| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Agreement Executed |
| 2 | L2₹1.3 Cr+₹1.5 L (1.25%)Rejected-Finance | ₹1.3 Cr+₹1.5 L (1.25%) | L2 | Rejected-Finance Higher rate quoted |
| 3 | L3₹1.3 Cr+₹9.6 L (7.77%)Rejected-Finance | ₹1.3 Cr+₹9.6 L (7.77%) | L3 | Rejected-Finance Higher rate quoted |
| Sl No | Description | Qty | Unit | P. P. SIRAJUDHEEN L2 | ABDU RAHMAN P L3 | P P Musthafa L1 |
|---|---|---|---|---|---|---|
| 1.00Detailed Estimate | ||||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1.2 | cum | 3,327.17 ₹3,992.6 | 3,541.34 ₹4,249.61 | 3,286.02 ₹3,943.22 Lowest |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 31.25 | cum | 1,084.92 ₹33,903.75 | 1,154.76 ₹36,086.25 | 1,071.51 ₹33,484.69 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 185.61 | cum | 233.44 ₹43,329.73 | 248.46 ₹46,117.65 | 230.55 ₹42,793.31 Lowest |
| 1.00 | OD287805/2025-2026:Chemical blasting without using explosive and removing the hard rock (measured in solid) for the site levelling in approved linens and levels by drilling holes of suitable diameter 20cm c/c and filling it with suitable chemical like accones etc. and stacking the serviceable materialesat place pointed out by Departmental officers with lead up to 1000 m | 20 | cum | 5,620.32 ₹1,12,406.4 | 5,982.09 ₹1,19,641.8 | 5,550.81 ₹1,11,016.2 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 22.07 | cum | 7,188.14 ₹1,58,620.69 | 7,650.84 ₹1,68,831.09 | 7,099.25 ₹1,56,659.15 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 143.7 | cum | 288.57 ₹41,466.35 | 307.15 ₹44,136.23 | 285 ₹40,953.36 Lowest |
| 1.01 | OD286583/2025-2026:DRY RUBBLE MASONRY_ Dry rubble Masonry with Departmental Rubble Including All labour charges Carriages etc. complete as per direction of departmental officers at site. | 25.57 | cum | 1,554.79 ₹39,763.75 | 1,654.87 ₹42,323.3 | 1,535.57 ₹39,272.2 Lowest |
| 1.01 | OD286584/2025-2026:Providing and Fixing 63 mm Outer dia 6kg/cm2 PVC pipes as weep holes for retaining wall including all materials and labour charges etc.. complete as per the direction of Engineer at site. | 10.5 | metre | 135.21 ₹1,419.71 | 143.91 ₹1,511.06 | 133.54 ₹1,402.17 Lowest |
| 1.01 | OD286585/2025-2026:Providing and laying in position ready mixed M-25 grade concrete for reinforced cement
concrete work, using cement content as per approved design mix, manufactured in fully
automatic batching plant and transported to site of work in transit mixer for all leads, having
continuous agitated mixer, manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering, shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete,
improve workability without impairing strength and durability as per direction of the Engineer -
in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess cement
used as per design mix is not payable separately. All wiork upto plinth level | 80.84 | cum | 9,867.24 ₹7,97,628.21 | 10,502.38 ₹8,48,970.39 | 9,745.21 ₹7,87,763.8 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹50,000
Closing Date
5 Mar 2026, 3:00 pmClosed
Superintending Engineer
O/o the Superintending Engineer PWD Buildings North Circle, Kozhikode. PIN 673001 Tel.No. 0495 2720812
Construction of Lift and Ramp Facilities and Face Shift of Main Block Building.
2026_PWD_841119_1
PWD/BLDG/TR/1504/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
365 days
Kondotty
Please refer Tender documents.
12 documents required · 12 mandatory
₹5,515
Yes
₹50,000
Yes
3 Jul 2026
26 Feb 2026
7 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed Estimate | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.002 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | - | cum | - | - |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.6 | cum | - | - |
| 1.004 | OD287805/2025-2026:Chemical blasting without using explosive and removing the hard rock (measured in solid) for the site levelling in approved linens and levels by drilling holes of suitable diameter 20cm c/c and filling it with suitable chemical like accones etc. and stacking the serviceable materialesat place pointed out by Departmental officers with lead up to 1000 m | - | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 0.4 | cum | - | - |
| 1.007 | OD286583/2025-2026:DRY RUBBLE MASONRY_ Dry rubble Masonry with Departmental Rubble Including All labour charges Carriages etc. complete as per direction of departmental officers at site. | 1 | cum | - | - |
| 1.008 | OD286584/2025-2026:Providing and Fixing 63 mm Outer dia 6kg/cm2 PVC pipes as weep holes for retaining wall including all materials and labour charges etc.. complete as per the direction of Engineer at site. | - | metre | - | - |
| 1.009 | OD286585/2025-2026:Providing and laying in position ready mixed M-25 grade concrete for reinforced cement
concrete work, using cement content as per approved design mix, manufactured in fully
automatic batching plant and transported to site of work in transit mixer for all leads, having
continuous agitated mixer, manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering, shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete,
improve workability without impairing strength and durability as per direction of the Engineer -
in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess cement
used as per design mix is not payable separately. All wiork upto plinth level | 0.4 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1418224.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1418224.xls
BOQ • 0.33 MB
CORI.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .