Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹4.0 L+₹19,151 (5.01%)Rejected-AOC | L2 | Rejected-AOC Second lowest |
Tender Value
Refer Docs
EMD Value
₹9,080
Closing Date
16 Oct 2024, 3:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive, Electrical wing irrigation Sub division Aluva
G E N E R A L A M C 2 0 2 4 2 5 F u l l y Comprehensive Annual Maintenance of Pazhoor, Nechoor, and Mulakkulam Vadakkekara LIS Under Electrical Lift Irrigation Section Ramamangalam General Electrical Work
2024_Irrig_694209_20
PWD/BLDG/RLM/6773/2024-2025
Open Tender
Electrical Works
Item Wise
365 days
Ramamangalam
Please refer Tender documents.
11 documents required · 11 mandatory
₹805
₹9,080
9 Jan 2025
8 Oct 2024
18 Oct 2024
8 Oct 2024
16 Oct 2024
8 Oct 2024
Amount
Motor Overhauling Works
OD244616/2023-2024:Dismantling the 25 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD244617/2023-2024:Dismantling the 30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD244877/2023-2024:Dismantling the 35 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD244563/2023-2024:Dismantling the 40 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD244564/2023-2024:Dismantling the 90 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
Motor Lowering Works
OD244554/2023-2024: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load.
OD244926/2023-2024:Lowering down and erecting 25 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD244934/2023-2024:Lowering down and erecting 30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD244555/2023-2024: Lowering down and erecting 35 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load.
OD244925/2023-2024: Lowering down and erecting the 40 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load.
OD244944/2023-2024:Refitting 90 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Consumables and Supplies
OD244572/2023-2024:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD244575/2023-2024: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD244576/2023-2024:Supply and Installing 20 W LED Tube light.
OD244577/2023-2024:Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or equivalent make.
OD244578/2023-2024:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD244579/2023-2024:Supply and Installation of DOL starter for 5 HP 3 phase 400V 50Hz squirrel cage induction motor including giving connections( L&T /Equivalent made)
OD244580/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6316 , SKF / FAG or equivalent, suitable for 90/100 HP motor / pump set as per the direction of Departmental staff at site.
OD244581/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6314 , SKF / FAG or equivalent, suitable for 60 HP motor / pump set as per the direction of Departmental staff at site.
OD244582/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6309 , SKF / FAG or equivalent, suitable for pump (25-90 HP) as per the direction of Departmental staff at site.
OD244583/2023-2024:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 140 or equivalent suitable for 90/100 HP motor's fully automatic star delta starter
OD244584/2023-2024:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 70 or equivalent suitable for 40 HP motor's fully automatic star delta starter
OD245448/2023-2024:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 1 NO/INC, L&T MNX 40 or equivalent suitable for 25 HP motor's fully automatic star delta starter
2.2.16:Providing and fixing following rating and breaking capacity and pole MCCB in existing cubicle panel board including drilling holes in cubicle panel, making connections, etc. as required.250 Amp, 36 KA
OD122913/2024-2025:Providing and fixing following rating Operating Handle , ABB made for existing SDF in the panel board with separate connecting rode, 125 Amps (OESA125 G1)
OD122916/2024-2025:Supply and clamping the 25 x 3mm GI strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
90.14.24.22:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.7.5 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
OD122926/2024-2025: Dismantling the 30 HP motor pump set from the base plate, after dismantling the suction & delivery pipes, and removing the old broken foundation bolts from position after demolishing the surrounding layer of the concrete foundation up to 30 cm , providing new foundation bolt / extend from original bolt, and strengthening the base plate, filling the basement with concrete,(excluding concrete) and refitting the motor pump set in correct alignment and fitting suction & delivery pipes and taking trial run at full load
OD122929/2024-2025:Supply & fixing Flush head Push Button Actuator - Red with legend 'OFF', (Contact - 1NC)
OD125750/2024-2025:Revamping of LT switch boards described as following, measured per square meter area of the front face of panel : 1.External cleaning, minor repairs etc. ,and sheet metal works as required. 2.Panel Board repairs & Repair of hinges, minor sheet metal work etc. 3.Replacing rubber beading as required. 4.Panel board interior cleaning including repair of loose termination, bus bars, mountings etc. 5.Renewal of perished fasteners, terminals etc. 6.Trouble shooting the control the wiring including rectifications 7.Renewal of Terminal sockets as required 8.Insulation checks and correction of earthing 9.Filling of un necessary holes in the panel board using suitable sheet metal work. 10. Sealing the cable entry point using expandable PU Foam insulation sealant spray to safeguard from rats. 10. Lettering and identification marking.
OD125751/2024-2025:Charges for scraping , cleaning , painting the existing rusted panel board and dismantling the burnt out wire connection of switches, meters ,cleaning the terminals , attending all minor repairs, painting two coats of enamel paint over a coat of red oxide primmer and making the panel board ( including the naming of separate switches marking ) in good working condition( measured per square meter area of the fron face of the panel)
Motor AMC
OD244566/2023-2024:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed.(Total 3 Motors, 12 months for Each Motor).
OD244957/2023-2024: Fully Comprehensive Annual Maintenance of 25 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . "
OD244567/2023-2024: Fully Comprehensive Annual Maintenance of 40 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD244568/2023-2024: Fully Comprehensive Annual Maintenance of 90 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD244958/2023-2024: Fully Comprehensive Annual Maintenance of 30 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD244956/2023-2024: Fully Comprehensive Annual Maintenance of 35 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD244570/2023-2024: Fully Comprehensive Annual Maintenance of 40 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD244571/2023-2024: Fully Comprehensive Annual Maintenance of 90 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Motor Lifting Works
OD244559/2023-2024: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD245335/2023-2024: Lifting the 25 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. "
OD245333/2023-2024: Lifting the 30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. "
OD244560/2023-2024: Lifting the 35 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD245334/2023-2024: Lifting the 40 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
POWER ELECTRICALS
Bidder Name
POWER ELECTRICALS
KAMALA ELECTRICALS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1083341.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .