Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.1 LAccepted-AOC | ₹67.1 L | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹70.1 LRejected-AOC | ₹70.1 L | L2 | Rejected-AOC Agreement executed |
| 3 | L3₹72.8 LRejected-AOC | ₹72.8 L | L3 | Rejected-AOC Agreement executed |
| 4 | L4₹76.0 LRejected-AOC | ₹76.0 L | L4 | Rejected-AOC Agreement executed |
| Sl No | Description | Qty | Unit | Sreekumar C K L2 | K M ALEXANDER L1 | HM CONSTRUCTION COMPANY L3 | SHAN. B L4 |
|---|---|---|---|---|---|---|---|
| 1.00Demolishing Building | |||||||
| 1.00 | 15.12.2:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area beyond 3 sq. metres | 12 | each | 448.1 ₹5,377.20 | 428.88 ₹5,146.56 | 465.27 ₹5,583.24 | 500 ₹6,000 |
| 1.00 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 0.64 | cum | 3,971.9 ₹2,522.16 | 3,801.48 ₹2,413.94 | 4,124.03 ₹2,618.76 | 4,500 ₹2,857.50 |
| 1.00 | 15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | 570 | metre | 15.8 ₹9,006 | 15.2 ₹8,664 | 16.49 ₹9,399.30 | 15 ₹8,550 |
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 197.6 | sqm | 187.1 ₹36,970.96 | 179.14 ₹35,398.06 | 194.34 ₹38,401.58 | 200 ₹39,520 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 46.2 | cum | 1,835.9 ₹84,818.58 | 1,757.12 ₹81,178.94 | 1,906.21 ₹88,066.90 | 2,100 ₹97,020 |
| 1.01 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 12.86 | cum | 2,191 ₹28,176.26 | 2,097.15 ₹26,969.35 | 2,275.09 ₹29,257.66 | 2,500 ₹32,150 |
| 2.00Building | |||||||
| 2.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 103.8 | cum | 310 ₹32,178.93 | 296.77 ₹30,805.62 | 321.95 ₹33,419.38 | 295 ₹30,621.89 |
| 2.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 24.98 | cum | 112.9 ₹2,819.68 | 108.09 ₹2,699.55 | 117.26 ₹2,928.57 | 100 ₹2,497.50 |
Tender Value
₹81.4 L
EMD Value
₹50,000
Closing Date
6 Nov 2025, 5:00 pmClosed
Executive Engineer
Executive Engineer PWD Buildings Division Palakkad
GENERAL-Annual plan 2023-24-Construction of School building for Government Victoria L.P. School Chittur,Palakkad-General Civil Work
2025_PWD_816824_1
PWD/BLDG/TR/19504/2025_5_2_1/1
Open Tender
Civil Works - Buildings
450 days
CHITTUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
3 Feb 2026
29 Oct 2025
11 Nov 2025
29 Oct 2025
6 Nov 2025
29 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1368256.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.01 MB
BOQ_1368256.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid