Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹11.8 L+₹17,400 (1.50%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹12.0 L+₹44,039 (3.80%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹12.0 L
EMD Value
₹24,000
Closing Date
13 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DC works
Ftr HQ BSF Tripura Salbagan Campus Agartala
CO Retaining wall back side of CHDH at BOP Sonaichera of 97 BN BSF under SHQ BSF Panisagar
2026_BSF_928745_1
IGA/ENGG/E-NIT (CIVIL)/26-27/22
Open Tender
Civil Works
Percentage
120 days
97 BN SHQ BSF Panisagar
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹24,000
10 Nov 2026
3 Oct 2026
14 Oct 2026
3 Oct 2026
13 Oct 2026
3 Oct 2026
75 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. All kinds of soil | 90.38 | cum | 177.5 | ₹16,042.45 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.3 | cum | 6,518.6 | ₹28,029.98 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 40.63 | cum | 9,045.75 | ₹3,67,528.82 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 100 | sqm | 842.5 | ₹84,250 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 2,302.88 | kg | 107.85 | ₹2,48,365.61 |
| 6 | Supplying and stacking at site. Good earth. | 59.76 | cum | 775.5 | ₹46,343.88 |
| 7 | correction factor @ 0.973 on DSR items | 1 | Fixed | -21,346.15 | - |
| 8 | Add Cost Index @ 56.00 % on DSR 2023 | 1 | Fixed | 4,30,760.88 | ₹4,30,760.88 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_976011.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .