| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-Finance | ₹12.4 L | L1 | Accepted-Finance Accept |
| 2 | L2₹13.5 L+₹1.1 L (8.43%)Accepted-Finance | ₹13.5 L+₹1.1 L (8.43%) | L2 | Accepted-Finance Accept |
Tender Value
₹12.5 L
EMD Value
₹25,000
Closing Date
28 Feb 2022, 4:00 pmClosed
Executive Engineer Irrigation and FC Divn Nowshera
Executive Engineer Irrigation and FC Divn Nowshera
Preparation of Detailed Project Report for construction of Lift Irrigation Scheme Beri Pattan at Sunderbani ,District Rajouri
2022_IFC_161074_1
Fresh e-NIT No. 44 of 2021-22.
Open Tender
Survey
Item Rate
90 days
Nowshera
As per NIT
4 documents required · 4 mandatory
₹3,000
Yes
Executive Engineer Irrigation and FC Divn Nowshera
₹25,000
Yes
8 Mar 2022
18 Feb 2022
2 Mar 2022
18 Feb 2022
28 Feb 2022
21 Feb 2022
19 Feb 2022 - 19 Feb 2022
Amount
Conducting of Detailed survey (l-section,cross section and contouring) for construction of Pump station ,risinig main, delivery tank ,canal net work (main canal and its distribution network) at the existing alignment and best possible alternative alignment.(Tentaive length 18 Km). Time allowed Day 1 to Day 20
Preparing of site plan showing lift Irrigation Scheme location of Intake Structures ,Rising Mains,Delivery Tank,Canal Network including distribution network along with levels, important Land Marks 5 sets & soft copy on 1 in 5000 readily visible. Time allowed Day 1 to Day 10
Locating the Intake Structures ,alignment of Rising Mains,Delivery Tank,Canal Network including distribution network,Approach roads to intake structure (Physically on ground by fixing concrete blocks of size (0.15x0.15x0.6) in 1:3:6 ratio @100Mtrs Centre to centre of the alignment and drawings) to irrigate these areas in nowshera including identification of all structures or retaining walls ,cross drainage structures ie Aqueducts ,Syphon etc,for each of these 12no villages . Time allowed Day 1 to Day 10
Proposal /modification to the existing structures already constructed structures of lift irrigation scheme Berri Pattan Time allowed Day 1 to Day 3
Preparing /submitting the preliminary Draft Project Report as per the formats/norms of Central Water Commission including all information required for Project clearance like Cost Benefit Ratio (CBR) ratio,L-Section ,X-Sections drawings,BOQ and estimates based on SSR2020 their enhancements to present market rate etc (with permissible assumptions of for remaining data).,Irrigation & Flood Control Department Nowshera shall provide the possible help but consultant shall be mainly responsible for all activities of preparation of this project report. Time allowed Day 1 to Day 20
Getting the preliminary /Draft project Report vetted from Central water Commission ,revision as per feedback . Time Allowed =Minimum possible)
Working out the hydraulic design of lift irrigation scheme including intake structures,Approach Roads,Foot Bridge (if required),Pumping machinery,Electric Switch Gear,Voltage Stablizer,rising main including fixing alignment and engineering of canal network falls ,delivery tank ,valves,structures etc. Complete lift station up to field Ie Moga along with complete working drawings for lift schemes Time allowed =Day 1 to Day 10
Preparing the Detail Project Report as per the format/norms of Central Water Commission including all information like Cost Benefit Ratio (CBR) ,L-Section ,X-Sections complete drawings,BOQ and estimates based on SSR2020 their enhancements to present market rate etc .Irrigation & Flood Control Department Nowshera shall provide the possible help but consultant shall be mainly responsible for all the activity of preparing the Detailed Project Report of Lift Irrigation Scheme for providing water to 12 no villages (Complete Job ) . Time allowed Day 1 to Day 30
Getting project report vetted from Central water commission , revision as per feed back. Time allowed Day -100 days onwards in minimum possible time as per guidelines of central water commission.
R and T Assocaites
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .