Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
27 Jul 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
120 days
Expenditure
Capital (Works)
CIVIL
2 conditions · 2 needing a document upload
As Per Tender Document
As Per Tender Document
7 conditions · 2 needing a document upload
As Per Tender Document
As Per Tender Document
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Transferring and stacking of Bench Mark/Control Pillar on ground, Setting out finalized alignment, setting out and demarcation of ROW on Ground and Assistance to Land Acquisition activities for execution, implementation and maintenance of Part of East-West Dedicated Freight Corridor (EWDFC) from New Bhestan to Navapur as well as connectivity lines & station yards etc, with in jurisdictions CGM- Surat Unit.
ST-EN-EWDFC-BB-01R
ST-EN-EWDFC-BB-01R
Open
Works - General
24 Months
Vadodara, Gujarat
₹0
₹6.2 L
27 Jul 2026
5 Jul 2026
13 Jul 2026
69 items across 2 schedules · ₹3,71,52,020.32 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Survey and Transferring the Benchmark and Setting out the Control Pillars/BM /TBM as reference for alignment in straight as well as in curves for marking and pegging out the centre line with wooden pegs of size 5cm x 5cm x 30cm at pegs at Suitable locations /Obligatory Points such as Roads, Bridges and IP points of alignments to the satisfaction of the Engineer-in- charge with all contractor's labour, equipment, materials, tools, plant & conveyance wherever required and as directed by the Engineer-in- charge. Note: a)Name and GPS Co-ordinates of Control Point/TBM Locations/ obligatory point to be submitted. b)Rate also include Providing Centre Marking on the Pillars for Referencing Purpose c)Payment for TBM/control pillars shall be made in item NS/21 | Kilometre | 32.00 | 8,077 | 2,58,464 |
| 2 | Setting out the centreline of alignment in straight as well as in curves for marking and pegging out the centre line with wooden pegs of size 5cm x 5cm x 30cm at 20M intervals and with 10cm x 10cm x 40cm wooden pegs at every 100M intervals to the satisfaction of the Engineer-in- charge with all contractor's labour, equipment, materials, tools, plant & conveyance wherever required and as directed by the Engineer-in- charge. NOTE: a)Name and GPS Co-ordinates of pillars of Centreline of alignment stacked & fixed on ground including major locations such as ROB/Rubs, Major and minor bridges, surface/grade crossing, yards, curves etc and any other obligatory point shall be submitted. b)Rate also include Providing Centre Marking on the Pillars for Referencing Purpose c)Payment for TBM/control pillars shall be made in item NS/21 | Kilometre | 95.00 | 8,077 | 7,67,315 |
| 3 | Preparation and submission of land acquisition proposals duly collecting village/ Mouza maps from revenue authorities and marking the proposed alignment including land widths for land acquisition purpose including collection of copies of Records of Rights (ROR)/ Revenue records of land of individuals from the Revenue department of relevant districts / villages including plotting the details of length and width of land requirement and all other parameters as required for land acquisition, furnishing details in required formats and making booklet. N o t e : Rate of Item includes all expenses against contractor's manpower, system, software, equipment, instruments, devices, stationary, photocopy, printing, transportation, fuel, overhead charges etc. required for work to the satisfaction of CALA. | Kilometre | 63.00 | 2,092.89 | 1,31,852.07 |
| 4 | Geo referencing of mouza/ village maps and land plan shall be done using appropriate software & established Ground control points. Superimposition of DFCCIL proposed alignment shall also to be made on the approved land plan, showing DFCCIL proposed alignment, existing IR lines (if any), Toe lines, distance between adjacent IR track and DFCCIL track, Chainage. The item includes submission of KML/ KMZ file showing DFCCIL ROW and an excel sheet mentioning chainage, DGPS Co-Ordinates of ROW and center line, at 20 m interval in straight portion and at 10m interval at curved portion and at all offset points. Note: Item includes all expenses against contractor's manpower, system, software, equipment, instruments, devices, stationary, photocopy, printing transportation, fuel etc & overhead charges etc. required for completion of work to the satisfaction of Engineer-in-charge.(Note-Each Means Per Village) | Each | 63.00 | 14,448.19 | 9,10,235.97 |
| 5 | Calculation of land widths and preparation of land plans in original on tracing cloth/film of 70 microns required for the land to be acquired duly indicating chainages and widths along with alignment including station yards to a suitable scale as directed by the Engineer-in- charge. Note: Item includes all expenses against contractor's manpower, system, software, equipment, instruments, devices, stationary, photocopy, printing , transportation, fuel etc & overhead charges etc. required for completion of work to the satisfaction of Engineer-in-charge. | Kilometre | 95.00 | 872.81 | 82,916.95 |
| 6 | Assisting the Competent Authority, Land Acquisition (CALA) and DFCCIL in land acquisition process , including preparation of details from available land records for publishing notifications under Section 20A of the Railway Act 1989 with latest amendments, drafting notifications in the prescribed format in Hindi and English (two copies) for publication in the Gazette, and in Hindi, English, and one vernacular language (Gujarati/Marathi / Odiya as applicable) for publication in newspapers; ensuring affixing notices on notice boards of village offices, Panchayat offices, and Block offices, inviting objections under the relevant sections (U/s 20D of Railway Act 1989 with latest amendments) of the Land Acts, taking photographs as proof of affixing ; executing all tasks with the consultant's own manpower, stationery, photocopying, consumables, and transport arrangements, thereby completing the work in all respects. Note: Rate of Item includes all expenses against contractor's manpower, system, software, equipment, instruments, devices, stationary, photocopy, printing, transportation, fuel etc & overhead charges etc. required for completion of work to the satisfaction of CALA.(Each Means Each Village) A)For Initial 20A notification | Each | 63.00 | 2,409.51 | 1,51,799.13 |
| 7 | Assisting the Competent Authority, Land Acquisition (CALA) and DFCCIL in land acquisition process , including preparation of details from available land records for publishing notifications under Section 20A of the Railway Act 1989 with latest amendments, drafting notifications in the prescribed format in Hindi and English (two copies) for publication in the Gazette, and in Hindi, English, and one vernacular language (Gujarati/Marathi / Odiya as applicable) for publication in newspapers; ensuring affixing notices on notice boards of village offices, Panchayat offices, and Block offices, inviting objections under the relevant sections (U/s 20D of Railway Act 1989 with latest amendments) of the Land Acts, taking photographs as proof of affixing ; executing all tasks with the consultant's own manpower, stationery, photocopying, consumables, and transport arrangements, thereby completing the work in all respects. Note: Rate of Item includes all expenses against contractor's manpower, system, software, equipment, instruments, devices, stationary, photocopy, printing, transportation, fuel etc & overhead charges etc. required for completion of work to the satisfaction of CALA.(Each Means Each Village) b) 20A Re-notification if Required in any Village(s) | Each | 16.00 | 2,409.51 | 38,552.16 |
| 8 | Assisting DFCCIL by preparing village wise Proposal of Joint measurements and submitting the same to CALA. Collecting receipt of Joint Measurement Fee for each plot/Block/Survey number ( intended for acquisition under clause 20A) of each village. Facilitating CALA and DFCCIL for carrying out Joint Measurement Survey (JMS) of land with Revenue Staff & Project affected persons (PAPs), with consultant's Survey equipment, manpower, stationary/printing, consumables, transport arrangement etc. complete in all respect. Item includes demarcation of land boundary with wooden pegs/ lime powder, preparation and issue of notices to all concerned such as PAPs and/or Authorities of Horticulture Forest/ R&B/PWD/ Revenue departments, preparation of drawing, area calculation, correction/addition of Joint Measurement drawing of each plots/Survey no/block no with existing map /Tippan map of respective survey/block/plot no intended for acquisition Land. Preparation of JMS Reports in five sets, preparation of ROR abstract. Note: a)Rate of Item includes all expenses against contractor's manpower, Surveyor/engineer, system, software, equipment, i instruments, devices, stationary, photocopy, printing, transportation, fuel etc & overhead charges etc. required for completion of work to the satisfaction of CALA /DILR/SOLR b)Rate also include any review/addition/modification/ correction of the drawing made after Joint Measurement during its verification till approval by DILR/SOLR. (Each Means Each Village) a)For Initial 20A notification (JMS) | Each | 126.00 | 14,642.42 | 18,44,944.92 |
| 9 | Assisting DFCCIL by preparing village wise Proposal of Joint measurements and submitting the same to CALA. Collecting receipt of Joint Measurement Fee for each plot/Block/Survey number ( intended for acquisition under clause 20A) of each village. Facilitating CALA and DFCCIL for carrying out Joint Measurement Survey (JMS) of land with Revenue Staff & Project affected persons (PAPs), with consultant's Survey equipment, manpower, stationary/printing, consumables, transport arrangement etc. complete in all respect. Item includes demarcation of land boundary with wooden pegs/ lime powder, preparation and issue of notices to all concerned such as PAPs and/or Authorities of Horticulture Forest/ R&B/PWD/ Revenue departments, preparation of drawing, area calculation, correction/addition of Joint Measurement drawing of each plots/Survey no/block no with existing map /Tippan map of respective survey/block/plot no intended for acquisition Land. Preparation of JMS Reports in five sets, preparation of ROR abstract. Note: a)Rate of Item includes all expenses against contractor's manpower, Surveyor/engineer, system, software, equipment, i instruments, devices, stationary, photocopy, printing , transportation, fuel etc & overhead charges etc. required for completion of work to the satisfaction of CALA /DILR/SOLR b)Rate also include any review/addition/modification/ correction of the drawing made after Joint Measurement during its verification till approval by DILR/SOLR. (Each Means Each Village) (b) 20A Re- notification if Required in any Village(s) (JMS) | Each | 32.00 | 14,642.42 | 4,68,557.44 |
| 10 | Supplying & fixing CC (M20) pillars for demarcation of at locations with 150 x 150 x 600mm size pillars painted with 300 mm above the ground level with yellow synthetic enamel paint and the posts embedded under ground in 300mm x 300mm x 200mm hole/pit with plain cement concrete (M15) in proper location as directed by Engineer-in-charge. Rate includes contractor's all materials, surveyor, manpower, transportation, fuel, lead and lifts, loading, unloading, shuttering, casting, curing, de-shuttering, testing, excavation, painting, marking, consumables, tools, plants, equipment, instruments, devices, stationary, photocopy, printing and any other overheads etc., complete as per specifications and to the satisfaction of Engineer -in charge. (Note-Each Means induvidual Number) | Each | 60.00 | 660.43 | 39,625.8 |
| 11 | Photography /Videography, numbering of trees within the Railway boundary and beyond Railway boundary up to proposed DFCCIL ROW as per joint measurement Survey sheet by making notch of size 100x100mm or fixing number plate of suitable size, painting white paint on it and numbering the trees with red enamel paint. Photographs and video shooting of the trees of each plot numbers of the village coming under acquisition in private land and Railway land should be done separately. Preparation of document/ proposals for evaluation of trees as per proforma approved by the Engineer in charge/ Concerned Authority as per Type of tree, and submission of same in soft & hard copy (03 set). N o t e : a)Rate of the item includes contractor's material, labours, transportation, tools & plants, software, instruments, devices, stationary, photocopy, printing , consumables transportation fuel etc any other overhead for completion of work to the satisfaction of Authority. b)For private land, number of trees should be identified as per plot no./PAP wise and within existing railway land, the number of trees should be identified as per Railway Km/OHE mast number. (Note -Each means per tree | Each | 7800.00 | 83.42 | 6,50,676 |
| 12 | Facilitating CALA for preparation of notification under Section 20E of the Railway Act 1989 with latest amendments, drafting notifications in the prescribed format in Hindi and English (two copies) for publication in the Gazette, and in Hindi, English, and vernacular language (Bengali) for publication in newspapers and collection of documents required (such as 20D reports, ROR abstract etc.) complete with consultant's own man power, stationary/photocopy , instruments, devices, stationary, photocopy, printing , soft wares consumables, transportation, fuel and other over heads etc. for all villages separately, district wise for verification by CALA and DFCCIL, and making necessary correction if required. (Note-Each means Each Village) b)20E Re-notification if Required in any Village(s) | Each | 16.00 | 36,364.86 | 5,81,837.76 |
| 13 | Facilitating CALA for preparation of notification under Section 20E of the Railway Act 1989 with latest amendments, drafting notifications in the prescribed format in Hindi and English (two copies) for publication in the Gazette, and in Hindi, English, and vernacular language (Bengali) for publication in newspapers and collection of documents required (such as 20D reports, ROR abstract etc.) complete with consultant's own man power, stationary/photocopy , instruments, devices, stationary, photocopy, printing , soft wares consumables, transportation, fuel and other over heads etc. for all villages separately, district wise for verification by CALA and DFCCIL, and making necessary correction if required. (Note-Each means Each Village) a) For Initial 20E notification. | Each | 63.00 | 36,364.86 | 22,90,986.18 |
| 14 | Identification of Structures, Borewell, Pipelines, Drainages etc of each plot numbers of the village coming under acquisition in private land within DFCCIL ROW as per joint measurement Survey sheet. Preparation of document/ proposals including cost estimates, plans, section, photographs etc for evaluation of Structures, Borewell, Pipelines, Drainages etc as per proforma approved by the Engineer in charge/ Concerned Authority in soft & hard copy (03 set). Facilitating Public Works Department/ other Govt. department for survey and valuation of affected structures and any other value addition to land. complete in all respect, with consultant's own manpower, surveyor, Engineer, instruments, devices, stationary, photocopy, printing , consumables, including transport Fuel & Over heads etc. complete in all respect Note: Payment for Photography shall be made in separate item i.e., item no NS/24 Note-Each means Each Village) | Each | 63.00 | 6,765.16 | 4,26,205.08 |
| 15 | Facilitating Forest department for valuation of affected trees etc. complete in all respect, with consultant's own surveyor, manpower, equipment instruments, devices, stationary, photocopy, printing, consumables, transportation fuel & other over heads etc. complete in all respect. Note-Each means Each Village) | Each | 63.00 | 2,224.17 | 1,40,122.71 |
| 16 | Facilitating Horticulture department for valuation of affected trees etc. complete in all respect, with consultant's own surveyor, manpower, instruments, equipment stationary / printing /consumables, transportation fuel & other over heads etc. complete in all respect. Note-Each means Each Village) | Each | 63.00 | 2,224.17 | 1,40,122.71 |
| 17 | Publicity of 20E notification to all the PAPs by distribution of notice, affixing the notice on the notice board of every village office, Panchayat/block office for information and seeking Claims under 20F, taking photographs as proof of fixing etc., complete with consultant's own manpower, instruments, devices, stationary, photocopy, printing , consumables, transport , fuel and other over heads etc., Note-Each means Each Village) | Each | 63.00 | 2,409.51 | 1,51,799.13 |
| 18 | Facilitating Competent Authority for collecting all documents required for preparation of award under section 20F of Railway Act 1989 with latest amendment as stipulated in section 20G of Railway Act 1989 and relevant clause of RFCTLARR 2013. Preparation of village wise/ Block/Survey/ Plot number wise award including correction in ROR, with consultant's own, manpower, equipment, instruments, devices, stationary, photocopy, printing, consumables, transportation, fuel and any other over heads etc. complete in all respect. Note-Each means Each Village). a) For Declaration of Award (20F) for land acquisition under initial 20A & 20E notification. | Each | 63.00 | 9,767.79 | 6,15,370.77 |
| 19 | Facilitating Competent Authority for collecting all documents required for preparation of award under section 20F of Railway Act 1989 with latest amendment as stipulated in section 20G of Railway Act 1989 and relevant clause of RFCTLARR 2013. Preparation of village wise/ Block/Survey/ Plot number wise award including correction in ROR, with consultant's own, manpower, equipment, instruments, devices, stationary, photocopy, printing, consumables, transportation, fuel and any other over heads etc. complete in all respect. Note-Each means Each Village). b)For Declaration of Award (20F) for land acquisition under Re-notified 20A & 20E notification | Each | 16.00 | 9,767.79 | 1,56,284.64 |
| 20 | Distribution of PAP wise award declared by CALA, under clause 20F of Railway Act -1989 (latest amendment) with Notice to all PAPs with acknowledgement. Note-Each means Each Village) A) Distribution of Award Notice | Each | 63.00 | 2,409.51 | 1,51,799.13 |
| 21 | Distribution of PAP wise award declared by CALA, under clause 20F of Railway Act -1989 (latest amendment) with Notice to all PAPs with acknowledgement. Note-Each means Each Village) b) Re- Distribution of Award Notice, if Required in any Village(s) | Each | 16.00 | 2,409.51 | 38,552.16 |
| 22 | Facilitating Competent Authority for preparation of order for transferring the land to DFCCIL with all documents required such as Site Survey sheet, Vivaran- Patra, possession receipt, etc. with consultant's own instruments, devices, stationary, photocopy, printing, equipment, manpower, consumables, transportation, fuel & other overheads etc. complete. Note-Each means Each Village) A) Preparation of Order Transfer of land to DFCCIL | Each | 63.00 | 481.9 | 30,359.7 |
| 23 | Facilitating Competent Authority for preparation of order for transferring the land to DFCCIL with all documents required such as Site Survey sheet, Vivaran- Patra, possession receipt, etc. with consultant's own instruments, devices, stationary, photocopy, printing, equipment, manpower, consumables, transportation, fuel & other overheads etc. complete. Note-Each means Each Village) b) Preparation of Compulsory Possession request letter/Proposal, if Required in any Village(s) | Each | 16.00 | 481.9 | 7,710.4 |
| 24 | Facilitating CALA/DFCCIL for taking physical possession of land by verifying the acquisition area as per possession receipt with the PAPs, with consultant's own machinery, manpower, consumables, instruments, devices, stationary, photocopy, printing, transportation etc. complete in all respect. (Note: - The unit Number means each Survey Number/Block Number/Plot Number declared in award) A) Taking physical possession of land. | Numbers | 1390.00 | 834.07 | 11,59,357.3 |
| 25 | Facilitating CALA/DFCCIL for taking physical possession of land by verifying the acquisition area as per possession receipt with the PAPs, with consultant's own machinery, manpower, consumables, instruments, devices, stationary, photocopy, printing, transportation etc. complete in all respect. (Note: - The unit Number means each Survey Number/Block Number/Plot Number declared in award) B) Taking Compulsory possession of land. If Required in any Village(s) Note: If in any village compulsory possession is required in part of village in such case prorate payment i.e., Total survey/Block no having Compulsory Possession in any Village/ Total Survey/Block no in that Village. | Numbers | 348.00 | 834.07 | 2,90,256.36 |
| 26 | Facilitating BL & LRO/DILR/SOLR and/or Tahsildar/ mamlatdar for transferring land title in the name of Ministry of Railway, chasing the matter with consultant's own machinery, manpower, consumables, instruments, devices, stationary, photocopy, printing , transportation etc. complete. (Note: - The unit Number means Survey No/Block No) b)Transfer of Land title, if Required in any Village(s) -For Compulsory Possession/ Missing land | Numbers | 348.00 | 250.22 | 87,076.56 |
| 27 | Facilitating BL & LRO/DILR/SOLR and/or Tahsildar/ mamlatdar for transferring land title in the name of Ministry of Railway, chasing the matter with consultant's own machinery, manpower, consumables, instruments, devices, stationary, photocopy, printing , transportation etc. complete. (Note: - The unit Number means Survey No/Block No) A) Transfer of Land title. | Numbers | 1390.00 | 250.22 | 3,47,805.8 |
| 28 | Preparation of Panchama regarding Acquired land parcel as asked by CALA and/or disruption of any activity associated with land acquisition due to mass opposition in a village or stretch with Revenue Staff & PAPs, with all equipment, manpower, instruments, devices, stationary, photocopy, printing , etc. transport arrangement etc. complete in all respect . a)Preparation of Panchnama as Asked by CALA | Kilometre | 95.00 | 2,724.6 | 2,58,837 |
| 29 | Preparation of Panchama regarding Acquired land parcel as asked by CALA and/or disruption of any activity associated with land acquisition due to mass opposition in a village or stretch with Revenue Staff & PAPs, with all equipment, manpower, instruments, devices, stationary, photocopy, printing , etc. transport arrangement etc. complete in all respect . b)Preparation of Panchnama, if Required in any Village(s) Due to disruption in Land acquisition Proceedings | Kilometre | 24.00 | 2,724.6 | 65,390.4 |
| 30 | Providing hoisting & fixing in position M 20 grade RCC boundary posts/Centre Line Pillars of size 150mmx150mmx1225mm (for demarcation of DFC ROW). Name of railway shall be written in red on white background at site as directed by Engineer-in-charge. Rate include 4 nos. reinforcement bars of 6mm dia with 6mm dia shear reinforcement at 50mm c/c or as instructed by Engineer-in charge. Boundary posts shall be embedded underground in 450mm x 450mm x 450mm hole with plain cement concrete (M10) in proper location as directed by Engineer-in- charge. N o t e : a)Rate includes the cost of Materials, manpower, Engineer/surveyor, excavation, Cutting & Binding Reinforcement, Shuttering, Centring, Concreting, De- shuttering, Curing, Testing, PCC, , tools and plants, transportation, fuel, loading, unloading, lead & lift, Consumables & Over heads to complete work in all respect. b)Rate also includes painting, marking, cantering (with respect to Co-ordinates) Note -Each means individual number | Each | 3982.00 | 1,390.7 | 55,37,767.4 |
| 31 | Survey, Identification, Demarcation (on site/plan) and listing out Utility/services along/crossing the proposed alignment with in proposed ROW.The utilities/services shall include all Over Head/ Under Ground utilities/services.The Utility/services such as electrical line/poles, telephone line, high tension lines along with their voltage & sag height, OFC cables, existing RE cables, Quad cables, Gas Pipe lines, Water Supply / Sewerage pipe lines, Roads, Track etc, locations requiring Diversion of Road, Nala, stream etc.Based on Survey and details of collected for respective utilities the Contractor shall prepare the individual proposal for each utility/services (falling in the proposed ROW and/or Crossing the proposed alignment) along with Utility/Service Protection /Diversion Plan for seeking NOC/Protection/Diversion of the said utility, from utility owner/authority. The Proposal shall contain the Protection/Diversion plan and section, chainage, between stations, location (village name, Block/Survey Number), chainage, Utility/Service type, physical & technical details, details of utility owner (such as name contact & address etc) Note: a)The rate of this item includes cost of material, Surveyor/ Engineer man power, software, accessories, device, all tools, plant, equipment, instruments, devices, stationary, photocopy, printing, transportation, fuel, consumables and any other Overheads etc. required to complete the work in all request. b)The Rate also includes preparation, printing, submission, addition/alteration/Correction/ modification till final approval in required number of copies, hard as well soft (in. pdf formats with storage device. Note Rates consider as per NS -11 Note-Each means Each Village) | Each | 63.00 | 6,765.16 | 4,26,205.08 |
| 32 | Submission of report of soil investigation (in format as per Association of Geo Technical & Geo-Environ Mental specialists) for deep foundations of Important Bridges and Major Bridges under the East-West Dedicated Freight Corridor Project. Relevant items of soil testing will be conducted in Important and Major bridges proposed locations. Relevant items of Explanatory Boring & soil testing will be conducted and paid under Schedule B. The Geotechnical Report shall include: a)Site Plan: Showing position of boreholes, trial pits, and staging arrangements in water, if required. b)Borehole Data: Detailed longitudinal section of each borehole showing classification of soil strata and values of important parameters (C, C', Ø, , N-value, etc.). c)Laboratory & Field Test Results: Comprehensive results of all relevant tests (index properties, shear strength, consolidation, permeability, chemical analysis, triaxial, plate load, etc.) presented in proper tabular form as per IRC- 78-1983 Sh-2, Railway Sub-Structure Code, and latest BIS/IRC/IRS standards. d) Bearing Capacity & Settlement Analysis: Calculation of bearing capacity of soil and settlement analysis for well foundations, pile foundations, and open foundations under specific design loads. e)Groundwater Table: Determination of groundwater level. f)Rock Investigation (if encountered): Classification and characteristics of rock, RQD values, safe bearing capacity, foundation level, and nature of cleavage planes. g)Recommendations: Type of foundation recommended (open, pile, or well) with detailed calculations for bearing capacity, settlement, and embedment in incompressible layer/rock as per latest BIS/IRC/IRS recommendations. h)Staging in Water: Provision for staging, platforms, and necessary arrangements for conducting boreholes and sampling in riverbeds or waterlogged areas, wherever required. i)Final Report Submission: Draft report submission followed by final report incorporating all details, drawings, calculations, and recommendations. j)Mode of Payment: i)50% of the accepted rate will be paid on submission of draft copies. ii)50% of the accepted rate will be paid on submission and acceptance of final copies. | Numbers | 46.00 | 24,861.64 | 11,43,635.44 |
| 33 | Taking photographs of structureswith name board of each ProjectAffected Person/Peoples(PAPs)and submission of hardcopy with all details of PAP suchas name, survey no. structuredetails etc. with consultant'sown machinery, man power,consumables, transportation etc.complete. This should besubmitted village wise in 2copiesone with ring binding and otherloose. Note: Here unit Eachmeans Per structure. | Each | 60.00 | 147.86 | 8,871.6 |
| 34 | "Collection of PAP wise Details & affidavits in modes and formats as instructed by CALA required for Disbursement of award of Award to each PAP. Scrutiny & Verification of Documents and Facilitating CALA regarding Disbursement of Award to PAP by preparing Payment sheet , Possession Receipt etc, and arranging the Photography with Borad displaying details and Disbursement amount of each PAP during Disbursement of Awrad. Compilation of Details/documents along with Photographs of Disbursement proceeding. N o t e : Rate includes cost of consultants' manpower, equipment, instruments, devices, stationary, photocopy, printing, consumables, transport, fuel and other over heads etc., complete in all respect. Note-Each means Each Village)" A) Disbursement of Award Declared for Land acquired under Initial 20E Notification | Each | 63.00 | 2,409.51 | 1,51,799.13 |
| 35 | Collection of PAP wise Details & affidavits in modes and formats as instructed by CALA required for Disbursement of award of Award to each PAP. Scrutiny & Verification of Documents and Facilitating CALA regarding Disbursement of Award to PAP by preparing Payment sheet , Possession Receipt etc, and arranging the Photography with Borad displaying details and Disbursement amount of each PAP during Disbursement of Awrad. Compilation of Details/documents along with Photographs of Disbursement proceeding. N o t e : Rate includes cost of consultants' manpower, equipment, instruments, devices, stationary, photocopy, printing, consumables, transport, fuel and other over heads etc., complete in all respect. Note-Each means Each Village) b)Disbursement of Award Declared for Land acquired under Re- notification of 20E if Required in any Village | Each | 16.00 | 2,409.51 | 38,552.16 |
| 36 | Any USSOR 2021 items required for completion of work | Lumpsum | 1.00 | 4,80,000 | 4,80,000 |
| Schedule total | ₹2,00,71,644.04 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender Document
ATTACHMENT
TenderDocumentBuildingBlockworks-GujaratFinal.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .