| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance HARICHANDANPUR BLOCK OF KEONJHAR DISTRICT | -27.00% | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹4.8 LAdmitted-Finance | -23.00% | ₹4.8 L | L2 | Admitted-Finance |
| 3 | L3₹5.2 LAdmitted-Finance | -16.00% | ₹5.2 L | L3 | Admitted-Finance |
| 4 | L4₹6.2 LAdmitted-Finance | -0.10% | ₹6.2 L | L4 | Admitted-Finance |
Tender Value
₹6.2 L
EMD Value
₹6,300
Closing Date
8 Apr 2026, 5:00 pmClosed
GM(C), OMC Ltd.
Office of the GM(C), OMC Ltd., Bhubaneswar
Restoration of damaged compound wall main road side at Salandi vihar colony , Bangur chromite Mines in the District of Keonjhar.
2026_OMC_127556_1
NIT No.11/OMC/CIVIL/2026
Open Tender
Civil Works - Others
120 days
BANGORE
RC, EPF Regd., GSTN, PAN, Registration in CDMS portal, Affidavits, experience, etc. as per DTCN requirements.
2 documents required · 2 mandatory
₹4,720
₹6,300
Yes
24 Apr 2026
25 Mar 2026
9 Apr 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Civil works | ||||||
| 1.01 | Dismantling brick or stone masonry in cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50m lead. including cost of all labours,T & P required for the work etc. Complete as directed by EIC. | - | Cum | - | - | BI01010001010000000000000515BI0100001112 |
| 1.02 | Earth work in excavation of foundation trenches in ordinary soil with 500 mtr. initial lead and 1.5m initial lift including rought dressing and levelling the bed and depositing the excavated materials at places away from the work site with all leads, lifts, T&P required for the work complete as per direction of EIC. | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 1.03 | Excavation of foundation in laterite rock or any hard rock (other than granite or disintegrated rock) removed by chiselling including dressing and levelling the bed not exceeding 1.5 mt in depth and depositing the soil within 5.00 km lead as per specification approved by the department and as per direction of the EIC. | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 1.04 | Filling foundation and plinth with river sand, well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P etc required to complete the work in all respect as per direction of EIC. | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.05 | C.C of prop. (1:3:6) in foundation using 40mm. Size B.H.C.B chips of approved quality from approved quarry including lowering,laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalities of all materials,cost of all labour,T&P etc required to complete the work in all respect as per direction of EIC. | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.06 | R.C.C. work of M-25 having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. In Footing | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.07 | R.C.C. work of M-25 having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. In pedestal | - | Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.08 | R.C.C. work of M-25 having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Plinth Beam | - | Cum | - | - | BI01010001010000000000000515BI0100001119 |
| 1.09 | R.C.C. work of M-25 having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. In Column of Ground Floor | - | Cum | - | - | BI01010001010000000000000515BI0100001120 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
SBD_1.pdf
Tender Documents • 3.17 MB
BOQ_586174.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid