Loading…
Loading…
Tender Value
₹12.4 L
EMD Value
₹24,900
Closing Date
24 Sept 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of RCC Drain Ram Das to Pond in Village- Milak, YEA .WC-06
2026_YEIDA_1185998_3
YEA/GM(PROJECT)/2026/580 DT-11/09/2026
Open Tender
Civil Works
Fixed-rate
60 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹840
₹24,900
Yes
15 Sept 2026
15 Sept 2026
25 Sept 2026
15 Sept 2026
24 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete (Where Machine not reached/Move) 0-1.50 M.B.G.L. | 111.6 | Cum | 72.8 | ₹8,124.48 |
| 2 | Providing & Laying in position machine batched and machine mixed design mix M-25 gradement concrete for reinforced cement concrete work using cement content as per approved design mix including pumping of concrete to site od laying but excluding the cost of centering shuttering, finishing and reinforcement, including admixtures in recommended proportions as per I:S 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of engineer-in-charge (Note:- Cement content considered in this item is @ 330 kg/cum, Excess/less cement used as oer design mix is payable/recoverable seperately). All works upto plinth DAR-18/5.33.1 | 61.38 | Sqm | 7,849.65 | ₹4,81,811.52 |
| 3 | Reinforcement for RCC work including straghtening cutting bending placing in position and binding all complete up to plinth | 7,227.5 | KG | 77.07 | ₹5,57,023.42 |
| 4 | CENTRING & SHUTTRING INCLUDING STRUTTING PROPPING ETC & REMOVAL OF FORM FOR; FOUNDATION , FOOTING BASES OF COLUMS ETC FOR MASS CONCRETE | 90.3 | Sqm | 181.65 | ₹16,403 |
| 5 | wall ( any thickness) including attached pilasters, butteresses,plinth and string couses etc | 442 | sqm | 335.55 | ₹1,48,313.1 |
| 6 | Centring and shuttring including strutting,propping etc. and removal of form for edges of slabs and breaks in floors and walls. DAR-18/5.9.16.2 | 13.2 | sqm | 386.35 | ₹5,099.82 |
| 7 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.DAR-18/10.25.2 | 246.62 | kg | 94.42 | ₹23,285.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_2232124.xls
BOQ • 0.25 MB
3.pdf
Tender Documents • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .