| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.6 LRejected-AOC | ₹1.6 L | L2 | Rejected-AOC Accepted |
| 3 | L3₹1.7 LRejected-AOC PUTHUSSERIPADY HOUSE KALYANAPATTA KANNIMARI P O 678103 | KANNIMARI | PALAKKAD | KERALA | 678103 | ₹1.7 L | L3 | Rejected-AOC Accepted |
| 4 | L4₹1.7 LRejected-AOC | ₹1.7 L | L4 | Rejected-AOC Accepted |
| Sl No | Description | Qty | Unit | TOMEY RAPHAEL L3 | Rahulan C L1 | BIJU. K L4 | SIVAN G L2 |
|---|---|---|---|---|---|---|---|
| 1.00Field channel. | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 60 | sqm | 15.28 ₹916.80 | 13.86 ₹831.60 | 15.3 ₹918 | 14.53 ₹871.80 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 2.62 | cum | 2,114.22 ₹5,539.26 | 1,917.95 ₹5,025.03 | 2,116.8 ₹5,546.02 | 2,010.78 ₹5,268.24 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 7.2 | cum | 302.16 ₹2,175.55 | 274.11 ₹1,973.59 | 302.52 ₹2,178.14 | 287.38 ₹2,069.14 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.2 | cum | 6,663.63 ₹47,978.14 | 6,044.86 ₹43,522.99 | 6,671.56 ₹48,035.23 | 6,337.59 ₹45,630.65 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 81.95 | sqm | 324.37 ₹26,582.12 | 294.25 ₹24,113.79 | 324.76 ₹26,614.08 | 308.5 ₹25,281.58 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 8 | cum | 7,198.08 ₹57,584.64 | 6,529.68 ₹52,237.44 | 7,206.65 ₹57,653.20 | 6,845.89 ₹54,767.12 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.11 | cum | 8,810.57 ₹995.59 | 7,992.44 ₹903.15 | 8,821.06 ₹996.78 | 8,379.48 ₹946.88 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.6 | cum | 7,758.21 ₹12,413.14 | 7,037.81 ₹11,260.50 | 7,767.45 ₹12,427.92 | 7,378.62 ₹11,805.79 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 13.56 | kilogram | 94.44 ₹1,280.61 | 85.67 ₹1,161.69 | 94.55 ₹1,282.10 | 89.82 ₹1,217.96 |
Tender Value
₹2.0 L
EMD Value
₹4,976
Closing Date
9 Feb 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer Irrigation Division Chittur
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
2026_Irrig_831637_1
IRR/PI/TR/304/2026_5_1_1/1
Open Tender
Civil Works - Canal
180 days
chittur
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
₹4,976
Yes
12 Mar 2026
29 Jan 2026
11 Feb 2026
30 Jan 2026
9 Feb 2026
30 Jan 2026
30 Jan 2026 - 3 Feb 2026
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1397498.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid