill.
20. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, sales tax. Service tax, VAT, govt.duties etc.
on material procurement or any other component for the works from any source shall be borne by
the contractors.
21. Submission of project schedule:
Contractor has to submit the following documents along with the qualification data of the tender
failing in which shall lead to rejection of the tender.
Contractor shall submit the detailed Project schedule showing break up for the various tasks to be
performed in order of their occurrence during the project in Microsoft Project/Prima Vera format.
22 For Flakiness and Elongation Index norms adopted by AMC shall be made applicable.
23. For non-bituminous, bituminous and concrete works, the black trap aggregates of required size shall be
procured from quarry situated in Sevaliya / Timba region or equivalent. Prior approval of source/ material
by Additional City Engineer shall be required.
24. Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing laws as
well as framed from time to time). Any penalties laid due to violation of such laws shall be directly deducted
from the contractor's outstanding.
25. As per St. Committee's resolution 0.5% testing charges shall be deducted from each R.A.Bill and the
amount of actual Testing charges shall be adjusted in the final bill.
26. Special Clause: As per construction works welfare cess Act – 1996 non-refundable one percent of
tender amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Add.City Engineer
(North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
(The Appendix forms part of the Bid. Bidders are required to fill up all the blanks in the form of Bid)
NAME OF THE CONTRACT: Above said work.
Add.City Engineer
"North West Zone, Thaltej ward Office",
Nr.Ayna Complex,
Thaltej,Ahmedabad.
1. Having examined the Conditions of Contract, Specifications, Bill of Quantities, Drawings and
Addenda No._______ for the execution of the above named works, we, the undersigned, offer to
execute and complete such works and remedy any defects therein in conformity with the
Conditions of Contract, Specifications, Bill of Quantities, Drawings and Addenda for the sum of
My/our offer works out as under:
Amount put to tender _________ Amount put to tender Rs. _______________
Net Amount Net Amount
2. We acknowledge that the Appendix to Bid forms part of our Bid.
3. We undertake, if our Bid is accepted, to commence the Works on Site within the period stated in
the Appendix to Bid hereto after receipt of an order of the Engineer’s notice to commence, and to
complete and deliver the sections and the whole of the Works comprised in the Contract within
the period stated in the Appendix to Bid hereto.
4. If our Bid is accepted, we will furnish Performance Security (ies) in the form of Bank
Guarantee(s) to be jointly and severally bound on us in accordance with the Conditions of
5. We agree to abide by this Bid for the period of one hundred and twenty (120) days after the date
of bid opening, and it shall remain binding upon us and may be accepted at any time before the
expiry of that period.
6. Unless and until a formal Agreement is prepared and executed, this Bid, together with your written
acceptance thereof, shall constitute a binding contract between us.
7. We understand that you are not bound to accept the lowest or any Bid you may receive.
8. All the partners of our Joint Venture are legally and severally bound by this Bid1.
9. Municipal Commissioner, Ahmedabad has right to reject any or all bids without giving any reason.
Dated this ____________ day of _______________
in the capacity of __________________ duly authorised2 to sign Bid for and on behalf of
Address (in block capitals)
1. To be deleted if the bidder is not a Joint Venture.
Certified copy of Power of Attorney/Authorization for signature shall be furnished by the Bidder in
accordance with Clause 20 of Instruction to Bidders (Section I).
Seal and Signature of the Bidder Add.City Engineer
(North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 month Excluding Monsoon period after the order to start the works. Progress of work should
be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor shall arrange for
barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for any damage to public. If any
incident happen, during the execution of work. In case of dispute for unseen or overlooked items the decision of the Add.City
Engineer shall be final. The contractor shall have to give site clean of all rubbish during the work and at the time of completion of
work and hand over the site with final finishing of the work as directed. All the rejected materials shall be removed from site
within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to prepare through of bigger
size and mix the mortar in the required proportion. In on case he shall be allowed to mix the mortar either on floor or any finished
surfaces. The contractor shall have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he shall be paid at the
rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available in SOR than based on current market
rates. In case of extra item decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the contractor shall
carry out the same at his quoted rates without charges any extra and the contractor will have to carry out the works and he will be
paid at the rate quoted by him. No claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to prepare the measures
boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully responsible for
compliance of the various provisions under contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for this work and that
the tenderer shall not be allowed to withdraw on modify the offer on his own during the period. If any tenderer withdraw or
makes any modifications or addition in the terms and conditions of his tender not acceptable to the Municipal Corporation the
Municipal Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said earnest money and
black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the penalty of Rs.- (As per
Form - B1) per day of delay shall be recovered from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
1. Conditional tender shall not be accepted.
2. All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
3. In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand draft or in cash.
4. Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1 can be is available in
website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of Building Works & and Road Works
Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE Add.City Engineer
& STAMP (North West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
NORTH WEST ZONE
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour
Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide
lines. If child labour is employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw
enty thousand only) in the child labour welfare fund. If the employer refuses to deposit then action will be taken
for contempt of Supreme Court Judgement and also will be prosecuted by concerned authority. Because of the
breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from
the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No.
1783 Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is
taken and the remaining amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to
follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be
entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by
A.M.C. The same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with
the tender duly signed. These shall form a part of tender. The tenderer shall not add or amend the text of any of
the documents except in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the
contract documents. The full consideration shall be given to such addendum or corrigendum or correction before
submission tender duly filled in by the contractor. Therefore, the contractor shall have to watch such addendum
or corrigendum or correction published by A.M.C through its website www.egovamc.com. Tenderes shall verify
the number of addendum issued and enclose the same with the tender documents,failing which the tender shall
be liable for rejection and no any complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE Add.City Engineer
& STAMP (North West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
NORTH WEST ZONE
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
SPECIFICATIONS OF MATERIALS – CIVIL
This section gives detail specifications for mainly used materials, for other materials refer Building Specifications.
For materials relevant specification of Building Specification shall apply.
TECHNICAL SPECIFICATIONS
NAME OF THE WORK : Above said work.
ITEM No. :- Excavation for foundation up to 1.5 tm. depth in all type of hard and soft soil including sorting
out stacking of useful material & disposing of excavated stuff up to 50 mt. lead loose or soft soil, girding,
lighting, fencing the trenches', and pits. (depth measured from GL). Etc.comp.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonry, concrete and asphalt
road paving work etc. Root of trees met with during excavation shall be stacked at lead of 4’ away from the
trenches as per instruction so that it may not damage the sides of excavated trenches. The sides of trenches shall
be vertical and bottom shall be uniformly leveled. The excavated earth shall be refilled in sides of trenches. The
surplus earth shall be either spread up uniformly for refilling if required in the compound or carted to and spread
at any please or placed as shown within 50 mtr. as directed. After completion of the work the site shall be well
dressed and cleared of all rubbish so that it may give decent appearance. Contractor shall arrange for all materials
required for lining out and shall care to preserve the level pegs given. He shall have to arrange for shorting at his
own cost if the soil is found to be loose and sandy. He shall have to arrange for sorting out brickbats or any
serviceable materials found during excavation and shall have to stock. Nothing extra shall be paid for this. He shall
have to cart the excavated soil to site shown within 50 mtr. If so ordered by officer in charge of this work. No old
brickbats recovered from excavation shall be allowed to be used by the contractor in the work. The depth of
foundation will be as per drawing. Contractor should arrange for safely measures so that there is no danger of
falling any men or animal in the excavated portion, otherwise he will be held responsible for the compensation to
be paid as the case may be. He should also arrange for red lamp at night times. The contractor should not damage
any of the municipal property, water lines, electric cables etc. at the time of excavation. Water lines, electric
cables etc. coming in the way will be shifted by corporation but he should see that no damage is done for gross
negligence on his part, otherwise such damages will be recovered from him. Excavated stuff will be stacked at the
site shown or will be carted by the contractor immediately as per the other item of this tender. Instructions of C.E.
or his representative will be strictly followed.
Measurement shall be given on Cmt. basis.
The rate shall be for a unit of one Cubic metre.
Item No.:- Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of thickness up
to 0.20 meter including demolishing the asphalt carpet,metal,soiling/cutting Reinforcement etc. comp. with
stacking the material as directed. (Based on Previously approved rate by C E sir )
Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of thickness up to 0.20 meter
including demolishing the asphalt carpet,metal,soiling/cutting Reinforcement etc. comp. with stacking the material
as directed. (Based on Previously approved rate by C E sir )
a up to 0.20 meter thickness (By Manual)
b Up to 0.30 meter thickness
c 0.30 meter & above
Measurement shall be given on Sq. mt. basis.
Item No. :- Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in
layers not exceeding 20 cm. in depth consolidation each deposited layer by ramming and watering (Based on
Building 2015-16, P-41 - Item code- 04006)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidation each deposited layer by ramming and watering (Based on Building SOR
Measurement shall be given on Cmt. basis.
The rate shall be for a unit of one Cubic metre.
Item No.:- Conveyance charge of earth ,lime,murrum, building rubbish, manualgarbage,sludge,excavated rock
,fly ash, aggregate of any kind etc. comp. Up to 5.0 Km. lead (Based on Building 2015-16, P-589 - Item code-
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind Including spreading
& levelling etc. complete. a) Lead up to 3 Km. All the surplus earth/excavated material etc. shall be carried away
immediately from the site of work to a place within distance specified in the relevant item or as directed and
ordered by the Engineer, so as not to cause any inconvenience to the public traffic. If the instructions are not
complied within 7 days from the date of order to cart the surplus materials and clear the site, the said work shall
be carried out by the Municipal Corporation at the risk and cost of the contractor and no claim or dispute shall be
entertained in this respect.
The rate of carting including carting of brick bats, metal, rubble vegetable and garbage, if necessary to clear the
Measurement shall be given on Cmt. basis.
The rate shall be for a unit of one cubic metre.
Providing And Jointing Stoneware Pipes Incl. Excavation Up to 2 Mt. Refilling, Transporting Pipes To
Work Site, Unloading, Lowering In Trench, jointing material Such As Cement, sand, Hemp Bitumen As Directed,
Incl. Watering The Trenches Spreading And Carting away Of Surplus material as directed by engineer in charge.
Providing laying and jointing glaze stone ware pipes including excavation upto 2 mt. refilling, transporting
pipes to work site, unloading lowering in trench, laying and jointing pipes including jointing material such as
cement, sand, hemp, bitumen as directed, including watering trenches spreading and carting away of surplus.
Providing and laying (two level or slopes) and jointing with stiff mixture of cement mortar in proportion 1-
1 salt glazed stone ware pipes, following nominal internal diameter incl. testing or pipes and joints complete.
The pipes shall be of best quality manufactured from stone waste of fine clay salt glazed thoroughly burnt
through the whole thickness. The pipes shall be free from crack fire blisters. The inner and outer surface shall be
smooth and perfectly glazed.
The trenches for stoneware pipe drains shall be carried out as per given inst.
The pipes shall be laid accurately and perfectly true to line, levels and gradients. Great care shall be taken
to prevent sand etc., from entering the pipes. The pipes between two manholes shall be laid truly in a straight line
without vertical or horizontal undulation.
The rate shall be for a unit of one running metre.
Manufacturing,Testing,Supplying,Loading,Transporting To Work Site, Unloading, Lowering In Trenches, Laying
And Jointing R.C.C.,Np-3 Class Pipes With socket and spigot joints as per IS 458-2003 Including EPDM Rubber
ring as per IS 5382-1985 etc.comp. As Directed by engineering in charge.(Based on Drainage SOR 2009-10)
This specification covers the requirements for manufacturing, testing, supplying, jointing and
testing at work sites of Reinforced Cement Concrete (RCC) pipes, of both pressure and non pressure
varieties used for umping mains and gravity, sewers and storm water drains. Laying of pipes and
fittings/specials are covered in Technical Specifications: Section-D6. The two parts are complementary and
are to be read together for a correct interpretation of the provisions of this specification.
APPLICABLE CODES
The manufacturing, testing, supplying, jointing and testing at work sites of RCC pipes shall comply
with all currently applicable statutes, regulations, standards and codes. In particular, the following
standards, unless otherwise specified herein, shall be referred. In all cases, the latest revision of the codes
shall be referred to. If requirements of this specification conflict with the requirements of the codes and
standards, this specification shall govern.
a) IS: 458 - Specification for precast concrete pipes (with and without reinf.)2003
b) IS: 3597 -Method of tests for concrete pipes.
c) IS: 5382 -Specification for rubber sealing rings for gas mains, water mainsand sewers.
d) IS: 516 -Method of test for strength of concrete.
D.7.3 CODE OF PRACTICE
a) IS: 456 -Code of practice for plain and reinforced concrete
b) IS: 783 -Code of practice for laying of concrete pipes
Design of RCC pipes including reinforcement details and the ends of pipes shall be in accordance with the
relevant clauses of IS: 458-2003. 3
Pipe can be manufactured by spinning process or by vibrated casting process.
The method of manufacture shall be such that the form and the dimensions of the finished pipes
are accurate within the limits specified in relevant clause of IS: 458. The surfaces and edges of the pipes
shall be well defined and true, and their ends shall be square with the longitudinal axis. The ends of the
pipes shall be further reinforced by an extra ring of reinforcement to avoid breakage during
transportation. The RCC pipes and rubber rings shall be systematically checked for an manufacturing
defects by experienced supervisors so as to maintain a high standard of quality. Owner/Engineer shall at
all reasonableb times have free access to the place where the pipes and collars/rubber rings are
manufactured for the purpose of examining and testing the pipes and collars/rubber rings and of
witnessing the test and manufacturing. All tests specified either in this specification or in the relevant
Indian Standards shall be performed by the supplier/contractor at his own cost and in presence of
Owner/Engineer if desired. For this, sufficient notice before testing of the pipes and fittings shall be given
to Owner/Engineer.
If the test is found unsatisfactory, Owner/Engineer may reject any or all pipes of that lot. The
decision of Owner/Engineer in this matter shall be final and binding on Contractor and not subject to any
arbitration or appeal.
Cement used for the manufacture of RCC pipes should be Sulphate Resisting Cement (SRC) only and shall
confirm to relevant IS codes.
Aggregates used for the manufacture of RCC pipes shall conform to IS:383. The maximum size of
aggregate should not exceed one-third the thickness of the pipe or 20 mm, whichever is smaller.
Mixing and Curing Water
Water shall be clean, colorless and free from objectionable quantities of organic matter, alkali,
acid, salts or other impurities that might reduce the strength, durability or other desirable qualities of
concrete and mortar.
Reinforcement used for the manufacture of the RCC pipes shall be mild steel Grade I or medium
tensile steel bars conforming to IS: 432 (Part-I) or harddrawn steel wire conforming to IS: 42 (Part-2).
Reinforcement cages foh pipes shall be as per relevant requirements of IS:
Concrete used for the manufacture of RCC pipes shall conform to IS: 456. The minimum cement
content and minimum compressive strength of concrete shall be as per relevant requirements of IS:458
(Latest Edition). Compressive strength tests shall be conducted on 15 cm cubes in accordance with the
relevant requirements of IS: 456 and IS:
Rubber ring chords used in pipe joints shall be EPDM rubbering as per IS 5382 :
Pipes manufactured in compliance with IS:458 (Latest Edition) shall be either water cured or steam
cured for minimum stipulated curing period inaccordance with relevant requirements of the latest revised
IS:458 (Latest Edition).
The internal diameter, wall thickness and length of barrel and collar of pipes, reinforcement
(longitudinal and spiral), type of ends and minimum clear cover to reinforcement and strength test
requirements shall be as per the relevant clauses/tables of IS: 458 for different classes of pipes.
Note : Concrete for pipes shall have a minimum compressive strength of 35 N/mm2 at 28 days.
The tolerances regarding overall length, internal diameter of pipes or sockets and barrel wall
thickens shall be as per relevant clause of IS:
WORKMANSHIP AND FINISH
Pipes shall be straight and free from cracks except that craze cracks may be permitted. The end of
the pipes shall be square with their longitudinal axis so that when placed in a straight line in the trench no
opening between ends in contact shall exceed 3 mm in pipes up to 600 mm diameter (inclusive), and 6 mm
in pipes larger than 600 mm diameter. The outside and inside surfaces of the pipes shall be smooth, dense
and hard, and shall not be coated with cement wash or other preparation unless otherwiseagreed to
between Owner/Engineer and the manufacturer or supplier.
The pipes shall be free from defects resulting from imperfect grading of theaggregate, mixing or
moulding.The pipes shall be free from local dents or bulges greater than 3 mm in depthand extending over
a length in any direction greater than twice the thickness ofbarrel. The deviation from straight in any pipe
throughout its effective length,tested by means of a rigid straight edge parallel to the longitudinal axis of
the pipe shall not exceed, for all diameters 3 mm forever meter run.
All pipes for testing purposes shall be selected at random from the stock of themanufacturer and
shall be such as would not otherwise be rejected under thecriteria of tolerances as mentioned in IS:458
(Latest Edition). Duringmanufacture, tests on concrete shall be carried out as per IS:456. The manufacturer
shall supply, when required to do so by Owner/Engineer the results of compressive tests of concrete cubes
and split tensile tests of concrete cylinders made from the concrete used for the pipes. The manufacturer
shall supply cylinders or cubes for test purposes required by the Owner/Engineer and such cylinders or
cubes shall withstand the tests prescribed by the manufacturer for the hydrostatic test pressure. For non-
pressure pipes, 2 percent of th pipes shall be tested for hydrostatic test pressure. The specimen of pipes
for the following tests shall be selected in accordance with relevant Clause of IS:458 (Latest Edition)and
tests in accordance with the methods described in IS:3597.
i) Hydrostatic test
ii) Three edge bearing test
iii) Absorption test
Note: Three edge bearing strength to produce 0.25 mm crack in case of special design of pipes shall be as
per IS:458:2003.
SAMPLING AND INSPECTION
In any consignment, all the pipes of same class and size and manufactured under similar conditions
of production shall be grouped together to constitute a lot. The conformity of a lot to the requirements of
this specification shall be ascertained on the basis of tests on pipes selected from it.
The number of pipes to be selected from the lot for testing shall be in accordance with Table 15 of
IS:458 (Latest Edition). Pipes shall be selected at random. In order to ensure randomness, all the pipes in
the lot may be arranged in a serial order and starting from any pipe, every ‘n’th pipe be selected till the
requisite number is obtained, n being the integral part of N/n, where N is the lot size and n is the sample
All pipes selected as per IS : 458 shall be inspected for dimensional requirements, finish and deviation from
straight. A pipe failing to satisfy one or more of these requirements shall be considered as defective. The
number of pipes to be tested for tests under IS : 458 shall be in accordance with column 4 of Table 15 of
IS:458 (Latest Edition). These pipes shall be selected from pipes that have satisfied the requirements
mentioned in Clause above. A lot shall be considered as conforming to the requirements of IS:458 (Latest
Edition) of the following conditions are satisfied.
(a) The number of defective pipes shall not be more than the permissible number given in column 3 of
Table 15 of IS:458 (Latest Edition).
(b) All the pipes tested for various tests as per IS-458 shall satisfy corresponding requirements of the tests.
(c) In case the number of pipes not satisfying requirements of any one or more tests, one or two further
samples of same size shall be selected and tested for the test or tests in which failure has occurred. All
these pipes shall satisfy the corresponding requirements of the test.
The following information shall be clearly marked on each pipe :
a) Internal diameter of pipe
b) Class of pipe
c) Date of manufacture, and
d) Name of manufacturer or his registered trademark or both.
LAYING OF PIPES
The laying of RCC pipes shall conform to Technical Specifications: Section-D-6.3
Jointing of RCC pipes shall be done with SRC cement only and as per the requirements of following
specifications and as per the relevant IS. The type of joints shall be as below. After jointing, extraneous
material, if any, shall be removed from the inside of the pipe and the newly made joints shall be
thoroughly cured. In case, rubber-sealing rings are used for jointing, these shall conform to IS 5382 and
shall be of such type as mentioned in IS- 458:2003.
FLUSH JOINT (INTERNAL)
This joint shall be generally used for culvert pipes of 900-mm diameter and over. The ends of the
pipes are specially shaped to form a self-centering joint with an internal jointing space 13-mm wide. The
finished joint is flush with both inside and outside with the pipe wall. The jointing space is filled with
cement mortar in the proportion as specified in IS-458-2003, mixed sufficiently dry to remain in position
when forced with a trowel or rammed.
FLUSH JOINT (EXTERNAL)
This joint is suitable for pipes which are too small for jointing from inside. This joint is composed of
specially shaped pipe ends. Each end shall be butted against each other and adjusted in correct position.
The jointing space shall then be filled with cement mortar as specified in IS-458-2003, sufficiently dry and
finished off flush. Great care shall be taken to ensure that the projecting ends are not damaged as no
repairs can be readily affected from inside the pipe.
SPIGOT AND SOCKET JOINT (FLEXIBLE)
The RCC pipe with the rubber ring accurately positioned on the spigot shall be pushed well home
into the socket of the previously laid pipe by means of uniformly applied pressure with the aid of a jack or
similar appliance. The RCC pipes shall be of spigot and socket type and rubber rings as specified in IS-
4582003, shall be used, and the manufacturers instructions shall be deemed t form a part of these
specifications. The rubber rings shall be lubricated before making the joint and the lubricant shall be soft
soap water or an approved lubricant supplied by the manufacturer. Socket & Spigot NP3 & NP4 pipe with
rubber ring roll on joint for diameter upto 900 mm should be provided as per <able 14 pf IS 458 :
Socket & spigot NP3 & NP4 pipe with rubber ring confined joint for diameter 1000 mm to 2200 mm should
be provided as per
Table -17 of IS 458:2003.
CLEANING OF PIPES
As soon as a stretch of RCC pipes has been laid complete from manhole to manhole or for a stretch as
directed by Owner/Engineer, contractor shall run through the pipes both backwards and forwards a
double disc or solid or closed cylinder 75 mm less in diameter than the internal diameter of pipes. The
open end of the incomplete stretch of pipeline shall be securely closed as
may be directed by Owner/Engineer to prevent entry of mud or silt etc.
If as a result of the removal of any obstructions Owner/Engineer considers that damages may have
been caused to the pipelines, he shall be entitled to order the stretch to be tested immediately. Should
such test prove unsatisfactory, contractor shall amend the work and carry out such further tests as are
required by Owner/Engineer.
It shall also be ascertained by contractor that each stretch from manhole to manhole or the stretch
as directed by Engineer is absolutely clear and without any obstruction by means of visual examination of
the interior of the pipeline suitably enlighten
All RCC pipes shall be measured according to the work actually done and no allowance will be made for
any waste in cutting to the exact length required. The measurement for pipes shall be in running meter
nearest to a cm. of length along the centre line of pipe as actually laid at work sites.
The rate for providing, laying and jointing of RCC pipes shall be deemed to include the cost of rubber rings,
jointing material, testing and extra excavation required for ordinary bedding of pipes and also for pipe
sockets, if any.
• If any damage is caused to the pipeline during the execution of work or while cleaning/testing the
pipeline as specified. Contractor shall be held responsiblefor the same and shall replace the damaged
pipeline and retest the same at his own cost to the full satisfaction of Engineer.
• Water for testing of pipeline shall be arranged by Contractor at his own cost.
• Pipes shall be brought on site proportionate to the required progress for
Thirty days only.
The M/s shall be on Rmt. basis.
Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for foundation, C.C.Channel
(1:2:4), finished 15 mm thick cement plaster inside in CM 1:3, finishing with cement slurry, Brick masonary in CM
1:5 & excluding the cost of chamber seat cover etc..completed.
Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for foundation, C.C.Channel
(1:2:4), finished 15 mm thick cement plaster inside in CM 1:3, finishing with cement slurry, Brick masonary in CM
1:5 & excluding the cost of chamber seat cover etc..completed.
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=150 mm.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter for pipe dia <=20 mm
Mode of measurement:
The rate shall be for a unit of one number basis.
Constructing Slab type M.H. Chamber of the following size including excavation, refilling, brick bats cement
concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness 10 C.M., finished 15 mm thick cement
plaster inside & outside (Only for shaft) in CM 1:3, finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE
coated steps 35 cm c/c at 35 cm staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M.,
including Cantering & reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding the cost of
Manhole seat cover etc..completed. of Size 1.00 X 1.40 meter (Inside Clear,
M.H. length should be parallel to the flow, for pipe dia <= 800 mm)
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm
water drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as
possoble. The maximum distance between inspection chambers shall be about 25 meters. Where the
diameter of sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary
slope given to the channel of manhole/inspection chamber. The minimum internal sizes of
manhole/inspection chamber shall be as per the respective item of work. The manhole/inspection
chamber shall be constructed as per the detailed drawings and as directed by Engineer. The bed concrete
and the brick masonry shall be constructed of such thickness as shown on drawing. The brick masonry
shall be constructed in C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster
in C.M. (1:3). The channel shall be semicircular in the bottom half and of diameter equal to the
sewer/drain. Above the horizontal diameter, the sides shall be extended vertically to the same level as the
crown of the outgoing pipe and the top edge shall be suitable rounded off. The branch channels shall also
be similarly constructed with respect to the benching out at their junction with the main channel as
appropriate fall suitable rounded off in the direction of flow in the main channel shall be given. The
channel at the bottom of manhole / inspection chamber shall be plastered with C.M. (1:3) and finished
smooth. Rungs shall be provided in all manholes/inspection chambers over 0.6 mtr in depth and shall be of
cast iron conforming to IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm apart
horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below the manhole/ inspection
chamber cover and the lowest not more than 300 mm above the benching. The manhole/inspection
chamber frame and cover shall be of cast iron of specified weight and shall conform to the requirements
given in IS:1726. The covers and frames shall be cleanly cast and they shall be free from air and sand holes
and from clod shuts. They shall be neatly dressed and carefully trimmed. All castings shall be free from
voids whether due to shrinkage, gas inclusion or other causes. Covers shall have a raised chequered design
on the top surface to provide an adequered nonslip grip. Cover shall be capable of easy opening and
closing and it shall be fitted in the frame in workmanship like manner. The cover shall be gas tight and
water tight. The size of covers specified shall be considered as the clear internal dimensions of the frame.
Covers and frames shall be coated with a black bituminous composition. The coating shall be smooth and
tenaceous. The frame of manhole/inspection chamber cover shall be firmly embeded to correct alignment
and level in cement concrete on the top of the masonry. The item shall be executed as per the detailed
drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed by engineer
in charge or Additional City Engineer (New West Zone zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
1.00 to 2.00 meter depth,
(Slab at Ground level)
2.00 to 3.00 meter depth,
(Slab at below 0.6 mt. From G.L.)
3.00 to 4.00 meter depth,
(Slab at below 1.00 mt. From G.L.)
Mode of measurement:
The rate shall be for a unit of one number basis.
ITEM NO : Extra rate over item of Constructing Slab Type M.H.Chamber of following size for constructing M.H.
Chamber, per 1.00 Decimetre of additional depth or part thereof. etc. complete. Of size 1.00 x 1.40 mt. (inside
clear) and Depth from (Based on Drainage SOR 2009-10)
Extra rate over item of Constructing Slab Type M.H.
Chamber of following size for constructing M.H. Chamber, per 1.00 Decimetre of additional depth or part thereof.
etc. complete. Of size 1.00 x 1.40 mt. (inside clear) and Depth from (Based on Drainage SOR 2009-10)
Mode of measurement:
The rate shall be for a unit of desi metre basis.
Making connecting to the ex. M.H. in running sewer of following dia. pipes, at any convinent time when M.H. is
found empty. All damaged work shall be well repaired as per inst.etc.comp.
Making connecting to the ex. M.H. in running sewer of following dia. pipes, at any convinent time
when M.H. is found empty. All damaged work shall be well repaired as per inst.etc.comp.
(A) 150 MM TO 300 MM DIA.
(B) 300 MM TO 450 MM DIA
(C) 700 MM TO 900 MM DIA
The rate shall be for a unit of one number basis.
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed. (Based on rate of central store)
(a) F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø & 100 mm thick circular
cover, 35.00 MT load design, 100x2mm MS flat all round, 16mm ø plain round bar for lifting the cover
& should be fitted with plastic cups. Frame : 560 mm ø clear opening, outer size- 888x888x175 mm. On
the upper periphery of frame 25 x 3 mm wide MS flat should be well embed in concrete to protect the
edges of frame. FRC E.H.D.-35 manhole cover & frame described as above.
(b) FRC heavy duty cover size 730 mm. & 90 mm thick circularcover 20 M.T. design load and frame size
560 mm clear opening size 890 x 890 x 120 mm. The rate shall be for a unit of one number basis.
(c) FRC medium duty cover size 670 mm dia & 70 mm thick 10 M.T. load design and frame size 560 mm
clear opening outer size 780 x 780 x 120 mm
ITEM NO. Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match
exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc. complete as
directed. M.H. seat cover will be supplied byA.M.C.(from any store) (Based on Drainage SOR 2009-10)
Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match exisisting road level in C.C.
1:2:4 and finishing smooth, watering and protecting for 7 days etc. complete as directed. M.H. seat cover will be
supplied byA.M.C.(from any store) (Based on Drainage SOR 2009-10)
The M/s shall be on No. basis.
Providing Kachha of Pakka Dummy in the following dia pipes and removing the same after completion of the
connection work as directed. (Based on Drainage SOR 2009-10)
Providing Kachha of Pakka Dummy in the following dia pipes and removing the same after completion of the
connection work as directed. (Based on Drainage SOR 2009-10)
The rate shall be for a unit of No. basis.
Supplying, labour for break down repairing work for activities like excavation, disliting, removing debris from
trench back filling etc. comp. as directed by Eng.in charge.(Based on Building SOR 2015-16)
Supplying, labour for break down repairing work for activities like excavation, disliting, removing debris from
trench back filling etc. comp. as directed by Eng.in charge.(Based on Building SOR 2015-16)
Mazdoor at day /Night
Makadam/ supervision at day / Night
Measurement shall be paid by No. basis.
Barricading the entire break down or excavated area on rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to avoid accident & for smooth traffic
diversion & movement including cautionary board etc. Item also includes for making temporary sufficient nos of
lighting arrangement through out the work with necessary required arrangement.The same shall be removed
after completion of work. (Only for break down work from start to complete) (Based on Drainage SOR 2009-10)
Barricading the entire break down or excavated area on rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to avoid accident & for smooth traffic
diversion & movement including cautionary board etc. Item also includes for making temporary sufficient nos of
lighting arrangement through out the work with necessary required arrangement.The same shall be removed after
completion of work. (Only for break down work from start to complete) (Based on Drainage SOR 2009-10)
Measurement shall be paid by Rmt. basis.
Item No.:- Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with 40 mm thick IPS flooring in the prop
M15 at bottom and 15 mm thick cement plaster inside the catch pit in the proportion of CM (1:3) with out jali
etc. comp. as directed. (As per R.A. Based on Building SOR 2015-16)
Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including excavation, B.B.C.C.
(1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at
bottom and 15 mm thick cement plaster inside the catch pit in the proportion of CM (1:3) with out jali etc. comp.
as directed. (As per R.A. Based on Building SOR 2015-16)
Measurement shall be given on No.basis.
Item No. :- CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc. comp.. As
directed by engineer in charge. (Based on Central Store Rate)
CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc. comp.. As directed by
engineer in charge. (Based on Central Store Rate)
Measurement shall be given on No.basis.
Providing TMT Bar FE415 reinforcement for R.C.C. work including bending, binding and placing in position
complete upto floor two level (upto 10 ton)
Providing TMT Bar FE415 reinforcement for R.C.C. work including bending, binding and placing in position
complete upto floor two level (upto 10 ton)
Measurement shall be paid by Kg.basis.
Brickwork using common burnt clay building bricks having crushing strength not less than 35kg./Sq.Cm.in
foundation and plinth in Cement Mortar 1:6 (1-Cement:6-finesand) (B) Conventional (upto 10 ton)
Materials: Bricks shall conform to M-15. Cement mortar shall conform M-11.
The relevant specifications of item No. 4 a shall be followed except that the masonry work shall be carried out
above plinth level to floor four level i.e. up to Third floor.
The frames of doors, windows, cupboards, etc. shall be housed into the brick work at the correct location and level
as directed. The heavy steel doors, window frames etc. shall be built in with brick work but for ordinary steel doors
and windows required opening for frames, hold fasts etc. shall be left in the wall and frames embedded later on in
order to avoid damage to the frames.
Necessary scaffolding shall be provided. The supports of the scaffolding shall be sound and strong tied together
with horizontal pieces over which the scaffolding planks shall be fixed. Simple scaffolding shall be allowed
normally. In this case scaffolding hole shall rest in hold header horizontal coarse only. Minimum number of holes
shall be left in brick work for supporting horizontal scaffolding holes.
The contractor is responsible for providing and maintaining sufficiently strong scaffolding so as to withstand all
loads likely to come upon it.
For the face of brick work where plastering is to be done joints shall be racked out to a depth not less than
thickness of joints. The face of brick work shall be cleaned and mortar dropping removed on very same day that
brick work is laid.
Mode of measurement: Cmt
Item No.: Providing 15 mm thick cement plaster in single coat on Rough (Similar) side of single or half brick walls
for interior plastering upto floor two level and finished even and smooth in (i) Cement mortar1:3 (1-cement:3-
Providing 15 mm thick cement plaster in single coat on Rough (Similar) side of single or half brick walls for interior
plastering upto floor two level and finished even and smooth in (i) Cement mortar1:3 (1-cement:3-sand)
Mode of measurement:
Measurement shall be paid by Smt.basis
Item No.: Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete work in (A) Foundations ,footings, Baseof columns and
Mass concrete (upto 10 ton)
Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations ,footings, Baseof columns and Mass concrete (upto
Mode of measurement:
Measurement shall be paid by Cmt.basis.
Item No.: Supplying Potable Water Tanker to be filled from nearby water distribution station of AMC. with
meter Delivery Pipe. The tanker should be supplied as & where reuired & when order placed by Engineer In -
Charge The rate includes the fuel charge, driver's charge etc..complete.
Supplying Potable Water Tanker to be filled from nearby water distribution station of AMC. with 30 meter
Delivery Pipe. The tanker should be supplied as & where reuired & when order placed by Engineer In - Charge The
rate includes the fuel charge, driver's charge etc..complete.
Mode of measurement:
Measurement shall be paid by No.basis.
Item No.: Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH sheet cover,
removing the debris from MH and carting the same as directed. (Based on Drainage SOR 2009-10)
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work and repairing by
brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the
debris from MH and carting the same as directed. (Based on Drainage SOR 2009-10)
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
Mode of measurement:
Measurement shall be paid by No.basis.
ITEM NO. Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed
etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working condition
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed etc.
comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working condition of
Payment shall be given in Shift. basis.
ITEM NO. Hiring and operating the 20 KV 3 Phase Electric Generator for operating desilting machinery, and
lighting and other requirements with Arranging diesel to run the D.G. Set Do As Directed. 8 Hrs Shift. ( No
payment should be allowed for non working condition of machinery ) ( Based on Previously approved rate by C E
Hiring and operating the 20 KV 3 Phase Electric Generator for operating desilting machinery, and lighting and other
requirements with Arranging diesel to run the D.G. Set Do As Directed. 8 Hrs Shift. (No payment should be allowed
for non working condition of machinery ) ( Based on Previously approved rate by C E sir )
Payment shall be given in Shift. basis.
ITEM NO. Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down
type work & also during unavoidable condition as per instruction of engg.incharge , rate includes all nece.
shifting, fuel and operating charges and stacking of useful & non-useful materials separately up to store. (No
payment should be allowed for non working condition of machinery and for pipe line excavation and laying
work) ( Based on Previously approved rate by C E sir )
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down type work &
also during unavoidable condition as per instruction of engg.incharge , rate includes all nece. shifting, fuel and
operating charges and stacking of useful & non-useful materials separately up to store. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and laying work) ( Based on
Previously approved rate by C E sir )
Payment shall be given in Hr. basis.
ITEM NO. To provide Tractor with Hydraulic Trolley, driver with fuel, to carryout different works during day/night for
12 Hrs. Shift. Work shall be carried out as per the instructions of Engineer In-Charge. No extra charged shall be paid
for night shift.
To provide Tractor with Hydraulic Trolley, driver with fuel, to carryout different works during day/night for 12 Hrs. Shift.
Work shall be carried out as per the instructions of Engineer In-Charge. No extra charged shall be paid for night shift.
Payment shall be given in Shift basis
ITEM NO. Supplying Electric Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using Operator,
fuel, power Supply etc. Complete as Directed. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and M.H. work. Allowed only for break down work) ( Based on Previously
approved rate by C E sir )
Supplying Electric Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using Operator, fuel, power
Supply etc. Complete as Directed. (No payment should be allowed for non working condition of machinery and for pipe
line excavation and M.H. work. Allowed only for break down work) ( Based on Previously approved rate by C E sir )
Payment shall be given in Shift basis.
ITEM NO. ;manufactured and Supply and delivery of Chemical febricated RCC precast chamber with top cover as per
specficationi and drawing attachded with the tender documents for sizes as mentioned below.The delivety of
chambers with clamps,nuts bolts and locking arrangmens (without lock)is to be made to GWSSB sotres or sites any
whter in gujarat.The rates includes all taxes, loading, Carting, unloading stacking, including all taxes
A ) 60x60x90 cm deep (suitable to 80 to 300 mm dia pipes)
B) Foot rests for above chamber
c)90x90x145 cm deep (Suitable for 350 to 600 mm dia pipes)\
D)Foot rests for above chambers
E)Rates for providing Top Cover only
for 60x60 cms size chamber
for 90x90 cms size chamber
Payment shall be given in Nos basis.
Providing and lying of Class SN8 Structured wall polyethene piping systems (pipe with onlin/offline coupler and
elstomeric sealing ring ) with non smooth external annular corrugated ans smooth internal surfaces (Double wall )
for non pressure undregroudn sewerages & Drainage application as per EN : 13476-3 including all local and central
taxes,transporation ,freight charges,octroi,inspection charges,loading, unloading ,conveyace to the departmental
stores etc.comleed (ID dia)
Payment shall be given in RMt basis.
Hiring and operating Mud Pumps incl. Cost of fuel and operator including the cost of to and fro transportation,
laying of the delivery hoses as required, lowering and lifting the pumps as and when required etc. complete. Set Do
As Directed. (No payment should be allowed for non working condition of machinery)
Payment shall be given in H.P/Hr basis.
Providing & Supplying Hitachi Machine-110 capacity on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of engg. in charge, rate includes all
nece. shifting, fuel and operating charges . (No payment should be allowed for non working condition of
Payment shall be given in Hr. basis.
Providing & Supplying Hitachi Machine-200 capacity on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of engg.incharge , rate includes all nece.
shifting, fuel and operating charges. (No payment should be allowed for non working condition of machinery)
Payment shall be given in Hr. basis.
Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in case of emergency situation
and break down type work & also during unavoidable condition as per instruction of engg. in charge, rate
includes all nece. shifting, fuel and operating charges. (No payment should be allowed for non working
condition of machinery)
Payment shall be given in Per 8 hr Shift basis.
CONTRACTOR'S SIGNATURE Add.City Engineer
& STAMP (North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
As per City Engineer’s circular no.-6/2011-12 Dt.24.6.2011 all terms & conditions will be
Seal and Signature of the Bidder Add.City Engineer
Date: (North West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
T.NO.97-Drainage Line Machinehole TP-37-38 tender.pdf
T.NO.97-Drainage Line Machinehole TP-37-38.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].