Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹25.6 L
Closing Date
7 Oct 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB Division Ganderbal.
Executive Engineer RnB Division Ganderbal.
Construction of Deep drain at Gangrerhama. Name of the Scheme-Constt of road from Gangerhama tp wayil Bridge Phase-I under NABARD RIDF-XXI
2021_PWDJK_141481_1
NIT NO.165--/2021-22
Open Tender
Civil Works
Item Rate
30 days
Ganderbal
As per NIT
2 documents required · 2 mandatory
₹1,100
Yes
Executive Engineer RnB Division Ganderbal.
Exempted
8 Oct 2021
2 Oct 2021
8 Oct 2021
2 Oct 2021
7 Oct 2021
2 Oct 2021
120 days
Amount
Earth work in excavation in all kinds of soil by manual or mechanical means in trenches for foundation, drains, pipes, cables etc., up to required width and depth including ramming of bottom and dressing of sides, clearing of vegetation and mulba and disposal of excavated material beyond municipal limits with its leads, lifts and carriage complete.
P/L, of stone soling 75 mm nominal size duly hand packed with ramming, dressing, watering and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete.
P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to plinth level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) all complete.
P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All works up to required level in 1:3:6 (1cement: 3 coarse sand: 6 graded stone aggregate of 20 mm Nominal size (Crushed) all complete.
P/L, in position reinforced cement concrete of specified grade upto Floor V-Level excluding the cost of centering & shuttering. in 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate of 20 mm Nominal size Crushed in foundation,Suspended floors, Raft etc all Complete.
Reinforcement of R.C.C work incld straightening, cutting, bending, placing in position and binding all complete:- (Thermo Mechanically Treated Bars.) Tar steel (TMT) shall be provided from Divisional Store on existing stock rates.
Centering and shuttering incld. strutting ,propping etc. and removal of form work for foundation, footings, Bases of columns, walls, etc complete.
Providing and Laying of Mild Steel man hole covers of required size with angle Iron frames incl. welding, cutting etc complete in all respects.
50mm thick cement concrete flooring 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size nallah) finished with a floating coat of neat cement including cement slurry but excluding the cost of nosing of steps etc complete.
Supply & filling of GSB/Nallah Muck under floors including watering, ramming, , dressing, wateriling, levelling nclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete.
Supply, stacking and laying of WBM grade 2nd with specified graded stone aggregate 63mm - 45mm size broken quarry stone @0.92cum/10 sqm and using of screening 13.20mm size @ 0.135cum/10sqm and binding material @0.06cum/10sqm of road surface including sorting, spreading to template, watering and consolidation to required gradient and camber with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from nearest approved source to site of work complete (To be laid as per guide line of MOST specification). Finished work to be measured and paid.
Carriage of materials by mechaanical transport from source to site of work incl. loading and unloading complete.
Stone aggregate upto 40mm from Safapora for an average lead of 15 Kms.
Sand from Ganderbal for an average lead of 7 Kms
SAJAD AHMAD BHAT
ADNAN CONSTRUCTIONS
M/S SOFI BUILDERS
SHEIKH CONSTRUCTIONS
M D CONSTRUCTIONS
M/S ALI MOHD SOFI
M/S NAZIR AHMAD RATHER
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .