| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-Finance | ₹1.4 Cr | 1 | Accepted-Finance ok |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | Devendra Construction L1 |
|---|---|---|---|---|
| 1.00Road Work | ||||
| 2.00 | Excavation in foundation in all type of rocks and soils including all lead and lifts and disposal of all excavated materials as per direction of Engineer in-charge. | 52.22 | Cum | 417 ₹21,775.74 |
| 3.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets,scuppers, etc. including supply ofall material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 147.8 | Cum | 4,000 ₹5.9 L |
| 4.00 | R.R. stone masonry laid dry cement sand Motar including supply of all material labour and T&P etc. required for proper completion of the work. | 126.85 | Cum | 2,260 ₹2.9 L |
| 5.00 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 12.87 | Cum | 1,035 ₹13,320.45 |
| 6.00 | Cement plum masonry with 40% plum & 60% 1:3:7 cement cum concrete including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications | 76.5 | Cum | 4,550 ₹3.5 L |
| 7.00 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions). | 4 | Nos | 8,170 ₹32,680 |
| 8.00C/O 1 m span scupper with CC base . Metre Construction of 1 m span scupper of RR 1: 6 abutment ,RCC slab as per attached drawing including supply of all material, labour, T&P etc. required for proper completion of the work. | ||||
| 9.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per
direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 96.95 | Cum | 417 ₹40,428.15 |
| 10.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 M10 in foundation | 5.04 | Cum | 6,670 ₹33,616.80 |
Tender Value
₹1.8 Cr
EMD Value
₹3.0 L
Closing Date
13 May 2026, 2:00 pmClosed
Superintending Engineer
SE 6th Circle PWD Uttarkashi
Construction of helipad boundary wall and strengthening of road from Km 2.00 of Barkot-Paunti motor road towards Barkot helipad under Yamunotri constituency in dist. Uttarkashi
2026_pwd_94222_1
1333/56M-06/2026 Dated 04/04/2026
Open Tender
Civil Works - Roads
365 days
Barkot
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
EE CD PWD Barkot
₹3.0 L
SE 6th Circle PWD Uttarkashi
19 Jun 2026
14 Apr 2026
14 May 2026
15 Apr 2026
13 May 2026
24 Apr 2026
22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Road Work | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Excavation in foundation in all type of rocks and soils including all lead and lifts and disposal of all excavated materials as per direction of Engineer in-charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets,scuppers, etc. including supply ofall material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | R.R. stone masonry laid dry cement sand Motar including supply of all material labour and T&P etc. required for proper completion of the work. | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 5 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 6 | Cement plum masonry with 40% plum & 60% 1:3:7 cement cum concrete including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 7 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions). | - | Nos | - | - | BI01010001010000000000000515BI0100001118 |
| 8 | C/O 1 m span scupper with CC base . Metre Construction of 1 m span scupper of RR 1: 6 abutment ,RCC slab as per attached drawing including supply of all material, labour, T&P etc. required for proper completion of the work. | - | - | - | - | BI01010001010000000000000515BI0100001119 |
| 9 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per
direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | - | Cum | - | - | BI01010001010000000000000515BI0100001120 |
| 10 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 M10 in foundation | - | Cum | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.85 MB
SBD.pdf
Tender Documents • 4.60 MB
BOQ_111517.xls
BOQ • 0.28 MB