Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹6.7 CrAccepted-Finance | ₹6.7 Cr | H1 | Accepted-Finance H1 Bidder as per Combined Technical And Financial Score i.e 99.93 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not Eligible |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Eligible |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Eligible |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Eligible |
| Sl No | Description | Qty | Unit | LEA Associates South Asia Pvt. Ltd. L1 |
|---|---|---|---|---|
| 0.00Cost of Consultancy Services for preparation of Project Report regarding Bridge Management, Inventory, Inspection (by MBIU) and Maintenance for Bridges, Flyovers, ROB (as per IRC:SP:35 & IRC:SP:40) in three different zones in state of West Bengal under Public Works Directorate & Public Works (Roads) Directorate.” Package 2 (PWRD-West Zone & PWD- West Zone) | ||||
| 1.00 | Part A | 47 | Each | 7,25,000 ₹3,40,75,000 Lowest |
| 1.01[Note: Part A comprises Cost of Key Personnel, Cost of Sub Professional Staffs or Support Staffs, Rental Charges for Office, Office Furniture, Inspection Vehicle for Staff and Authority Personnel, MBIU Vehicle charges etc., Underwater inspection Charges, Report and printing charges, transportation and accommodation charges, Cleaning of Bushes, Drainage Spouts, Bearings, Pedestals & Displaying of Sign Board/Informatory Board of Appropriate Size (Two nos boards per bridge are to be displayed) and Miscellaneous Charges not Covered explicitly by Above Items] | ||||
| 2.00Part B : Cost of NDT comprises | ||||
| 2.01 | Rebound Hammer Test | 8,600 | Each | 560 ₹48,16,000 Lowest |
| 2.02 | Ultrasonic Pulse Velocity (UPV) Test | 5,160 | Each | 1,080 ₹55,72,800 Lowest |
| 2.03 | Crack Measurement (by Crack Gauge) | 2,580 | Each | 600 ₹15,48,000 Lowest |
| 2.04 | Core Test | 860 | Each | 2,800 ₹24,08,000 Lowest |
| 2.05 | Half-cell Potential Measurement | 860 | Each | 1,450 ₹12,47,000 Lowest |
| 2.06 | Cover Meter Testing | 5,160 | Each | 400 ₹20,64,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
15 Jun 2026, 3:00 pmClosed
Superintending Engineer and Project Director PIU-I
Office of the Superintending Engineer and Project Director Project Implementation Unit - I,P.W. (Roads) Directorate, 3No. Commissariat Road Hastings Kolkata-700022
Consultancy Services for preparation of Project Report regarding Bridge Management,Inventory,Inspection and Mtc using MBIU for Bridges,Flyovers,ROB(as per IRC SP 35,IRC SP 40) in 3 zones in WB under PWD and PWRD.Package 2 (WZ, PWRD and PWD) (2nd Cal)
2026_WBPWD_5013856_2
WBPWD/PW(R)/SEPD/PIU-I/NIB-01 OF 2026-2027
Open Tender
Consultancy
Item Rate
330 days
West Zone, PWD and PWRD, WB
Please refer Tender documents.
5 documents required · 5 mandatory
₹5 L
Yes
Office of the CE, Bridge Monitoring, South Bengal
21 Jul 2026
8 May 2026
17 Jun 2026
9 May 2026
15 Jun 2026
25 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Cost of Consultancy Services for preparation of Project Report regarding Bridge Management, Inventory, Inspection (by MBIU) and Maintenance for Bridges, Flyovers, ROB (as per IRC:SP:35 & IRC:SP:40) in three different zones in state of West Bengal under Public Works Directorate & Public Works (Roads) Directorate.” Package 2 (PWRD-West Zone & PWD- West Zone) | |||||
| 1 | Part A | 47 | Each | - | - |
| 1.01 | [Note: Part A comprises Cost of Key Personnel, Cost of Sub Professional Staffs or Support Staffs, Rental Charges for Office, Office Furniture, Inspection Vehicle for Staff and Authority Personnel, MBIU Vehicle charges etc., Underwater inspection Charges, Report and printing charges, transportation and accommodation charges, Cleaning of Bushes, Drainage Spouts, Bearings, Pedestals & Displaying of Sign Board/Informatory Board of Appropriate Size (Two nos boards per bridge are to be displayed) and Miscellaneous Charges not Covered explicitly by Above Items] | - | - | - | - |
| 2Part B : Cost of NDT comprises | |||||
| 2.01 | Rebound Hammer Test | 8,600 | Each | - | - |
| 2.02 | Ultrasonic Pulse Velocity (UPV) Test | 5,160 | Each | - | - |
| 2.03 | Crack Measurement (by Crack Gauge) | 2,580 | Each | - | - |
| 2.04 | Core Test | 860 | Each | - | - |
| 2.05 | Half-cell Potential Measurement | 860 | Each | - | - |
| 2.06 | Cover Meter Testing | 5,160 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.04 MB
BOQ_5081724.xls
BOQ • 0.29 MB
1stcorrigendum.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .