Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 4 295 SECTOR NEAR DELHI PUBLIC SCHOOL GOMTI NAGAR LUCKNOW 226010 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical ADD EKAUNA BAIPAS DISTRICT SHRAWASTI | SHRAVASTI | UTTAR PRADESH | 271201 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical 106 VISHNUPURI COLONY CIVIL LINE DISTT GONDA | GONDA | GONDA | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
Tender Value
₹4.2 Cr
EMD Value
₹7.3 L
Closing Date
6 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of Superintending Engineer Irrigation Construction Circle Bahraich
Protection work of Slope Pitching of both banks between Km 0.026 To Km 0.700 of Saryu Link Channel in District Bahraich (Lot-11)
2026_UPIDC_1201572_11
11/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
240 days
Bahraich
Plz Refer Tender Document
2 documents required · 2 mandatory
₹2,354
₹7.3 L
Yes
6 Nov 2026
29 Oct 2026
6 Nov 2026
30 Oct 2026
6 Nov 2026
30 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation for laying apron and slope pitching manually or by machine where ever possible in all type of soil including all lead and lift , manual compaction and dressing to profile with disposal of earth for proper completion of work as per direction of engineer in charge with all taxes. But excluding Cost of GST. | 4,956.92 | Cum | - | - |
| 2 | Earth work for Recoupement of canal section in all type of soil including all lead and lift, manual compaction and dressing to profile for proper completion of work as per direction of engineer in charge with all taxes. But excluding Cost of GST. | 10,403.5 | Cum | - | - |
| 3 | Supplying and Laying Geo Textile (Sheet ) made of 240 GSM (of Multifilament polypropylene yarn) in filter including cost of all material, all lead, lift labour and T & P etc. required for proper completion of work as per direction of engineer in charge with all taxes. But excluding Cost of GST. | 9,193.18 | SqM | - | - |
| 4 | Supplying and filling 50 mm thick local sand below boulders including cost of all material, all lead & lift, labour and T & P etc.required for proper completion of work as per direction of engineer in charge with all taxes. But excluding Cost of GST. | 459.66 | Cum | - | - |
| 5 | Supplying of 40-60kg size Mirzapur stone boulder at stock point Girijapuri and dumping the same in wire crate (of Galvanised steel wire with polymer coated) size 3.00 x 2.00 x 1.00 mtr in launching appron including carriage from stock yard, cost of boulder, crate all labour, including lead and lift and T&P etc, required for proper completion of the work. But excluding Cost of GST. | 200 | Nos | - | - |
| 6 | Supplying of 40-60 kg size Mirzapur stone boulder at stock point Girijapuri and dumping the same in bed launching without wire crate including carriage from stock yard, cost of boulde, including lead and lift and T&P etc. for required for proper completion of the work. But excluding Cost of GST. | 3,466.36 | Cum | - | - |
| 7 | Laying P.C.C. 1 : 3 : 6 (M10, A40) in foundation with 20-40mm size crushed stone balast and coarse sand having F.M not less then 2 including all cost of labour,material and T&P etc. required for proper completion of the work. But excluding Cost of GST. | 329.46 | Cum | - | - |
| 8 | First class Brick work in 1: 4 C.M. with coarse sand of F.M. not less than 2.00 including cost all material, Labour & T & P required for proper completion of work. But excluding Cost of GST. | 330.52 | Cum | - | - |
| 9 | Cement Pointing (Struct deep) in 1 : 2 C.M. with coarse sand including cost of all material, Labour and T & P required for proper compleation of work. But excluding Cost of GST. | 1,010.35 | SqM | - | - |
| 10 | Heavy Jungle Clearance with Thorney Bushes on both banks of SLC including cost of all material, Labour and T & P required for proper compleation of work. But excluding Cost of GST. | 10,915.05 | SqM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BID_SlopePitchingSLC_Lot_11.pdf
Tender Documents • 2.03 MB
BOQ_2275238.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .