Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Hard copy of CDR Not submitted. |
Tender Value
₹27.6 L
EMD Value
₹55,200
Closing Date
5 Sept 2024, 4:00 pmClosed
Executive Engineer I and F C Division Kargil
Executive Engineer I and F C Division Kargil
Construction of Right side distributary of Azoori to Shahi Bagh irrigation canal Drass by way of cement concrete channel
2024_PWD_13861_2
e-tender 21 of 2024-25-I-FC Kargil.
Open Tender
Civil Works - Canal
Works
90 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹280
Payable To Executive Engineer I and F C Division K
₹55,200
6 Sept 2024
27 Aug 2024
6 Sept 2024
28 Aug 2024
5 Sept 2024
28 Aug 2024
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30cm & up to 1.5mte in depth, 1.5mtr in width as well as 10sqm on plan) including Disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed.
All kind of soil 60%
Ordinary rock 30%
Hard Rock (BP) 10%
Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in:
All kind of soil 60%
Ordinary rock 30%
Hard Rock (BP) 10%
Dumping /filling of stone in horizontal on level excluding cost of stone but including all carriage complete.
Providing and laying in position cement concert of specified grade excluding the cost of centering and shuttering. All work upto plinth lent 1:4:8( 1 cement: 4 coarse sand 8 graded stone agg. 40mm nominal size nallah including all carriage complete.
Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 20mm nominal size) nallah including all carriage complete..
Cement concrete flooring 1:2:4 (1cement:2 course sand:4 graded stone agregade) finished with a floatin coat of neat cement including cement slurry ,but excluding soct of nosing of steps etc. complete 50mm thick with 20mm nominal size stone agregate nallah including all sorts of carriage complete
Centring and shuttering including strutting propping etc,and removal of form work for Walls (any thickness) incld. attached pilasters, buttresses, plinth & string courses etc. incl. form work for suspended floor Foundations etc, Complete job
ABDUL BASIT JAHANGIR (BID ID -133855)
ABDUL AZIZ (BID ID -133788)
M/S FEROZ AHMAD (BID ID -133892)
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .