Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹87.9 LAccepted-AOC | 1 | Accepted-AOC RANK 1 | |
| 2 | 2₹97.4 L+₹9.5 L (10.8%)Rejected-Finance SUNAM DISTT SANGRUR MC FUNDS 2023 24 WORK CODE SGR 2024 024 MC SUNAM DISTT SANGRUR | SANGRUR | PUNJAB | 148001 | 2 | Rejected-Finance RANK 2 |
Tender Value
₹79.3 L
EMD Value
₹1.6 L
Closing Date
19 Sept 2024, 2:00 pmClosed
XEN LDH CANAL AND GROUND WATER DIVN WRD PB LDH
XEN LDH CANAL AND GROUND WATER DIVN WRD PB LDH
Estimate for Reconstruction of head regulator of 1-R distributary of sidhwan branch
2024_WR_126607_1
3120/28A
Open Tender
Civil Works
Item Rate
120 days
LUDHIANA
Estimate for Reconstruction of head regulator of 1-R distributary of sidhwan branch
2 documents required · 2 mandatory
₹5,000
₹1.6 L
Yes
XEN LDH CANAL AND GROUND WATER DIVN WRD PB LDH
26 Oct 2024
3 Sept 2024
19 Sept 2024
3 Sept 2024
19 Sept 2024
3 Sept 2024
12 Sept 2024
Amount
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil.In Ordinary soil (A) Manual Means (a) Depth upto 3 m
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.(C) RCC Grade M20.((ii)) With Batching Plant, Transit Mixer and Concrete Pump
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specification (E) RCC Grade M25((ii)) With Batching Plant, Transit Mixer and Concrete Pump
BRIDGES- FOUNDATIONS &SUB- STRUCTURE-(21.33) Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications.
Dressing bed and preparation of sub grade for lining.
SUPPLY of multipurpose HETIV GREASE
SUPPLY OF MULTIGRID MOBILE OIL
COMMISSIONING AND TESTING OF GATES AT SITE COMPLETE IN ALL RESPECTS TO ENTIRE SATISFACTION OF EIC
PROVIDING CHEQUERED PLATE 8mm
SUPPLY OF SKIN PLATE
PROVIDING AND FIXING IN POSITION OF FLAT/WEDGE SEAL I/C PREPARATION OF SURFACE COMPLETE IN ALL RESPECTS AND TO ENTIRE SATISFACTION OF ENGINEER IN CHARGE
PROVING AND FIXING OF HOLLOW BULB SEAL 44mm DIA I/C PREPARATION OF SURFACE COMPLETE IN ALL RESPECTS AND TO ENTIRE SATISFACTION OF EIC
SUPPLY AND FIXING OF SPINDLE COVERS (PIPE OF APPROPRIATE DIA) NBD=100
PROVIDING AND FIXING OF GALVANIZED NUTS AND BOLTS OF ALL SIZES AND LENGTH REQUIRED
FILLET WELDING WITH High strength steel rods complete in all respects and to to entire satisfaction of EIC 8mm thickness
MS- SPINDLE WITH DOUBLE START OR TRIPLE THREADING 11‘ HEIGHT 1 3/4" DIA COMPLETE UPTO 1.5 TON CAPACITY
PROVIDING AND FIXING 7WATT LED 40WATT SOLAR PANEL 12V-40ah T-YELBATTERY WITH 7 METER POLE FIXING WITH 1:2:4 CC FOUNDATION OF SIZE 1.2x0.6x0.75 COMPLETE IN ALL RESPECTS TO ENTIRE SATISFACTION OF EIC
SUPPLY OF GI PIPE HOLLOW/ PIPE OF ANY SIZE
GATE WHEEL ASSEMBLY COMPLETE IN ALL RESPECTS TO THE ENTIRE SATISFACTION OF EIC 160mm DIA
HIRE CHARGES OF MACHINERY Cranes 35 tonnes
REMOVING DAMAGED STRUCTURAL STEEL AND STACKING CLEAR FROM WORKING SPACE BY GAS CUTTING, COMPLETE IN ALL RESPECTS TO THE ENTIRE SATISFACTION OF EIC
Advance Direction sign board 1200x900mm rectangular per IRC 67- 2012 with high intensity Microprismatic grade retro reflective Sheeting as per ASTM D 4956 – 09 and as per IRC 67 – 2012. grade sheeting fixed over 4mm thick Aluminium Composite Material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on two square hollow steel section post 60x60x3.2mm conforming to IS 4923 firmly fixed to ground in foundation concrete M-25 of size 0.60x0.60x0.75m for vertical post complete as per clause 801 of MORT&H specifications.Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting & a certified copy of test reports from an independent test laboratory conforming to clause 6.7 of IRC 67-2012 . ((a)) Using high intensity Microprismatic grade retro reflective Sheeting Type XI as per ASTM D 4956 09 and as per IRC 67 2012
FIXING OF FOR COMMONSHAFT WITH SUPPLY OF SPINDLE SHAFT COUPLING RODS AND COVER COMPLETE IN ALL RESPECTS TO THE ENTIRE SATISFACTION OF EIC
WHITE WASHING, DISTEMPERING, PAINTING & POLISHING -(16.2) Applying priming coat with metal primer on new steel or iron work including preparation of surface.
WHITE WASHING, DISTEMPERING, PAINTING & POLISHING 16.21) Painting two or more coats excluding priming coat with ready mixed paint for metallic surfaces in all shades on steel or iron work
WHITE WASHING, DISTEMPERING, PAINTING & POLISHING (16.27) Painting two or more coats with anticorrosive bitumastic Paint to give an even shade
STEEL AND IRON WORK (18.1) Steel work fixed independently without connecting plates including cutting hoisting and fixing in position ((c) ) Tees angles & channels
DISMANTLING (8.5) Dismantling brick work tile, masonry or tile lining. ((b)) In cement
Dismantling concrete.((b)) Cement concrete plain 1:4:8 or 1:5:1
Dismantling concrete.((e)Reinforced cement concrete
Cutting of trees of all girth and heidht with roots in non forest section for which statutory permission has been obtained by the PIU. Trees shall be the property of PIU and the Contractor will transport and store in the place designated by the Owner with 20 Km lead. Number of trees are estimated on the basis of site visits and survey. However, the number may vary due to non availability of fixed transmission lines.
Compensatory Plantation against cutting of trees in the ratio of 1:10 with 3 years full maintenance to give minimum 95% survival rate. All dead plants to be replaced with healthy plant to give desirable survival rate. Supply & Planting of trees in identified area for varieties such as Shisham, Neem, Pilkhan, Pipal, Mango, Arjun, Siris etc suitable to the area in aprrox 0.60 m dia holes and 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering including cost of labour and materials as per direction of Engineer-in-charge and maintaining the plants for three years.
Ambient Air Quality Monitoring through High Volume Samplers and com of Test Reports- 24 hourly for 4 twice a month for 36 months 3 locations around WTP site and 24 hourly for 48 hours duration of 6 months at each of 77 proposed OHSR locations
Noise quality monitoring
Surface water quality
Ground Water quality
Soil quality
Conducting quarterly HIV/AIDS/ GBV Awareness Programme and testing on site, on quarterly basis, for not less than 90% of all workers including migrant and local labours as well as willing persons from surroundings through approved specialised agency with approval from Engineer-In- Charge, Provide and maintain condom dispenser at base camp and labour camp, Provide and maintain HIV/AIDS awareness posters, etc, inclusive of direct and indirect costs. Fine for not conducting check-ups. During Construction period.
Camps for Health Check-up and diagnostic tests (quarterly)
Training camps (quarterly)
Daily housekeeping, Cleaning of residual materials and waste from the labour camps and all working sites clearance of all sites including WTP OHSRs and Transmission lines from encumbrance after completion any of Work. Penalty applicable, if sites not cleared within stipulated timeframe. Per site (i) Cleaning of the Toilets at WTP Site, & labour camp
Daily housekeeping, Cleaning of residual materials and waste from the labour camps and all working sites clearance of all sites including WTP OHSRs and Transmission lines from encumbrance after completion any of Work. Penalty applicable, if sites not cleared within stipulated timeframe. Per site(ii) Cleaning of the Toilets at OHSR sites.
(i)Construction and provision of Toilets and bathroom units with septic tanks and soak pit for male and female workers separately in the camp site & offices as per specification of Swatch Bharat Abhiyaan/ CPWD with proper water supply, drainage system, electric supply and proper access. Penalty applicable if Toilets not provided.
Labour Camp Site & offices
(ii) Toilets to be developed at each OHSR Site to be used by the labour engaged for the construction activity. They may be ESS connected to city sewerage system and also permitted to be used by Public at large. The cost includes water soap & colour wash & maintenance at each toilet for 36 months. Penalty applicable, if Toilets not provided or cleaned
(iii) The units shall be maintained by daily cleaning six times a day for 36 months at Labour Camp. The toilets at OHSR sites may be maintained by Contractor's staff Daily Cleaning 6 times in a day
(i) Ambient Air Quality Monitoring through High Volume Samplers and compilation of Test Reports- 24 hourly once a month for for 36 months at 1 locations in WTP site 50 m downwind direction
(ii) Waste water sample. As per Effluent Standards
Providing PPE s to workers and other Safety arrangement for workers, Engineer, Staff. All workers, Engineers, Staff, Ear Plugs, Helmets, Masks, Boots, Fluorescent Jackets, Traffic management Torches etc. Fine applicable for not using PPE at three times the cost. During whole construction period
For Monitoring the performance Indicators which includes hiring of a personnel to Monitor the Traffic Management, Deployment of Fluorescent Lights, Batons, Fencing lighting beads, Providing Health Safety Gear/PPE, Monitoring and Reporting the gender issues, Monitoring of C&D waste removal, Monitoring the Health check ups. of the workers, Plantation. Preparing the record for any deviations in the above performance indicator
(ii) Waste water sample. As per Effluent Standards
Providing PPE s to workers and other Safety arrangement for workers, Engineer, Staff. All workers, Engineers, Staff, Ear Plugs, Helmets, Masks, Boots, Fluorescent Jackets, Traffic management Torches etc. Fine applicable for not using PPE at three times the cost. During whole construction period
For Monitoring the performance Indicators which includes hiring of a personnel to Monitor the Traffic Management, Deployment of Fluorescent Lights, Batons, Fencing lighting beads, Providing Health Safety Gear/PPE, Monitoring and Reporting the gender issues, Monitoring of C&D waste removal, Monitoring the Health check ups. of the workers, Plantation. Preparing the record for any deviations in the above performance indicator
The Bahadarpur Co operative L and C society Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .