| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC HIMACHAL PRADESH HP | SHIMLA | HIMACHAL PRADESH | 171001 | ₹1.2 Cr | 1 | Accepted-AOC work awarded due to lowest bidder |
| 2 | 2₹1.2 CrRejected-Finance NOT AVAILABLE | ₹1.2 Cr | 2 | Rejected-Finance high rates |
| 3 | 3₹1.4 CrRejected-Finance VILL NANGABAG P O BANDROL TEHSIL DISTRICT KULLU H P | SHIMLA | HIMACHAL PRADESH | 172001 | ₹1.4 Cr | 3 | Rejected-Finance High rates |
| 4 | 4₹1.9 CrRejected-Finance | ₹1.9 Cr | 4 | Rejected-Finance High rates |
| 5 | 5₹2.2 CrRejected-Finance NOT AVAILABLE | NEW DELHI | DELHI | 110001 | ₹2.2 Cr | 5 | Rejected-Finance High rates |
| Sl No | Description | Qty | Unit | SANDEEP KUMAR SHARMA L1 | YOG RAJ SHARMA L3 | Rishi Rajan L2 | SULTAN KATOCH L5 | Avinash L7 | Rakesh Sen L6 | Vineet Sharma L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (hydraulic excavator)/ manual means including disposal of excavated earth all leads and lifts, disposed earth to be levelled and neatly dressed. Exacavated earth be filled in back side of Gabion wall with in all leads and lifts of required as directed by Engineer-in-charge. | 1,800 | Cum | 90 ₹1.6 L | 180 ₹3.2 L | 132 ₹2.4 L | 160 ₹2.9 L | 185 ₹3.3 L | 170 ₹3.1 L | 175 ₹3.1 L |
| 2.00 | Providing rubble stone properly hand packed behind retaining walls under floors in all leads and lifts as directed by Engineer-in-charge. | 184.43 | Cum | 1,150 ₹2.1 L | 700 ₹1.3 L | 3,200 ₹5.9 L | 2,600 ₹4.8 L | 3,520 ₹6.5 L | 3,450 ₹6.4 L | 2,900 ₹5.3 L |
| 3.00Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens & ballies, for all height of propping and centring and removal of the same for in situ reinforced concrete and plain concrete work with in all leads and lifts. The plates shall be sand papered and properly greased with oil before it placement for form work. The work shall be done to the entire satisfaction & direction of the Engineer-in-charge in: - | ||||||||||
| 3.01 | Vertical surfaces such as wall(any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like - | 1,975.77 | Sqm | 210 ₹4.1 L | 400 ₹7.9 L | 408 ₹8.1 L | 520 ₹10.3 L | 604 ₹11.9 L | 550 ₹10.9 L | 450 ₹8.9 L |
| 4.00 | Providing and laying cement concrete 1:4:8 ( One cement: Four sand: Eight graded stone aggregate forty millimeter nominal size )and curing complete excluding the cost of form in foundation and plinth within all leads and lifts | 17.92 | Cum | 5,400 ₹96,768 | 5,000 ₹89,600 | 9,100 ₹1.6 L | 8,500 ₹1.5 L | 9,875 ₹1.8 L | 9,800 ₹1.8 L | 7,500 ₹1.3 L |
| 5.00Providing & laying cement concrete 1:1.5:3(One cement :One & half sand: Three graded stone agregate of 20mm nominal size) including bailing out, pumping of water or diversion of river flow and curing complete excluding cost of from work and reinforcement for reinforced concrete work complete in all respect as per direction and to the entire satisfaction of the Engineer-in-Charge. in | ||||||||||
| 5.01 | Walls of any thikness but not less than0.10 Mtrs thickness including attached pilasters, buttresses plinth and string courses etc, from top of foundation (level) upto floor of any level including all leads and lifts etc. complete in all respect as per direction and to the entire satisfaction of the Engineer-in-Charge. | 1,392.68 | Cum | 6,150 ₹85.6 L | 7,500 ₹1.0 Cr | 5,500 ₹76.6 L | 12,000 ₹1.7 Cr | 12,560 ₹1.7 Cr | 12,400 ₹1.7 Cr | 9,950 ₹1.4 Cr |
| 6.00 | Providing and laying tor steel reinforcement for RCC work including bending, binding and placing in position complete including cost of binding wires with in all leads and lifts as per the entire satisfaction of the Engineer-in-Charge. | 27,855.63 | Kg | 83 ₹23.1 L | 90 ₹25.1 L | 85 ₹23.7 L | 104 ₹29.0 L | 109 ₹30.4 L | 105 ₹29.2 L | 105 ₹29.2 L |
| 7.00 | Providing and fixing 100mm dia PVC pipe arrangement in weep hole including PVC mesh in all leads and lifts as per the direction of Engineer in charge. | 270 | Rmt. | 280 ₹75,600 | 200 ₹54,000 | 280 ₹75,600 | 380 ₹1.0 L | 430 ₹1.2 L | 400 ₹1.1 L | 100 ₹27,000 |
Updated dates
Tender Value
₹2.2 Cr
EMD Value
₹2.5 L
Closing Date
23 Feb 2026, 11:00 amClosed
EE JSD KATRAIN
JSD KATRAIN
SH CO CC Protection wall with skin reinforcement at various RDs at 15 mile Baragran Bihal
2026_HPIPH_128177_1
8967-9017 dated 10.02.2026
Open Tender
Civil Works
KATRAIN
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹2.5 L
11 Mar 2026
10 Feb 2026
23 Feb 2026
10 Feb 2026
23 Feb 2026
10 Feb 2026
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid