Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.4 LAccepted-AOC DMFT MADHARGAT TATICHHARIYA PRAHAND ANTARGAT KASTURBA GANDHI BALIKA AWASIYA VIDYALAYA TATICHHARIYA | KHUNTI | JHARKHAND | 835209 | ₹40.4 L | L1 | Accepted-AOC Rate Quoted Below of BOQ Amount |
| 2 | Rejected-Technical 87 | DHANBAD | JHARKHAND | 818142 | - | - | Rejected-Technical L2 |
Tender Value
₹40.5 L
EMD Value
₹82,000
Closing Date
2 May 2026, 5:00 pmClosed
Exe Eng R D Spl Div, Dhanbad
Exe Eng R D Spl Div, Dhanbad
Construction of large drain with slab at Ansar Mohalla, in Nirsa under Nirsa Block in Dhanbad Dist
2026_RDSPL_113091_1
03/2026-27/RDSD/EE/Dhanbad/2nd Call/Gr.01
Open Tender
Civil Works
Percentage
120 days
Nirsa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹82,000
1 Aug 2026
25 Apr 2026
4 May 2026
25 Apr 2026
2 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. | 955.5 | Cum. | 55.8 | ₹53,316.9 |
| 2 | Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed , placed in foundation and compacted by vibration including curing for 14 days | 73.5 | Cum. | 3,376.1 | ₹2,48,143.35 |
| 3 | Plain/reinforced cement concrete in Substructure complete as per drawing and technical specifications | 294.9 | Cum. | 4,499.7 | ₹13,26,961.53 |
| 4 | Supplying ,fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specification | - | Tonne. | 87,394.8 | - |
| 5 | Carriage of Materials Cement- | 119.24 | mt | 595.6 | ₹71,019.34 |
| 6 | Sand - | 165.79 | m3 | 283 | ₹46,918.57 |
| 7 | Stone chips | 331.56 | m3 | 338.2 | ₹1,12,133.59 |
| 8 | steel | - | mt | 595.6 | - |
| 9 | Goods & Service Tax (G.S.T.) - | - | Rs. | 0.18 | - |
| 10 | Labour Cess - | - | Rs. | 0.01 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
SBDNit03Gr01.pdf
Tender Documents • 1.36 MB
BOQ_152683.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .