Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | -22.11% | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.5 L+₹66,310.74 (9.64%)Admitted-Finance | -14.60% | ₹7.5 L+₹66,310.74 (9.64%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹8.8 L
EMD Value
₹17,660
Closing Date
14 Aug 2026, 6:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA TINWARI
Construction Of Toilet At Municipal Office Tinwari.
2026_DLB_583860_3
NPT/1518
Open Tender
Civil Works
Percentage
NAGAR PALIKA TINWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MDRISL JAIPUR/EO NAGAR PALIKA TINWARI
₹17,660
Yes
18 Aug 2026
7 Aug 2026
15 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 18 | CUM | 229.5 | ₹4,131 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 3.53 | CUM | 4,575 | ₹16,149.75 |
| 3 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 18.74 | CUM | 4,860 | ₹91,076.4 |
| 4 | Filling with locally available river sand at all levels including watering ramming consolidating and dressing complete including cost of sand. | 17.32 | CUM | 1,013 | ₹17,545.16 |
| 5 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete Mild steel and Medium Tensile steel bars. | 700 | KG | 81.8 | ₹57,260 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm
nominal size). (As per design mix) | 3.98 | CUM | 6,410 | ₹25,511.8 |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories (each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform. | 18.34 | SQM | 456 | ₹8,363.04 |
| 8 | Random rubble masonry with hard stone in foundation and plinth Cement mortar 1:6 (1 cement : 6 coarse sand) Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories. | 29.88 | CUM | 5,830 | ₹1,74,200.4 |
| 9 | Half brick masonry with FPS brick of class designation 75 in foundations and plinth in :cement mortar 1:4 (1 cement : 4 coarse sand) | 24.6 | SQM | 674 | ₹16,580.4 |
| 10 | Stone work (machine cut edges) for wall lining etc. (veneer work) backing filled with a grout of 12mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing by means of cramps which shall be paid for separately) : Red sand stone - exposed face fine dressed with rough backing. 70 mm thick. | 25.9 | SQM | 2,293 | ₹59,388.7 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1037137.xls
BOQ • 0.37 MB
CORRIGENDUME1518.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .