| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.9 LAccepted-AOC | L1 | Accepted-AOC Lowest and reasonable | |
| 2 | L2₹99.1 L+₹19.2 L (24.0%)Rejected-AOC | L2 | Rejected-AOC Not lowest | |
| 3 | L3₹1.1 Cr+₹30.1 L (37.7%)Rejected-AOC B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | L3 | Rejected-AOC Not lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical Not fulfilling the eligibility criteria as per NIT | |
| 5 | Rejected-Technical | - | Rejected-Technical Not fulfilling the eligibility criteria as per NIT |
| Sl No | Description | Qty | Unit | GEO DESIGNS AND RESEARCH PVT LTD L3 | M/S HIERARCHY STRUCTURES L2 | Urban Atelier L1 |
|---|---|---|---|---|---|---|
| 1.00 | Provision of complete consultancy services ( as listed below in Item No 1.00 to 1.90) as per relevent IS code practice and standard Engineering Norms and practices complete all as specified and as directed.
A- Soil Investigation- Soil Investigation by doing bore holes having dia 100 to 150 mm upto 10 mtr below MGL for 34 Nos bore.
(aa) Preparation/Drilling of bore holes having dia 100 to 150 mm upto 10 mtr below MGL upto the hard strata. Rock or refusal whichever occurs earlier for building including boring, sampling, Para (a) to (e). Each bore hole depth should be minimum 10 mtr. Sampling shall be done as per relevant latest IS Codes (1982-2021) complete and as directed by Engr-in-Charge.
(a) Above test shall include carrying out of SPT and collecting disturbed & undisturbed saniples as per IS code and up to 1 mtr interval or at every change of strata.
(b) Carrying out laboratory tests with the disturbed / undisturbed sampling and find out grain size analysis, classification, consistency, density, Atterberg limits, FMC/OMC, analysis conducted as per relevant IS code. (c) Evaluate allowable bearing capacity / SBC of soil by analytical methods.
(d) Submission of 3 copies report of soil investigation report and other details including making of bore hole logs.
(e) In soil test report recommendation of SBC should give for all bore holes for minimum three depths for each bore hole.
(f) Recommendation of footing type minimum foundation size as under: 1.5x 1.5m, 1.5 x 2.5m, 2.0 x 2.5m, 2.0 x 3.0 m
(g) All testing shall be carried out as per relevant and latest IS code provision. (h) Photographic record of geo-exploration and testing shall also be a part of report.
(i) Location plan of bore holes and section showing stratification in summary form (highest & lowest) and seasonal variation of water table should be mentioned in the report.
(j) Recommendation with respect to liquefaction potential of soil in case of saturated or partially saturated soil.
(k) Recommendation with respect to swelling potential of soil (i.e. Liquid limit, Plastic limit, Plasticity index & swelling pressure in respect of BC soil & its depth/layers). (l) Calculation ofSBC value at proposed depth need to be part of soil investigation.
(m) Estimation of pile capacity for one open capacity of different size of pile with calculations need to be part of soil investigation report.(n) Transport charges for equipment and machinery at site. (o) The location of bore holes shall be as directed by Engg-in-carge.
B. All as per item No A above but depth upto 15 mtr and 18 Nos bores.
C. All as per item No A above but depth upto 20 mtr and 19 Nos bores.
D. Plate Load Test for 14 Nos bores and also determine the 'K 'value on all those locations. | 1 | Each Job | 1,10,00,000 ₹1,10,00,000 | 99,10,500 ₹99,10,500 | 79,90,000 ₹79,90,000 Lowest |
| 1.10(a) Preparation, submission and finalization of Complete conceptual plans, Architectural Drawings (Site plans, Plans of all Buildings, all side elevations, Cut Sections, Various sections through Stairs, Critical sections, detailings showing internal fixtures, cupboards, kitchen details, toilet details, elevation feature details, Schedule of Finishes, Arch TD Drawings (in appropriate scales) in REVIT/AutoCad for Following Buildings, While preparing drawings the consultant shall adhere to scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws, BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. The above mentioned drawing shall be prepared in consultation/supervision of Architects of HQ CE 31 Zone (E-6 Section ) ,( E-2(Plg) Officers for Sch of Finishes ) and will have to approved by Accepting Officer before Finalization. Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm (iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm (ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm (iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm (iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm (v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm (vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm (vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm (vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm (ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm (x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | ||||||
| 1.20Note:-(i) All the above buildings shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating. (ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted. (iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings. (iv) The GRIHA registration charges shall be borne by the dept and rates quoted by Consultant are excluding the GRIHA registeration charges. The responsibility of registeration will rest with Consultant. He will be paid by GE on providing of receipt of registeration fee online through the department. The over all responsibility for GRIHA till completion of job will be of Consultant. ' (v) Signatures of GE and Users (through GE) shall be obtained on final layout and floor plans before preparation of detailed Arch/ Str Drawings. (vi) Levelling/Contour Survey at 3 mtr interval (with approximate area of 110000 Sqm ) of the plot area shall be carried out by Consultant before finalizing layout of Bldgs and Services. Level sheet shall be submitted in quadrapulicate. The same shall be included in Quoted rates. (vii) Being multi storied bldgs, the necessary fire clearance from CFEES or other Govt Agency is mandatory and the said provision has to be considered to be obtained by Consultant. | ||||||
| 1.30(b) Preparation, submission and finalization of Complete structural design and drawings for following buildings based on the architectural drawings prepared and approved vide Item No 1 above, While preparing drawings the consultant shall adhere to design parameters given in Tender documents, scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws and BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings., All these documents can be obtained from the office of HQ CE 31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of Design section officers of HQ CE 31 Zone (E-2 Design Section ) and will have to approved by Accepting Officer before Finalization.SBC report shall be provided by E-2(Des) Sec to consultant.for preparation of Str drgs. Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm (iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm (ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm (iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm (iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm (v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm (vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm (vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm (vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm (ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm (x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | ||||||
| 1.40Note:-(i) All the above buildings shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating. (ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted. (iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings. | ||||||
| 1.50(c) Preparation, submission and finalization of Complete Electrical & Mechanical services drawings, design calculations & detailed estimates with details showing internal electric supply, external electric supply, external water supply, Mechanical laundry, RO plant, passenger lifts, Goods lifts, solar power plant, CHS plant for space heating, firefighting system, Fire extinguishers, electric chimney for cook house, deep freezers, cassette type AC, Hot water Supply, solid waste management and fixing site for all E/M equipment. While preparing drawings the consultant shall adhere to Scale of Accomdation-2022, Zonal Specifications, IS Codes, NBC Codes, GRIHA rating system (For maximum star rating). ECBC Norms, CFEES (approval & recommendation), Local Bye laws, BPs and AE Part-II of the subject work. In case of any discrepancy between these documents the decision of accepting officer will be obtained before finalizing the drawings. All these documents can be obtained from the office of HQ Chief Engineer 31 Zone on any working Day. The above-mentioned drawings & estimates shall be prepared in consultation/supervision of E/M officers of HQ CE 31 Zone (E-4 section) and will have to approve by Accepting Officer before finalization. Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm (iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm (ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm (iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm (iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm (v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm (vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm (vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm (vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm (ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm (x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | ||||||
| 1.60Notes: - (i) The scheme of E/M portion of CHS will have to be get vetted from any IIT after obtaining go ahead from E-4 sec of HQ CE 31 Zone & the same will be submitted for final approval of accepting officer after vetting of IIT. The cost of vetting of all design from IIT shall deem to be included in quoted rates of consultant and nothing extra shall be paid for the same. (ii) For firefighting system, the entire scheme is to be vetted by CFEES. The consultant shall liaise and will get the scheme vetted by CFEES Delhi before submission to HQ CE 31 Zone. (iii) Before finalization of drawings and estimates of all E/M services, the consultant will also mark/finalize building such as plant rooms for CHS, Hot water supply, laundry plant. firefighting system etc and fixing space for solar power plant in architectural structural plan of this OTM accn work.(i) All the above buildings shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating. (iv) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted. (v) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings. | ||||||
| 1.70(d) Preparation, submission and finalization of Detailed Estimates,Yardsticks and Market rate analysis (on prescribed format for the same used in MES) for following buildings and services based on drawings prepared and approved as per para 1 to 1.20 above. The estimates shall be based on rates given in SSR 2020 Part-II, , if rate of any Item is not availaible in SSR 2020 Part-II, the same should be applied based on Market rate of the Item reduced/enhanced to SSR 2020 Part-II, & by applying market variation percentage as per percentage over SSR for the relevent quarter circulated by HQ CE 31 Zone. All these documents can be obtained from the office of CE31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of Contract section officers of HQ CE 31 Zone (E-8 Section ) and will have to approved by Accepting Officer before Finalization. 'Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm (iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm (ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm (iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm (iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm (v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm (vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm (vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm (vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm (ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm (x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | ||||||
| 1.80(e) Submission of drawings and services plans prepared as per Item No 1 to 1.20 above to GRIHA Council/Secretariat and obtaining approval of GRIHA Council for the drawings and services plans as per GRIHA-3 star rating norms and submitting the 06 copies of Griha approved drawings to the office of CE 31 Zone in A-3 Size tracing sheet. (f) Laisioning and coordinating with GRIHA team for registration of the project by filling Expression of Interest form online on GRIHA Website and paying the required registration Fees to GRIHA Authorities, uploading relevent documents , responding to queries, observations, modifications and corrections given by GRIHA team with in specified time frame and reporting the same to HQ CE 31 Zone and obtaining Final registration certificate/ number including login id and password for the project from the GRIHA authorities, for following buildings. Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm (iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm (ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm (iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm (iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm (v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm (vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm (vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm (vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm (ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm. (x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | ||||||
| 1.90Notes for Item No 1 to 1.80 Above :- (i) The Fees required for registration of the project with GRIHA shall be paid firstly by the consultant to GRIHA authorities and after payment of fee to GRIHA, consultant shall submit the deposit receipt to GE and GE shall reimbursed the said amount to consultant. The quoted rates by the consultant shall be over and above of this aspect and GRIHA counsel fee is not included in the quoted rates. (ii) The Quoted Rates of the consultant shall deemed to be inclusive of Organising an orientation workshop by GRIHA Council officials to the Project construction Team , to be held at the office of HQ CE 31 Zone at Srinagar, after registration of the project on GRIHA portal/Website. (iii) The rates quoted by the consultant shall deem to be inclusive of at least 12 visits ie 04 visits Each for Architectural, Structural and Services drawings to office of HQ CE 31 Zone, Srinagar including the project site at old Air field , Each visit shall be consisting of One Week Maximum , including Lodging , boarding, Transport and food of consultant team to borne by consultant himself. and after every visit consultant or his rep will obtain a visit certificate from Adm Officer of CE 31 Zone indicating dates and number of days of visit. The Liasioning Officer in case of any difficulty will be SSW HQ CE 31 Zone. (iv) The unit " Each Job" mentioned in the BOQ Item no 1.00 shall consist of full and final completion of all the processes and requirements mentioned in Item No 1.00 to 1.80 above and also any other requirement/ process specifically not mentioned above but which is necessary for obtaining approval of GRIHA council for Drawings compliant with GRIHA- 3 star rating and registration of the project in GRIHA council . (v) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings. | ||||||
Tender Value
₹1.2 Cr
EMD Value
₹2.0 L
Closing Date
1 Sept 2026, 6:00 pmClosed
CE 31 Srinagar Zone
HQ CE 31 Srinagar Zone
COMPREHENSIVE CONSULTANCY SERVICES FOR SOIL INVEST, PREP OF ARCH, STRL DRGS, MEP SERVICES, ESTIMATE AND RATE ANALY ETC INCL APPROVAL OF DRGS FROM GRIHA 3 STAR RATING GREEN BLDG NORMS FOR PROVN OF OTM ACCN FOR CESR AT OAF UNDER AGE(I) (P) SRINAGAR
2026_MES_784047_1
800231
Open Tender
Consultancy Services
Item Rate
100 days
AGE(I) (P) SRINAGAR
As per tender documents
11 documents required · 11 mandatory
₹1,000
AGE(I) (P) SRINAGAR
₹2.0 L
Yes
28 Sept 2026
12 Aug 2026
3 Sept 2026
12 Aug 2026
1 Sept 2026
27 Aug 2026
12 Aug 2026 - 19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Provision of complete consultancy services ( as listed below in Item No 1.00 to 1.90) as per relevent IS code practice and standard Engineering Norms and practices complete all as specified and as directed.
A- Soil Investigation- Soil Investigation by doing bore holes having dia 100 to 150 mm upto 10 mtr below MGL for 34 Nos bore.
(aa) Preparation/Drilling of bore holes having dia 100 to 150 mm upto 10 mtr below MGL upto the hard strata. Rock or refusal whichever occurs earlier for building including boring, sampling, Para (a) to (e). Each bore hole depth should be minimum 10 mtr. Sampling shall be done as per relevant latest IS Codes (1982-2021) complete and as directed by Engr-in-Charge.
(a) Above test shall include carrying out of SPT and collecting disturbed & undisturbed saniples as per IS code and up to 1 mtr interval or at every change of strata.
(b) Carrying out laboratory tests with the disturbed / undisturbed sampling and find out grain size analysis, classification, consistency, density, Atterberg limits, FMC/OMC, analysis conducted as per relevant IS code. (c) Evaluate allowable bearing capacity / SBC of soil by analytical methods.
(d) Submission of 3 copies report of soil investigation report and other details including making of bore hole logs.
(e) In soil test report recommendation of SBC should give for all bore holes for minimum three depths for each bore hole.
(f) Recommendation of footing type minimum foundation size as under: 1.5x 1.5m, 1.5 x 2.5m, 2.0 x 2.5m, 2.0 x 3.0 m
(g) All testing shall be carried out as per relevant and latest IS code provision. (h) Photographic record of geo-exploration and testing shall also be a part of report.
(i) Location plan of bore holes and section showing stratification in summary form (highest & lowest) and seasonal variation of water table should be mentioned in the report.
(j) Recommendation with respect to liquefaction potential of soil in case of saturated or partially saturated soil.
(k) Recommendation with respect to swelling potential of soil (i.e. Liquid limit, Plastic limit, Plasticity index & swelling pressure in respect of BC soil & its depth/layers). (l) Calculation ofSBC value at proposed depth need to be part of soil investigation.
(m) Estimation of pile capacity for one open capacity of different size of pile with calculations need to be part of soil investigation report.(n) Transport charges for equipment and machinery at site. (o) The location of bore holes shall be as directed by Engg-in-carge.
B. All as per item No A above but depth upto 15 mtr and 18 Nos bores.
C. All as per item No A above but depth upto 20 mtr and 19 Nos bores.
D. Plate Load Test for 14 Nos bores and also determine the 'K 'value on all those locations. | 1 | Each Job | - | - |
| 1.1 | (a) Preparation, submission and finalization of Complete conceptual plans, Architectural Drawings (Site plans, Plans of all Buildings, all side elevations, Cut Sections, Various sections through Stairs, Critical sections, detailings showing internal fixtures, cupboards, kitchen details, toilet details, elevation feature details, Schedule of Finishes, Arch TD Drawings (in appropriate scales) in REVIT/AutoCad for Following Buildings, While preparing drawings the consultant shall adhere to scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws, BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. The above mentioned drawing shall be prepared in consultation/supervision of Architects of HQ CE 31 Zone (E-6 Section ) ,( E-2(Plg) Officers for Sch of Finishes ) and will have to approved by Accepting Officer before Finalization.
Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm
(iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm
Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm
(ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm
(iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm
(iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm
(v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm
(vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm
(vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm
(vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm
(ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm
(x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | - | - | - | - |
| 1.3 | (b) Preparation, submission and finalization of Complete structural design and drawings for following buildings based on the architectural drawings prepared and approved vide Item No 1 above, While preparing drawings the consultant shall adhere to design parameters given in Tender documents, scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws and BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings., All these documents can be obtained from the office of HQ CE 31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of Design section officers of HQ CE 31 Zone (E-2 Design Section ) and will have to approved by Accepting Officer before Finalization.SBC report shall be provided by E-2(Des) Sec to consultant.for preparation of Str drgs.
Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm
(iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm
Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm
(ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm
(iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm
(iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm
(v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm
(vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm
(vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm
(vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm
(ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm
(x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | - | - | - | - |
| 1.5 | (c) Preparation, submission and finalization of Complete Electrical & Mechanical services drawings, design calculations & detailed estimates with details showing internal electric supply, external electric supply, external water supply, Mechanical laundry, RO plant, passenger lifts, Goods lifts, solar power plant, CHS plant for space heating, firefighting system, Fire extinguishers, electric chimney for cook house, deep freezers, cassette type AC, Hot water Supply, solid waste management and fixing site for all E/M equipment. While preparing drawings the consultant shall adhere to Scale of Accomdation-2022, Zonal Specifications, IS Codes, NBC Codes, GRIHA rating system (For maximum star rating). ECBC Norms, CFEES (approval & recommendation), Local Bye laws, BPs and AE Part-II of the subject work. In case of any discrepancy between these documents the decision of accepting officer will be obtained before finalizing the drawings. All these documents can be obtained from the office of HQ Chief Engineer 31 Zone on any working Day. The above-mentioned drawings & estimates shall be prepared in consultation/supervision of E/M officers of HQ CE 31 Zone (E-4 section) and will have to approve by Accepting Officer before finalization.
Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm (iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm
Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm (ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm (iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm (iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm (v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm
(vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm
(vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm
(vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm
(ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm
(x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | - | - | - | - |
| 1.7 | (d) Preparation, submission and finalization of Detailed Estimates,Yardsticks and Market rate analysis (on prescribed format for the same used in MES) for following buildings and services based on drawings prepared and approved as per para 1 to 1.20 above. The estimates shall be based on rates given in SSR 2020 Part-II, , if rate of any Item is not availaible in SSR 2020 Part-II, the same should be applied based on Market rate of the Item reduced/enhanced to SSR 2020 Part-II, & by applying market variation percentage as per percentage over SSR for the relevent quarter circulated by HQ CE 31 Zone. All these documents can be obtained from the office of CE31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of Contract section officers of HQ CE 31 Zone (E-8 Section ) and will have to approved by Accepting Officer before Finalization.
'Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm (iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm
Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm
(ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm
(iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm
(iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm
(v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm
(vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm
(vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm
(vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm
(ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm
(x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | - | - | - | - |
| 1.8 | (e) Submission of drawings and services plans prepared as per Item No 1 to 1.20 above to GRIHA Council/Secretariat and obtaining approval of GRIHA Council for the drawings and services plans as per GRIHA-3 star rating norms and submitting the 06 copies of Griha approved drawings to the office of CE 31 Zone in A-3 Size tracing sheet.
(f) Laisioning and coordinating with GRIHA team for registration of the project by filling Expression of Interest form online on GRIHA Website and paying the required registration Fees to GRIHA Authorities, uploading relevent documents , responding to queries, observations, modifications and corrections given by GRIHA team with in specified time frame and reporting the same to HQ CE 31 Zone and obtaining Final registration certificate/ number including login id and password for the project from the GRIHA authorities, for following buildings.
Special works: (i) Single living accn for 19 Havs and 65 OR's (S+4) Total plinth Area -2276.04 Sqm and open stilt parking area 569.00 Sqm. (ii) Single living accn for 15 JCO's (G+2) including Stair case and baggage room Total plinth Area -644.16 Sqm (iii) Single living accn for 09 Major and for 02 Capt (G+2) including servant qtrs, box room, attached toilet area and goods lift size etc Total plinth Area -860.14+148.64+51.56 = 1060.34 Sqm
Auth works:(i) Single living accn for 23 Havs and 189 OR's (S+4) including store room, beggage room, sanitary block Total plinth Area -5468.00 Sqm and open stilt parking area 1530.00 Sqm
(ii) Cook house and Dinning hall (S+4) for 42 Havs and 290 OR's (Total 332 Ors) Kitchen, meat room, dry store, fresh store etc Total plinth Area -728.08+324.18=1052.26 Sqm
(iii) Single living accn for 06 JCO's (G+2) including baggage room Total plinth Area -278.10 Sqm
(iv) JCO's Mess for 25 JCO's including mess room, club room, toilet etc Total plinth Area -359.8 Sqm
(v) Single living accn for 01 Capt (S/S) including servant qtrs, baggage room etc Total plinth Area - 65.91+18.58= 84.49 Sqm
(vi) Officer's Mess for 23 str of Officers including mess room, bar room, libarary, kitchen, mess office, silver room, guest room, wine store, plate room etc Total plinth Area - 881.90 Sqm
(vii) Office and Administration Accn (S+2) including Offrr's Mess for 23 str of Officers including , libarary, guest room, Driver room, Sanitary annex Total plinth Area - 1916.00 Sqm
(vii) MT Office and LRW office including sanitary annex Total plinth Area - 80.67+38.50= 119.17 Sqm
(ix) Guard house and ancillaries, URC (G+1), OR's institute, and Educational building (G+2) Total plinth Area - 162.00+267.46+158.03+690.40=1277.89sqm. (x) Religious Institute,Gd rest room for 02 NCOs and 06 ORs and lift (08 x passengers) Total plinth Area - 75.00+493.00+144.19= 712.19 Sqm | - | - | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_878504.xls
BOQ • 0.34 MB
TenderConsultancyOAF2ndCall.pdf
Tender Documents • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .